TenderDekho Logo
GEM

Chennai Petroleum Corporation Limited procurement tender Tiruvallur Tamil Nadu 2026 CPCL PBG Third Party Inspection

Bid Publish Date

03-Apr-2026, 12:45 pm

Bid End Date

30-Apr-2026, 5:00 pm

Generate Docs

Progress

RA
Issue03-Apr-2026, 12:45 pm
Corrigendum27-Apr-2026
Reverse Auction08-Jul-2026, 2:00 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1024

Category

4802070524

Bid Type

Two Packet Bid

Categories 13

Tender Overview

Chennai Petroleum Corporation Limited invites bids for a broad procurement across 64 BOQ items located in Tiruvallur, Tamil Nadu. The opportunity references CPCL procurement and requires a PBG (Performance Bank Guarantee) post-order and Third Party Inspection as per CPCL tender terms. Although specific item specifications are not published in the summary, bidders should prepare for a comprehensive supply/service scope with potential multi-item coordination. The tender emphasizes compliance with CPCL’s internal processes and the need to align with the attached specification document. A pre-qualification emphasis exists through the PBG and inspection requirements, indicating a focus on reliability and quality control. The absence of item-level specifications in this data highlights the importance of reviewing the full tender document to confirm exact categories, delivery expectations, and acceptance criteria.

Technical Specifications & Requirements

  • PBG (Performance Bank Guarantee) applicable; Provide CPCL PBG format after order placement.
  • Third Party Inspection to be conducted as per CPCL tender documentation.
  • Tender references are contingent on the attached specification document; bidders must refer to the official CPCL Tender Document for item-specific requirements.
  • Total items: 64; BOQ items are listed but individual quantities are not disclosed in the summary data.
  • Actively plan for post-award quality checks, vendor compliance, and coordination with CPCL inspection authorities.
  • Ensure readiness to comply with CPCL’s standard terms and conditions (to be clarified in the specification booklet).

Terms, Conditions & Eligibility

  • PBG is required; submit in the CPCL PBG format after order placement.
  • Third Party Inspection is mandatory, as stipulated in CPCL tender documents.
  • Bidder must refer to the attached specification document for exact requirements; ensure alignment with CPCL tender terms.
  • 64 BOQ items imply a broad procurement scope; confirm item-wise requirements in the full tender packet.
  • Await further details in the specification document for delivery timelines, payment terms, and penalties.
  • Compliance with CPCL’s general terms and any organization-specific ATC clauses is mandatory.

Key Specifications

  • 64 total BOQ items indicate a broad procurement scope

  • PBG (Performance Bank Guarantee) required in CPCL format

  • Third Party Inspection mandatory per CPCL terms

  • No item-level specifications provided in overview; rely on full CPCL specification document

  • Delivery/compliance terms to be confirmed after reviewing CPCL tender packet

Terms & Conditions

  • PBG must be provided in CPCL format after order placement

  • Third Party Inspection is compulsory according to CPCL tender documentation

  • Review attached CPCL specification document for item-specific requirements

Important Clauses

Payment Terms

Not disclosed in summary; refer to CPCL ATC and specification document for payment milestones and schedule.

Delivery Schedule

Not disclosed in summary; full tender packet will define timelines aligned with 64 BOQ items.

Penalties/Liquidated Damages

Not disclosed in summary; penalties likely governed by CPCL standard terms in the full specification.

Bidder Eligibility

  • Past experience in supplying similar equipment/services to PSUs or large corporates

  • Financial stability evidenced by audited statements

  • GST and PAN compliant bidder with valid registrations

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

4802070524 , 4829441604 , 4849090564 , 4849091064 , 4849100564 , 4849161584 , 4849162064 , 4849168964 , 4849172824 , 4858711064 , 4858742354 , 4858850564 , 4858910024 , 4858910034 , 4859162104 , 4859342334 , 4859291264 , 4859490764 , 4860418344 , 4860419014 , 4860596304 , 4860596324 , 4860596334 , 4860596344 , 4860656374 , 4860656534 , 4860662964 , 4860671584 , 4859291794 , 4860992304 , 4861931064 , 4877822664 , 4878790394 , 4878791064 , 4878850594 , 4879441604 , 4885320034 , 4888371224 , 4889260564 , 4861080504 , 4834773084 , 4858061264 , 4849171794 , 4878772844 , 4834092464 , 4858701264 , 4866301264 , 4858710564 , 4878772494 , 4878771264 , 4887851264 , 4878790364 , 4873460574 , 4819860084 , 4823023522 , 4878813134 , 4878850394 , 4887881064 , 4861260564 , 4861261064 , 4879311224 , 4866380564 , 4889620374 , 4879261064

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASCHENNAI PETROLEUM CORPORATION LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9186779.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 64 Items Sign in for GEM prices

#1

4802070524

VLV,A216,WCB,BALL,Cr13%,FL,150,3/4IN

25 ea Delivery: 90 days
#2

4829441604

VLV,CHK,A351,CF8C,SS321,FL,600,3IN

5 ea Delivery: 90 days
#3

4849090564

VLV,GT,A182GR.F316,SS316,SW,800,3/4IN

50 ea Delivery: 90 days
#4

4849091064

VLV,GT,A182GR.F316,SS316,SW,800,1 1/2IN

25 ea Delivery: 90 days
#5

4849100564

VL,GT,A182F11CL2,13%,ST,SW,800,3/4IN,IBR

50 ea Delivery: 90 days
#6

4849161584

VLV,GT,A216WCB,13%CR,STLD,FL,300,3IN

10 ea Delivery: 90 days
#7

4849162064

VLV,GT,A216WCB,13%CR,STLD,FL,150,6IN

10 ea Delivery: 90 days
#8

4849168964

VLV,GATE,A216WCB,13%CR,FLNG,150,3IN,LC

10 ea Delivery: 90 days
#9

4849172824

VL,GT,A216WCB,13%CR,ST,FL,300,14IN,IBR

10 ea Delivery: 90 days
#10

4858711064

VLV,GT,A182F11,13%CR+ST,SW,800,1.5IN

80 ea Delivery: 90 days
#11

4858742354

VLV,GT,A217WC6,13%CR+ST,FLG,600,2IN

6 ea Delivery: 90 days
#12

4858850564

GT VLV,REG,SW,A105,STEM SS304,800,3/4IN

50 ea Delivery: 90 days
#13

4858910024

GTV,LONG,ST,SW,LTCS,A350,LF2,800,3/4IN

30 ea Delivery: 90 days
#14

4858910034

GTV,LONG,ST,SW,LTCS,A350,LF2,800,1IN

15 ea Delivery: 90 days
#15

4859162104

VLV,GT,FL,A217 WC6,13Cr,600,6IN,IBR

5 ea Delivery: 90 days
#16

4859342334

VLV,GT,BW,A217WC6,13CR,1500,8IN,IBR

4 ea Delivery: 90 days
#17

4859291264

VALV,GATE,RF,A216,WCB,13%CR+STLD,2IN,600

18 ea Delivery: 90 days
#18

4859490764

VLV,GT,BW,A182 F11,CL.2,1IN,1500

6 ea Delivery: 90 days
#19

4860418344

VLV,GT,A105,13%CR,SW,3000,1IN

5 ea Delivery: 90 days
#20

4860419014

VLV,GT,A105,13%CR,SW,3000,1 1/2IN,

5 ea Delivery: 90 days
#21

4860596304

VLV,GT,A216WCB,13%CR,FLG,300,2IN,IBR

10 ea Delivery: 90 days
#22

4860596324

VLV,GT,A216WCB,13%CR,FLG,300,6IN,IBR

10 ea Delivery: 90 days
#23

4860596334

VLV,GT,A216WCB,13%CR,FLG,300,8IN,IBR

10 ea Delivery: 90 days
#24

4860596344

VLV,GT,A216WCB,13%CR,FLG,300,10IN,IBR

15 ea Delivery: 90 days
#25

4860656374

GT,VLV,FLGD,CS,A216WCB,300,10IN

10 ea Delivery: 90 days
#26

4860656534

GT,VLV,FLGD,CS,A216WCB,150,14IN

5 ea Delivery: 90 days
#27

4860662964

VLVGT,FLCS,GO A216 WCB 13%CR150 16IN IBR

5 ea Delivery: 90 days
#28

4860671584

VL,GT,FL,A216,GR WCB,3IN, 300,API-600

5 ea Delivery: 90 days
#29

4859291794

VALV,GATE,RF,A216,WCB,13%R+STLD,4IN 600

18 ea Delivery: 90 days
#30

4860992304

VLV,GT,FL,AS,A217,GR.WC6, 600 8IN IBR

6 ea Delivery: 90 days
#31

4861931064

VLV,GT,A182 F304,SS304,800,SW,1.5IN

10 ea Delivery: 90 days
#32

4877822664

VLV,GT,A217 WC6,13%Cr,FL,600,12IN,IBR

5 ea Delivery: 90 days
#33

4878790394

VLV,GT,A105,13%Cr,SW,1500,1/2IN,IBR

25 ea Delivery: 90 days
#34

4878791064

VLV,GT,WEDGE,A105,13%Cr,SW,800,1.5IN,IBR

35 ea Delivery: 90 days
#35

4878850594

VLV,GT,A182F11,A182F11,SW,1500,3/4IN,IBR

75 ea Delivery: 90 days
#36

4879441604

VLV GATE RF A351 CF-8C 600 3IN

5 ea Delivery: 90 days
#37

4885320034

GLB,LONG,ST,SW,LTCS,A350,LF2,800,1 1/2IN

10 ea Delivery: 90 days
#38

4888371224

VLV,GLB,A216,WCB,13%CR,FLG,150,2IN

10 ea Delivery: 90 days
#39

4889260564

VLV,GLB,A182F316L,A182F316L,SW,800,3/4IN

10 ea Delivery: 90 days
#40

4861080504

VLV GT WEDGE A182 GR.F304 SW 800 3/4IN

75 ea Delivery: 90 days
#41

4834773084

VLV CHK SWING A216 WCB SS304 FL 300 2IN

4 ea Delivery: 90 days
#42

4858061264

VLV,GATE,CS,A216 WCB,13%CR,600,2IN,IBR

10 ea Delivery: 90 days
#43

4849171794

VL,GT,A216WCB,13%CR,ST,FL,600,4IN,IBR

5 ea Delivery: 90 days
#44

4878772844

VLV,GT,WEDG,A216WCB,13CR,FL,600,14IN,IBR

3 ea Delivery: 90 days
#45

4834092464

VLV,CHK,SWING,A216WCB,13%Cr,FLG,150,10IN

3 ea Delivery: 90 days
#46

4858701264

VLV,GT,A217WC6,13%CR+ST,FLG,600,2IN,H2

3 ea Delivery: 90 days
#47

4866301264

VALVE,GATE,A351 GR.CF8C,RF,2INX600

3 ea Delivery: 90 days
#48

4858710564

VLV,GT,A182F11,13%CR+ST,SW,800,0.75IN

45 ea Delivery: 90 days
#49

4878772494

VLV,GT,WEDG,A216WCB,13%Cr,FL,600,10IN,IB

1 ea Delivery: 90 days
#50

4878771264

VLV,GT,WDGE,A216WCB,13%Cr,FL,600,2IN,IBR

1 ea Delivery: 90 days
#51

4887851264

VLV GLB,FL,CS,A216,GR WCB,600,2IN, IBR

1 ea Delivery: 90 days
#52

4878790364

VLV,GT,WEDGE,A105,13%Cr,SW,800,1/2IN,IBR

25 ea Delivery: 90 days
#53

4873460574

VLV,GLB,SW,A105,13CR,1/2IN,800,IBR

10 ea Delivery: 90 days
#54

4819860084

BUTTERFLY VALVE,30IN,CS,FLANGED

14 ea Delivery: 90 days
#55

4823023522

VLV,BUTTERFLY,A216,WCB,13%CR,RF,24IN,150

6 ea Delivery: 90 days
#56

4878813134

VLV,GT,A216WCB,A216WCB,FL,18IN,300,IBR

2 ea Delivery: 90 days
#57

4878850394

VLV,GT,A182F11,A182F11,SW,1500,1/2IN,IBR

10 ea Delivery: 90 days
#58

4887881064

VLV,GLB A182F11 13%CR SW 800 1 1/2IN IBR

2 ea Delivery: 90 days
#59

4861260564

VLV,GATE,SS,A182GR316L,3/4IN,CL800,SW

30 ea Delivery: 90 days
#60

4861261064

VLV,GATE,SS,A182GR316L,1.5IN,CL800,SW

40 ea Delivery: 90 days
#61

4879311224

VLV,GT,WDGE,A351 CF3M,SS316L,FLG,150,2IN

15 ea Delivery: 90 days
#62

4866380564

VLV,GT,A182F316L,SS316L+STL,SW,800,3/4IN

6 ea Delivery: 90 days
#63

4889620374

VLV,GLB,A182316L,SS316L+ST,SW,800,3/4IN

6 ea Delivery: 90 days
#64

4879261064

VLV,GT,A182F316L,A182F316L,SW,800,1.5IN

6 ea Delivery: 90 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) card

3

Experience certificates showing relevant CPCL or equivalent project experience

4

Financial statements for the last 2-3 years

5

EMD/Security deposit as per CPCL terms

6

Technical compliance certificates (as applicable to CPCL categories)

7

OEM authorization/c manufacturer's certificate (if bidding on branded items)

8

PBG submission in CPCL PBG format (post-order)

9

Any other documents specified in the tender specification document (to be verified in the attached tender packet)

Corrigendum Updates

5 Updates
#1

Update

27-Apr-2026

Extended Deadline

30-Apr-2026, 5:00 pm

Opening Date

30-Apr-2026, 5:30 pm

#2

Update

17-Apr-2026
#3

Update

17-Apr-2026

Extended Deadline

27-Apr-2026, 2:00 pm

Opening Date

27-Apr-2026, 2:30 pm

#4

Update

13-Apr-2026
#5

Update

13-Apr-2026

Extended Deadline

20-Apr-2026, 2:00 pm

Opening Date

20-Apr-2026, 2:30 pm

Reverse Auction Schedule

Completed

Start

08-Jul-2026, 2:00 pm

End

09-Jul-2026, 2:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for CPCL tender in Tiruvallur Tamil Nadu 2026?

Bidders should obtain the CPCL specification document, confirm 64 BOQ items, prepare a CPCL-compliant PBG post-order, and arrange for Third Party Inspection as required. Prepare GST, PAN, financials, and experience certificates, then submit the technical and commercial bids per CPCL terms.

What documents are required for CPCL procurement in Tamil Nadu?

Submit GST certificate, PAN, up-to-date financial statements, experience certificates for relevant CPCL-like projects, EMD/Security as per CPCL rules, OEM authorizations if applicable, and CPCL-compliant PBG after order placement.

What standards or certifications are needed for CPCL 2026 tender?

adhere to CPCL specification document; ensure ISI/ISO certifications if specified; obtain third party inspection accreditation as required; ensure PBG in CPCL format and full OEM authorizations where necessary.

When is the delivery deadline after CPCL order placement?

Delivery schedule is defined in the CPCL specification document after order placement; bidders must align with 64 item scope and pass Third Party Inspection before acceptance.

What is the role of Third Party Inspection in CPCL tender?

Third Party Inspection validates conformity of supplied items per CPCL specification; inspection is mandatory and must be completed per CPCL tender terms to enable acceptance and payment processing.

How to prepare CPCL PBG after winning the tender?

Submit the CPCL-specified PBG format after order placement; ensure amount matches CPCL’s security requirement and is valid for the project duration plus defect liability period.

What is the scope of CPCL’s 64 BOQ items tender in Tamil Nadu?

The 64 BOQ items indicate a broad procurement scope; item-level quantities and exact categories are defined in the full tender packet, which bidders must review to prepare item-wise bids.

What are the eligibility criteria for CPCL procurement in 2026?

Eligibility includes prior CPCL-like project experience, valid GST/PAN, audited financials, compliance with CPCL terms, and ability to furnish OEM authorizations and a CPCL-format PBG after order placement.