Bid Publish Date
04-Sep-2026, 1:16 pm
Bid End Date
25-Sep-2026, 2:00 pm
Location
Progress
Public procurement opportunity for N/a Split Air Conditioner, Stabilizer Installation, Stand installation, Socket installation, Wiring installation in SOUTH ANDAMAN, ANDAMAN & NICOBAR. Quantity: 153 issued by. Submission Deadline: 25-09-2026 14: 00: 00. View full details and respond.
Quantity
153
Category
Split Air Conditioner
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
25
OEM Avg. Turnover
3
Past Performance
10 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner , Stabilizer Installation , Stand installation , Socket installation , Wiring installation
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
South Andamans
Delivery Pincodes
744102
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Monideepa Chowdhury | 744102,Silva Complex, Horticulture Road, Haddo Port Blair. | South Andamans | Andaman And Nicobar Islands | 744102 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Split Air Conditioner
Supply of 02 Ton inverter split Air Conditioner
Split Air Conditioner
Supply of 02 Ton inverter split Air Conditioner
Stabilizer Installation
5 KVA V Guard Stabilizer
Stabilizer Installation
4 KVA V Guard Stabilizer
Stand installation
Supplying of pre Fabricated stand
Socket installation
Supply and Fixing of 25 A Havels DBOXx MCB
Socket installation
Supply and Fixing of 20 A Havels DBOXx MCB
Wiring installation
Wiring for circuit sub main wiring along with earth wire
Wiring installation
Supplying and Fixing of following Horizontal 415 V TPN MCB
Wiring installation
Supplying and Fixing following rating Four poles 415 V isolator
Wiring installation
Supplying and Fixing 5A to 32 A rating 240 415 V 10 KA C curve
Wiring installation
Wiring for circuit FRLS PVC insulated copper conductor
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Split Air Conditioner | Supply of 02 Ton inverter split Air Conditioner | 2 | sets | ccf_t | 10 | |
| 2 | Split Air Conditioner | Supply of 02 Ton inverter split Air Conditioner | 3 | sets | ccf_t | 10 | |
| 3 | Stabilizer Installation | 5 KVA V Guard Stabilizer | 2 | nos | ccf_t | 10 | |
| 4 | Stabilizer Installation | 4 KVA V Guard Stabilizer | 3 | nos | ccf_t | 10 | |
| 5 | Stand installation | Supplying of pre Fabricated stand | 5 | set | ccf_t | 10 | |
| 6 | Socket installation | Supply and Fixing of 25 A Havels DBOXx MCB | 2 | set | ccf_t | 10 | |
| 7 | Socket installation | Supply and Fixing of 20 A Havels DBOXx MCB | 3 | set | ccf_t | 10 | |
| 8 | Wiring installation | Wiring for circuit sub main wiring along with earth wire | 120 | mtr | ccf_t | 10 | |
| 9 | Wiring installation | Supplying and Fixing of following Horizontal 415 V TPN MCB | 1 | each | ccf_t | 10 | |
| 10 | Wiring installation | Supplying and Fixing following rating Four poles 415 V isolator | 5 | each | ccf_t | 10 | |
| 11 | Wiring installation | Supplying and Fixing 5A to 32 A rating 240 415 V 10 KA C curve | 5 | each | ccf_t | 10 | |
| 12 | Wiring installation | Wiring for circuit FRLS PVC insulated copper conductor | 2 | mtr | ccf_t | 10 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer