Public procurement opportunity for Nuclear Power Corporation Of India Limited 1 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Anti Ejection Device, 2 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Drive Tube Guide Module, 3 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 1, 4 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 2, 5 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 3, 6 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Full bore leakage arresting device in SURAT, GUJARAT. Quantity: 33 issued by. Submission Deadline: 07-11-2025 17: 00: 00. View full details and respond.
Tender Notice for 1 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply in SURAT, GUJARAT
Latest Corrigendum Available
Progress
Quantity
33
Category
1 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Anti Ejection Device
Bid Type
Two Packet Bid
Categories
3
Bill of Quantities (BOQ)
6 Items
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | 1 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Anti Ejection Device | Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Anti Ejection Device as per Drg. No. 700MWe 31710 0647 GA R0 D DRHR AKH SG 01 and Technical specification provided in Annexure 3. | 6 | no | con2.gj | 240 |
| 2 | 2 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Drive Tube Guide Module | Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Drive Tube Guide Module as per Drg. No. 700MWe 31710 0648 DD R0 D DRHR AKH SG 05 and Technical specification provided in Annexure 3. | 6 | no | con2.gj | 240 |
| 3 | 3 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 1 | Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 1 as per Drg. No. 700MWe 31710 0649 GA R0 Sheet No. 1 D DRHR AKH SG 09 and Technical specification provided in Annexure 3. | 6 | no | con2.gj | 240 |
| 4 | 4 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 2 | Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 2 as per Drg. No. 700MWe 31710 0649 GA R0 Sheet No. 3 D DRHR AKH SG 10 and Technical specification provided in Annexure 3. | 6 | no | con2.gj | 240 |
| 5 | 5 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 3 | Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Safety Guide Assembly Attachment 3 as per Drg. No. 700MWe 31710 0649 GA R0 Sheet No. 7 D DRHR AKH 540 SG 12 and Technical specification provided in Annexure 3. | 6 | no | con2.gj | 240 |
| 6 | 6 Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Full bore leakage arresting device | Procurement of Raw material, Manufacturing, Inspection, Heat Treatment, Assembly, Packing Supply of Full bore leakage arresting device as per Drg. No. 700MWe 31710 0650 GA R0 D DRHR AKH FB 01 and Technical specification provided in Annexure 3. | 3 | no | con2.gj | 240 |
AI-Powered Bidder Prediction
Companies most likely to bid
Unlock Bidder Insights
AI predictions on likely bidders
Required Documents
Certificate (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Corrigendum Updates
1 Update Update
Extended Deadline
07 Nov 2025, 05:00 pm
Opening Date
07 Nov 2025, 05:30 pm
Download FREE!
Access all tender documents at no cost
Documents 6
GeM-Bidding-8457708.pdf
Main Document
Other Documents
OTHER
BOQ Document
BOQ
BOQ Document
BOQ
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS
GeM-Bidding-8457708.pdf
Main Document
Other Documents
OTHER
BOQ Document
BOQ
BOQ Document
BOQ
Buyer uploaded ATC document
ATC
GEM General Terms and Conditions Document
GEM_GENERAL_TERMS_AND_CONDITIONS