TenderDekho Logo
Active GEM

Tender Notice for Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2),Submersible Pumpsets (Three Phase) Co

Bid Publish Date

11-Aug-2026, 6:10 pm

Bid End Date

01-Sep-2026, 3:00 pm

EMD

₹35,732

Value

₹11,91,074

Progress

Issue11-Aug-2026, 6:10 pm
AwardPending

Airports Authority Of India has released a public tender for Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2) (Q2). Quantity: 18. Submission Deadline: 01-09-2026 15: 00: 00. Download documents and apply online.

Tender Data

Bid Details

Quantity

18

Category

Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2)

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

7 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

357

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Submersible Pumpsets (Three Phase) Conforming To IS 8034 (V2) (Q2)

Advisory Bank

State Bank of India

Payment Timelines

Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

24 Paraganas North

Delivery Pincodes

700052

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Debashis Mondal700052,AIRPORTS AUTHORITY OF INDIA , NSCBI AIRPORT , KOLKATA24 Paraganas NorthWest Bengal700052190-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9704146.pdf

Main Document

Other Documents

OTHER

CATALOG-Specification-1

CATALOG Specification

CATALOG-Specification-2

CATALOG Specification

CATALOG-Specification-3

CATALOG Specification

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Airports Authority Of India , Nscbi Airport

Grievance Contact

[email protected]

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC)

7

Additional Doc 3 (Requested in ATC)

8

Additional Doc 4 (Requested in ATC)

9

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

10

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Technical Specifications 3 Items

Item #1 Details

View Catalog
Category Specification Requirement
GENRIC BEE Star Rating (Hint: In case star rating is not applicable please select "0") 5 Or higher
GENRIC Number of Pump Stages Multistage
PERFORMANCE PARAMETERS Discharge Capacity (in Litres Per Hour) 9612
PERFORMANCE PARAMETERS Discharge Head 53.0
CONSTRUCTION Motor Type and Duty ISI Marked to IS:9283 latest of wet type for continuous rating synchronous ,Type B,Duty Type-S1
CONSTRUCTION Number of Motor Poles 2 pole, 4 pole
CONSTRUCTION Motor Power Rating 2.2
CONSTRUCTION Maximum Rated Current 2.25, 3.25, 4.5, 6.5, 8.5, 10, 12, 14.5, 19.5, 25, 29, 34, 39, 98, 48, 57, 88, 75, 70
CONSTRUCTION Control Panel with Starter, ISI Marked MCB/Main Switch, Ammeter, Voltmeter, Water Level Indicator and Single Phase Preventer Provided Yes, No
CONSTRUCTION Availability of Non Return Valve (NRV) Yes
CONSTRUCTION Length of Submersible Cable 3.0

Explore More Opportunities

Quick Access