TenderDekho Logo
Active GEM

UPPCL Water Purification System with UV/UV+UF Tender BastI Uttar Pradesh 2026

Bid Publish Date

17-Oct-2026, 1:41 pm

Bid End Date

27-Oct-2026, 2:00 pm

Value

₹20,000

Progress

Issue17-Oct-2026, 1:41 pm
AwardPending

Key Highlights

  • • Detailed option clause enabling +/- 25% quantity change with contract pricing preserved
  • • 3-year OEM warranty requirement and formal warranty certificates at delivery
  • • Mandatory installation, commissioning and training within India with local service network
  • • Delivery and installation at Office of the Superintending Engineer, 220KV Substation, Gidahi, BastI

Tender Overview

Organization: Uttar Pradesh Power Corporation Limited (UPPCL). Procurement: Water purification system with UV (Ultra-Violet Process) or UV+UF (Ultra-Filtration Process) for electrical transmission infrastructure. Location: BastI, Uttar Pradesh 272001. Estimated Value: ₹20,000. Delivery/Installation Site: Office of the Superintending Engineer, Electricity Transmission Circle, 220KV Substation, Gidahi, BastI, 272002. Delivery window: terms allow up to 25% quantity variation during contract; initial delivery timeline linked to original delivery period. Warranty & After-sales: 3 years warranty from final acceptance; OEM warranty certificates required; dedicated service team with local India presence. Key differentiator: option clause enabling extended quantity at contracted rates; GST applied as per bidder’s rate with actual or statutory limits. Unique aspects: installation, commissioning and training may be included; post-sales service centers to be declared.

Technical Specifications & Requirements

  • Product category: Water purification system with UV or UV+UF process; no BOQ items listed; Estimated value: ₹20,000; Delivery/Installation: BastI address; Warranty: 3 years from acceptance; OEM warranty certificates required; service network in India; bidder must provide dedicated service personnel for timely servicing; GST obligations as per bidder.
  • Delivery location: Office of the Superintending Engineer, 220KV Substation, Gidahi, BastI, 272002.
  • Eligibility context: installation, commissioning, testing and training may be in scope; bidder must demonstrate installation/maintenance capability in India.

Terms, Conditions & Eligibility

  • Option Clause: Purchaser may increase/decrease quantity up to 25%; extended delivery time proportionate to quantity change, minimum 30 days.
  • Warranty: 3 years post-acceptance; OEM warranty certificates must be provided; service centers in India with rapid response capability.
  • Delivery/Installation: at the stated BastI address; time-bound service commitments under SLA.
  • GST: bidder to self-declare GST; reimbursement as per actuals or applicable rates, capped to quoted GST percentage.
  • Financial Standing: bidder must not be under liquidation or similar proceedings; an undertaking to this effect must be submitted.
  • Documentation: GST, PAN, experience proof, financials, EMD documents where applicable; compliance certificates for service capability.

Key Specifications

  • Product: Water purification system with UV or UV+UF process

  • Estimated value: ₹20,000

  • Delivery location: Office of the Superintending Engineer, Electricity Transmission Circle, 220KV Substation, Gidahi, BastI, 272002

  • Warranty: 3 years from final acceptance; OEM warranty certificate required

  • Service capability: dedicated technical personnel for timely servicing; service centers in India

  • GST: bidder to declare applicable GST; reimbursement as per actuals or capped rate

Terms & Conditions

  • 25% quantity variation allowed at time of contract placement and during contract duration

  • 3-year OEM warranty; service network and installation/training included

  • Delivery/installation at BastI location with SLA-driven service levels

Important Clauses

Payment Terms

GST handling by bidder; reimbursement as actuals or capped rate; no explicit advance/payment split included in available terms

Delivery Schedule

Delivery period linked to original delivery date; additional time proportional to quantity changes, minimum 30 days

Penalties/Liquidated Damages

No explicit LD details provided in available data; SLA-based maintenance commitment implied

Bidder Eligibility

  • Not under liquidation or similar proceedings; undertaking to this effect required

  • Capability to install and maintain water purification systems in India

  • GST registration and compliance with applicable tax norms

Advertisement

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Warranty Period

3 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Water Purification System with UV (Ultra-Violet Process) or UV (Ultra-Violet Process)+UF (Ultra-Filtration Process) (V2) (Q2)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Basti

Delivery Pincodes

272002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajesh Kumar Bansi272002,ELECTRICITY TRANSMISSION CIRCLE BASTIBastiUttar Pradesh272002115-

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 2

GeM-Bidding-10051816.pdf

Main Document

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Electricity Civil Transmission Circle 132 Kv S/s Martinpurwa Lucknow

Grievance Contact

[email protected]

Categories 17

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates for similar water purification systems

4

Financial statements (audited, where applicable)

5

EMD documents (if applicable per tender, or explicit note of not required)

6

Technical bid documents demonstrating UV/UF system capabilities

7

OEM authorizations or dealership/partnership letters

8

Proof of installation/maintenance capability within India

9

Service center network details near BastI (for post-sales)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for UV water purification system tender in BastI Uttar Pradesh 2026

Bidders must submit GST, PAN, experience certificates, and financial statements; include OEM authorizations if applicable. Provide proof of installation capability in India and service network details. Ensure warranty terms meet the 3-year OEM requirement and adhere to the 25% quantity variation clause.

What documents are required for BastI UV water purifier procurement

Submit GST certificate, PAN, experience certificates for water purification projects, financial statements, OEM authorization, and technical bid detailing UV/UF system specifications. Include installation/maintenance capability proof and service center details near BastI for timely after-sales support.

What are the key technical requirements for UV+UF water treatment tender

System must support UV disinfection with optional UF stage; provide 3-year OEM warranty, installation and commissioning; include service SLA with dedicated technicians in India; delivery at 220KV Substation Gidahi, BastI; provide service centers and post-sales support details.

When is the delivery period and how is quantity variation handled

Delivery terms permit up to 25% increase/decrease in quantity at contract award; extended period calculated as (increased quantity ÷ original quantity) × original delivery days, with a minimum extension of 30 days.

What are the GST requirements for this procurement in BastI

Bidders must self-declare applicable GST; reimbursement will be subject to actuals or the bidder’s quoted GST rate, whichever is lower; ensure GST registration and compliance documentation is included with bid.

What is the warranty and post-sales service expectation for UP PCL tender

Warranty period is 3 years from final acceptance; OEM warranty certificates required at delivery; demonstrate dedicated technical personnel and India-wide service centers for timely servicing and maintenance as per SLA.