Opening dismantling taking down under mentioned spares parts assemblies and supply AND fixing in re
Indian Army
MUMBAI, MAHARASHTRA
Bid Publish Date
23-Oct-2024, 10:34 am
Bid End Date
13-Nov-2024, 11:00 am
Progress
Quantity
20
Category
Front suspension dismantling repairing and replacement of following parts Link assembly 02 Nos Rubber bush kit 01 Nos Silent block bush 06 Nos Front shock absorber 01 Nos
Bid Type
Two Packet Bid
Indian Army has released a public tender for Front suspension dismantling repairing and replacement of following parts Link assembly 02 Nos Rubber bush kit 01 Nos Silent block bush 06 Nos Front shock absorber 01 Nos, Dismantling repairing and resembling of front wheel with replacement of following parts Front wheel inner bearing 02 Nos Front wheel outer bearing 02 Nos Bearing grease 01 Kg Nos Brake pad 02 Nos, Tie rod ends dismantling and reassembling with replacement of following parts Tie rod end left hand and right hand 04 Nos, Dismantling and refitting of front bumper for denting and welding with replacing 4 Nos nuts, Head light glass change 01 Nos, Power steering pump opening dismantling servicing and repair with change of power steering fluid, Right side door glass replacement 01 Nos, Supply and fix in replacement u s silencer muffler assembly complete and testing, Foot mat 04 Nos, Supply and fix kit pad assembly, Replacement of door handle outer side, Drain out engine oil and top-up with fresh engine oil, Engine oil, Supply and fix wiper blade, Checking engine performance by diagnostic kit electric work, Supply hand rest pillow, Supply star box cover 02 Nos, Wheel alignment, Tyre rotation, Dry cleaning upholstery. Quantity: 20. Submission Deadline: 13-11-2024 11: 00: 00. Download documents and apply online.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
MUMBAI, MAHARASHTRA
Indian Army
VISAKHAPATNAM, ANDHRA PRADESH
Indian Army
BATHINDA, PUNJAB
Indian Army
JODHPUR, RAJASTHAN
Indian Army
AMRITSAR, PUNJAB
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Front suspension dismantling repairing and replacement of following parts Link assembly 02 Nos Rubber bush kit 01 Nos Silent block bush 06 Nos Front shock absorber 01 Nos | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 2 | Dismantling repairing and resembling of front wheel with replacement of following parts Front wheel inner bearing 02 Nos Front wheel outer bearing 02 Nos Bearing grease 01 Kg Nos Brake pad 02 Nos | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 3 | Tie rod ends dismantling and reassembling with replacement of following parts Tie rod end left hand and right hand 04 Nos | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 4 | Dismantling and refitting of front bumper for denting and welding with replacing 4 Nos nuts | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 5 | Head light glass change 01 Nos | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 6 | Power steering pump opening dismantling servicing and repair with change of power steering fluid | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 7 | Right side door glass replacement 01 Nos | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 8 | Supply and fix in replacement u s silencer muffler assembly complete and testing | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 9 | Foot mat 04 Nos | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 10 | Supply and fix kit pad assembly | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 11 | Replacement of door handle outer side | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 12 | Drain out engine oil and top-up with fresh engine oil | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 13 | Engine oil | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 14 | Supply and fix wiper blade | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 15 | Checking engine performance by diagnostic kit electric work | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 16 | Supply hand rest pillow | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 17 | Supply star box cover 02 Nos | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 18 | Wheel alignment | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 19 | Tyre rotation | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
| 20 | Dry cleaning upholstery | Details oblique description of work held in Specification with general condition | 1 | job | [email protected] | 30 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
These are the final prices after the reverse auction event. Prices may be lower than initial bids.
| Rank | Seller | Final Price | Item |
|---|---|---|---|
| L1 | RACHNA ENTERPRISES Under PMA Winner | ₹64,200 | Item Categories : Front suspension dismantling repairing and replacement of following parts Link assembly 02 Nos Rubb |
| L2 | OM ENTERPRISES Under PMA | ₹64,500 | Item Categories : Front suspension dismantling repairing and replacement of following parts Link assembly 02 Nos Rubb |
| L3 | M/S Stuti Trading Company Under PMA | ₹69,700 | Item Categories : Front suspension dismantling repairing and replacement of following parts Link assembly 02 Nos Rubb |
🎉 L1 Winner
RACHNA ENTERPRISES Under PMA
Final Price: ₹64,200
The eligibility requirements include being a registered entity, possessing at least 3 years of relevant experience, and demonstrating a minimum average annual turnover of 1 lakh.
Yes, bidders need to submit OEM authorization certificates along with evidence of past performance and financial turnover to meet the technical and financial requirements.
Bidders must ensure they are registered businesses that comply with the regulations set forth by the Department of Military Affairs. Completion of the necessary licensing is a prerequisite.
Documents should be submitted in commonly accepted formats such as PDF and DOCX to facilitate transparent evaluation processes.
Bidders must demonstrate capabilities in vehicle repairs that include knowledge of suspension systems, engine maintenance, and brake repairs. A trained workforce is essential.
All work should comply with the established quality standards for vehicle maintenance, ensuring safety and operational efficacy. Adherence to OEM specifications is critical.
Bidders must comply with all the stated eligibility criteria, technical requirements, and document submission guidelines as outlined in the tender document.
An Earnest Money Deposit (EMD) may be required as part of the bidding process to secure the commitment for participating bidders, ensuring seriousness in their offers.
Yes, successful bidders may need to provide a performance security to guarantee the fulfillment of obligations as per the contract.
Payment terms will be specified in the final contract post-evaluation, typically involving milestone payments linked to project progress and milestones achieved.
Price evaluation will consider the total value of bids, ensuring the best financial proposal in alignment with quality and compliance standards.
Documents should be submitted electronically through the designated tendering platform as stipulated in the tender guidelines.
Bidders will be notified of the results shortly after the completion of the evaluation process, which typically occurs within weeks of the bid opening.
MSEs can avail of certain exemptions regarding the experience and turnover requirements, enabling more opportunities for these businesses.
Yes, start-ups may benefit from tailored provisions aimed at encouraging their participation, promoting innovation within the vehicle servicing sector.
The tender promotes local content and procurement rules, aligning with the national 'Make in India' initiative by encouraging local services and products in the tendering process.
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS