Tender Overview

Organization: Indian Oil Corporation Limited – Marketing Division. Procurement includes supply, erection, testing and commissioning of 01 no 100KVA 3-phase liquid-cooled DG set, supply and installation of AMF panel, laying of 3.5 core X 120 sq mm aluminum armored cable and control cable, foundation works for DG installation, new earth pits with earthing protection, and obtaining CPCB registration and consent to establish/operate. AMC for post‑defect liability period across years 1–5. No explicit location or estimated value in the data provided. The BOQ lists 11 items but specifics are not disclosed. The ATC documents govern qualification criteria and any conflicts with GeM GTC. Unique scope emphasizes environmental compliance (CPCB) and long‑term maintenance through multi‑year AMC. Target bidders should prepare for heavy electrical equipment installation and civil works tied to a government procurement process.

Technical Specifications & Requirements

  • 01 no 100KVA 3-phase liquid-cooled DG set with associated controls
  • AMF panel for automatic synchronization and startup sequencing
  • Laying of 3.5 core X 120 sq mm aluminum armored cable and control cable
  • Foundation works for DG installation and secure anchoring
  • New earth pits and earthing protection integrated with DG system
  • CPCB registration and consent to establish and operate as part regulatory compliance
  • AMC years 1–5 after defect liability period for ongoing service and support
  • No explicit technical performance specs or standards stated in the data; refer ATC for detailed criteria

Terms, Conditions & Eligibility

  • EMD/financial terms: Not specified in the provided data; ATC to finalize
  • Delivery & installation timeline: Not specified; ATC governs milestones
  • Documentation: Refer to ATC document; bidders must submit GST, PAN, experience certificates, financials, EMD documents, technical bid, OEM authorizations as applicable
  • Warranty/AMC: Multi-year AMC (years 1–5) post‑defect liability
  • Regulatory compliance: CPCB registration/consent to establish and operate
  • Qualification criteria: Detailed in uploaded tender ATC; conflict resolution provisions apply with GeM GTC
  • Penalties/LD: Not specified here; ATC details prevail

Key Specifications

  • 01 no 100KVA 3-phase liquid-cooled DG set

  • AMF panel for automatic mains failure and integration with DG

  • 3.5 core X 120 sq mm aluminum armored cabling and control cables

  • Foundation works for DG installation

  • New earth pits and earthing protection

  • CPCB registration and consent to establish and operate

  • AMC for 5 years post defect liability (annual servicing and support)

Terms & Conditions

  • EMD amount not disclosed; ATC to specify

  • Delivery and installation milestones governed by ATC

  • Multi-year AMC: 5 years after defect liability period

Important Clauses

Payment Terms

To be defined in ATC; follow GeM/GTC with possible milestone payments aligned to delivery, installation, and commissioning

Delivery Schedule

Delivery timelines to be specified in ATC; includes civil works, electrical installation, and commissioning milestones

Penalties/Liquidated Damages

LDs, if any, to be detailed in ATC; applicable for delayed delivery or non-conforming works

Bidder Eligibility

  • Experience in supply and commissioning 3-phase DG sets (100KVA) and AMF panels

  • Capability to perform foundation works and earthing installations

  • Compliance with CPCB registration/consent procedures and environmental standards

  • Ability to provide multi-year AMC (years 1–5) post defect liability period

Tender Data

Bid Details

Quantity

85

Category

Supply, Erection, testing and commissioning of 01 no 100KVA 3-phase liquid cooled DG Set

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply, Erection, testing and commissioning of 01 no 100KVA 3-phase liquid cooled DG Set , Supply, installation and commissioning of AMF Panel , Layig 3.5 core X 120 Sq mm Aluminum armored cable and control cable , Foundation works for installation of new 100 KVA DG , Providing new earth pits and earthing protection to DG set , Arranging CPCB registration and consent to establish and operate , AMC for 1st year after defect liability period , AMC for 2nd year after defect liability period , AMC for 3rd year after defect liability period , AMC for 4th year after defect liability period , AMC for 5th year after defect liability period

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

40

Delivery Locations

1

Delivery Cities

Jabalpur

Delivery Pincodes

482002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Upendra Kumar Garg482002,INDIAN OIL BHAWAN, SCHEME NO II BLOCK 9 , 2ND FLOOR, CIVIC CENTRE, MARHATALJabalpurMadhya Pradesh482002140-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASINDIAN OIL CORPORATION LIMITEDMARKETING DIVISION

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9872739.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Bill of Quantities (BOQ) 11 Items Sign in for GEM prices

#1

Supply, Erection, testing and commissioning of 01 no 100KVA 3-phase liquid cooled DG Set

Supply, Erection, testing and commissioning of 01 no 100KVA 3-phase liquid cooled Diesel Generator compliant to latest CPCB IV norms and attached specifications in all aspects. The cost is inclusive of discount on account of Buyback of existing old 50kVA DG set dismantling/uninstallation/shifting/transportation by bidder.

1 ea Delivery: 40 days
#2

Supply, installation and commissioning of AMF Panel

Supply, installation and commissioning of AMF Panel (without PLC) complete in all respect near owners electrical panel

1 ea Delivery: 40 days
#3

Layig 3.5 core X 120 Sq mm Aluminum armored cable and control cable

Layig 3.5 core X 120 Sq mm Aluminum armored cable and control cable from DG set to owner electrical panel properly laid on cable tray properly laid on cable tray (approx. distance 60 m)

60 metre Delivery: 40 days
#4

Foundation works for installation of new 100 KVA DG

Foundation works for installation of new 100 KVA DG (If required after assessment as per site conditions). DG can also be installed over existing foundation.

1 ea Delivery: 40 days
#5

Providing new earth pits and earthing protection to DG set

Providing new earth pits and earthing protection to DG set (02 body & 02 neutral earthing)

1 ea Delivery: 40 days
#6

Arranging CPCB registration and consent to establish and operate

Arranging CPCB registration and consent to establish & operate on behalf of IOCL including all cost/charges associated.

1 ea Delivery: 60 days
#7

AMC for 1st year after defect liability period

AMC for 1st year after defect liability period of 18 month from comissioning. Quarterly visits/preventive checks. Service visits/preventive maintenance every six months) including cost of consumable such as oil, Air & Fuel filters, coolants etc. required for regular maintenance. 02 no. breakdown maintenance visits every year free of cost (Cost of material/spares if any chargeable extra).

4 quarter Delivery: 952 days
#8

AMC for 2nd year after defect liability period

AMC for 2nd year after defect liability period of 18 month from commissioning. Quarterly visits/preventive checks. Service visits/preventive maintenance every six months) including cost of consumable such as oil, Air & Fuel filters, coolants etc. required for regular maintenance. 02 no. breakdown maintenance visits every year free of cost (Cost of material/spares if any chargeable extra).

4 quarter Delivery: 1,317 days
#9

AMC for 3rd year after defect liability period

AMC for 3rd year after defect liability period of 18 month from commissioning. Quarterly visits/preventive checks. Service visits/preventive maintenance every six months) including cost of consumable such as oil, Air & Fuel filters, coolants etc. required for regular maintenance. 02 no. breakdown maintenance visits every year free of cost (Cost of material/spares if any chargeable extra).

4 quarter Delivery: 1,682 days
#10

AMC for 4th year after defect liability period

AMC for 4th year after defect liability period of 18 month from commissioning.Quarterly visits/preventive checks. Service visits/preventive maintenance every six months) including cost of consumable such as oil, Air & Fuel filters, coolants etc. required for regular maintenance. 02 no. breakdown maintenance visits every year free of cost (Cost of material/spares if any chargeable extra).

4 quarter Delivery: 2,048 days
#11

AMC for 5th year after defect liability period

AMC for 5th year after defect liability period of 18 month from commissioning.Quarterly visits/preventive checks. Service visits/preventive maintenance every six months) including cost of consumable such as oil, Air & Fuel filters, coolants etc. required for regular maintenance. 02 no. breakdown maintenance visits every year free of cost (Cost of material/spares if any chargeable extra).

4 quarter Delivery: 2,190 days

Categories 57

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar DG set installations

4

Financial statements / turnover evidence

5

EMD submission document (as specified in ATC)

6

Technical bid submission against ATC

7

OEM authorization /authorized distributor certificates

8

CPCB registration/consent documents (if available at bid stage)

Frequently Asked Questions

How to bid for IOC tender 100KVA DG set in India 2026?

Bidders must review the ATC document, submit GST, PAN, experience certificates, financials, EMD, and OEM authorizations. Ensure CPCB registration/consent is addressed and confirm AMC commitments for five years post defect liability. Compliance with GeM GTC as referenced in the ATC is required.

What documents are required for IOC AMF panel tender in 2026?

Prepare GST certificate, PAN, company financials, experience certificates for DG and AMF works, technical bid, EMD submission, OEM authorization, CPCB-related documents, and any additional ATC-specified forms. Ensure alignment with ATC attachments for qualification.

What is the scope of AMC in IOC DG installation tender 2026?

AMC spans years 1 through 5 after defect liability period, covering preventive maintenance, fault repair, parts replacement, and on-site support. Exact service levels and response times will be defined in the ATC; bidders must commit to full-year service availability.

What is CPCB requirement in IOC DG project bid 2026?

Bidants must obtain CPCB registration and consent to establish and operate for the DG set and associated equipment. Include proof of registration or plan to obtain it, as required by the ATC, to qualify for submission.

What are the delivery milestones for IOC 100KVA DG tender?

Milestones are detailed in the ATC; expect phased delivery, installation, and commissioning. Ensure civil works and foundation tasks are synchronized with electrical activities to meet defined installation dates once released.

Where to find the exact qualification criteria for IOC tender 2026?

Qualification criteria are in the uploaded ATC documents accompanying the GeM tender. Review the ATC for eligibility, turnkey capability, technical compliance, and requisite certifications before bid submission.

What standards or certifications are required for IOC DG supply?

While explicit standards aren’t listed in the data, ATC refers to regulatory and environmental compliance through CPCB. Prepare OEM approvals, IS/IEC certifications if specified in final ATC, and ensure conformity with local electrical standards.

How to prepare for multi-year AMC in IOC procurement 2026?

Detail a service plan with on-site response times, preventive maintenance schedules, spare parts coverage, and trained personnel. Align your proposal to five-year AMC commitments post defect liability as stated in the ATC.