Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification
N/a
KHERI, UTTAR PRADESH
Progress
Quantity
1
Bid Type
Two Packet Bid
A tender has been published for N/a Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification (Q3) in BHAVNAGAR, GUJARAT. Quantity: 1 by. Submission Deadline: 05-03-2026 19: 00: 00. Check eligibility and apply.
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
KHERI, UTTAR PRADESH
N/a
SOLAPUR, MAHARASHTRA
N/a
BHANDARA, MAHARASHTRA
Bhandara District Panchayats
BHANDARA, MAHARASHTRA
Zilla Parishad Sangli
SANGLI, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameter | Type of Solar Pumping System | Shallow Well (Surface) Solar Pumping Systems with D.C. Motor /PMSM/SRM, Shallow Well (Surface) Solar Pumping Systems with A.C. Induction Motor, Solar Deep Well (Submersible) Pumping Systems with D.C. Motor /PMSM/SRM, Solar Deep Well (Submersible) Pumping Systems with A.C. Induction Motor |
| Performance Parameter | Model Number of SPV Water Pumping System | Model-1, Model-2, Model-3, Model-4, Model-5, Model-6, Model-7, Model-8, Model-9, Model-10, Model-11, Model-12, Model-13, Model-14, Model-15, Model-16, Model-17, Model-18, Model-19, Model-20, Model-21, Model-22, Model-23, Model-24, Model-25, Model-26, Model-27, Model-28, Model-29, Model-30, Model-31, Model-32, Model-33, Model-34, Model-35, Model-36, Model-37, Model-38, Model-39 |
| Performance Parameter | Power of Solar Photovoltaic (PV) Array [in Watt-peak(Wp)] | 900, 1800, 2700, 4800, 6750, 9000, 11250, 18000, 20250, 22500, 13500, 15750, 1200, 3000 |
| Performance Parameter | Motor Pump-Set Capacity (in HP) | 1, 2, 3, 5, 7.5, 10, 12.5, 20, 22.5, 25, 15, 17.5 |
| Performance Parameter | Shut Off Dynamic Head (in meters) | 12, 25, 45, 100, 150, 70, 180, 225, 300, 375 |
| Performance Parameter | Water Output (in Liters per day) | 42000 (from a total head of 30 meters), 42000 (from a total head of 70 meters), 43200 (from a total head of 100 meters), 45000 (from a total head of 70 meters), 45600 (from a total head of 30 meters), 50400 (from a total head of 100 meters), 60750 (from a total head of 100 meters), 63000 (from a total head of 30 meters), 63000 (from a total head of 50 meters), 67200 (from a total head of 70 meters), 68400 (from a total head of 30 meters), 69000 (from a total head of 50 meters), 70875 (from a total head of 100 meters), 72000 (from a total head of 70 meters), 75375 (from a total head of 150 meters), 81000 (from a total head of 100 meters), 81000 (from a total head of 250 meters), 84375 (from a total head of 150 meters), 89100 (from a total head of 10 meters), 90000 (from a total head of 200 meters), 90000 (from a total head of 250 meters), 90450 (from a total head of 150 meters), 91125 (from a total head of 250 meters), 94500 (from a total head of 70 meters), 94500 (from a total head of 100 meters), 95625 (from a total head of 120 meters), 99000 (from a total head of 10 meters), 99000 (from a total head of 200 meters), 100800 (from a total head of 50 meters), 105000 (from a total head of 30 meters), 101250 (from a total head of 70 meters), 101250 (from a total head of 100 meters), 101250 (from a total head of 150 meters), 101250 (from a total head of 200 meters), 101250 (from a total head of 250 meters), 105525 (from a total head of 150 meters), 106875 (from a total head of 120 meters), 110400 (from a total head of 50 meters), 111375 (from a total head of 200 meters), 112500 (from a total head of 200 meters), 114000 (from a total head of 30 meters), 114750 (from a total head of 120 meters), 118125 (from a total head of 100 meters), 118125 (from a total head of 150 meters), 120600 (from a total head of 150 meters), 121500 (from a total head of 100 meters), 123750 (from a total head of 200 meters), 126000 (from a total head of 70 meters), 128250 (from a total head of 120 meters), 132300 (from a total head of 20 meters), 133875 (from a total head of 120 meters), 135000 (from a total head of 70 meters), 135000 (from a total head of 150 meters), 135675 (from a total head of 150 meters), 141750 (from a total head of 50 meters), 141750 (from a total head of 100 meters), 148500 (from a total head of 20 meters), 149625 (from a total head of 120 meters), 150750 (from a total head of 150 meters), 151875 (from a total head of 150 meters), 153000 (from a total head of 120 meters), 155250 (from a total head of 50 meters), 157500 (from a total head of 70 meters), 162000 (from a total head of 100 meters), 165375 (from a total head of 100 meters), 168000 (from a total head of 30 meters), 168750 (from a total head of 70 meters), 168750 (from a total head of 150 meters), 171000 (from a total head of 120 meters), 172125 (from a total head of 120 meters), 178200 (from a total head of 10 meters), 182250 (from a total head of 100 meters), 182400 (from a total head of 30 meters), 189000 (from a total head of 50 meters), 189000 (from a total head of 70 meters), 189000 (from a total head of 100 meters), 191250 (from a total head of 120 meters), 192375 (from a total head of 120 meters), 198000 (from a total head of 10 meters), 202500 (from a total head of 70 meters), 202500 (from a total head of 100 meters), 207000 (from a total head of 50 meters), 212625 (from a total head of 100 meters), 213750 (from a total head of 120 meters), 220500 (from a total head of 70 meters), 235200 (from a total head of 20 meters), 236250 (from a total head of 30 meters), 236250 (from a total head of 50 meters), 236250 (from a total head of 70 meters), 236250 (from a total head of 100 meters), 252000 (from a total head of 70 meters), 256500 (from a total head of 30 meters), 264000 (from a total head of 20 meters), 267300 (from a total head of 10 meters), 270000 (from a total head of 70 meters), 283500 (from a total head of 50 meters), 283500 (from a total head of 70 meters), 297000 (from a total head of 10 meters), 303750 (from a total head of 70 meters), 315000 (from a total head of 30 meters), 315000 (from a total head of 70 meters), 330750 (from a total head of 20 meters), 330750 (from a total head of 50 meters), 337500 (from a total head of 70 meters), 342000 (from a total head of 30 meters), 371250 (from a total head of 20 meters), 378000 (from a total head of 50 meters), 393750 (from a total head of 30 meters), 441000 (from a total head of 20 meters), 425250 (from a total head of 50 meters), 465750 (from a total head of 50 meters), 472500 (from a total head of 30 meters), 472500 (from a total head of 50 meters), 475200 (from a total head of 10 meters), 495000 (from a total head of 20 meters), 517500 (from a total head of 50 meters), 528000 (from a total head of 10 meters), 551250 (from a total head of 20 meters), 551250 (from a total head of 30 meters), 630000 (from a total head of 30 meters), 661500 (from a total head of 20 meters ), 668250 (from a total head of 10 meters), 742500 (from a total head of 10 meters), 990000 (from a total head of 10 meters), 1113750 (from a total head of 10 meters), 1237500 (from a total head of 10 meters), 618750 (from a total head of 20 meters), 427500 (from a total head of 30 meters), 258750 (from a total head of 50 meters), 742500 (from a total head of 20 meters), 513000 (from a total head of 30 meters), 310500 (from a total head of 50 meters), 598500 (from a total head of 30 meters), 362250 (from a total head of 50 meters), 684000 (from a total head of 30 meters), 414000 (from a total head of 50 meters) |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS