Bid Publish Date
25-Aug-2026, 9:27 am
Bid End Date
04-Sep-2026, 10:00 am
Progress
Hindustan Shipyard Limited (hsl) announces a tender for Defect survey, MR Routines, STW, HATs and SATs, CMP2 to cylinder ethernet cable assembly - length 80M, Power Supply and Battery control PCB, Transducer Assembly, Ethernet LAN Switch Manageble 5 Port. Quantity: 5. Submission Deadline: 04-09-2026 10: 00: 00. Last date to apply is approaching fast!
Quantity
5
Category
Defect survey, MR Routines, STW, HATs and SATs
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Defect survey, MR Routines, STW, HATs and SATs , CMP2 to cylinder ethernet cable assembly - length 80M , Power Supply and Battery control PCB , Transducer Assembly , Ethernet LAN Switch Manageble 5 Port
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
365
Delivery Locations
1
Delivery Cities
VISHAKHAPATNAM CITY
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | VISHAKHAPATNAM CITY | VISHAKHAPATNAM CITY | - | - | 1 | 365 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Defect survey, MR Routines, STW, HATs and SATs
Defect survey, MR Routines, STW, HATs and SATs
CMP2 to cylinder ethernet cable assembly - length 80M
CMP2 to cylinder ethernet cable assembly (length 80M)
Power Supply and Battery control PCB
Power Supply and Battery control PCB
Transducer Assembly
Transducer Assembly
Ethernet LAN Switch Manageble 5 Port
Ethernet LAN Switch Manageble 5 Port
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Defect survey, MR Routines, STW, HATs and SATs | Defect survey, MR Routines, STW, HATs and SATs | 1 | ls | [email protected] | 365 | |
| 2 | CMP2 to cylinder ethernet cable assembly - length 80M | CMP2 to cylinder ethernet cable assembly (length 80M) | 1 | nos | [email protected] | 365 | |
| 3 | Power Supply and Battery control PCB | Power Supply and Battery control PCB | 1 | nos | [email protected] | 365 | |
| 4 | Transducer Assembly | Transducer Assembly | 1 | nos | [email protected] | 365 | |
| 5 | Ethernet LAN Switch Manageble 5 Port | Ethernet LAN Switch Manageble 5 Port | 1 | nos | [email protected] | 365 |
Discover companies most likely to bid on this tender
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer