Progress
The Urban Development And Housing Department Bihar invites bids for Tractors (V3) in the Madhepura district, Bihar 852101. The procurement includes the supply, installation, testing and commissioning of tractors, under a single contract with option to increase quantity by up to 25% at contracted rates. Delivery timelines, data sheet alignment, and GST considerations are critical, with emphasis on prior govt supply experience and three-year turnover data. This opportunity targets bidders with verified government project experience and demonstrable financial stability, and who can meet the elevated supply scope in a public procurement context.
Product/service: Tractors (V3) for Madhepura, Bihar
Estimated value: Not specified
EMD: Not specified in data
Experience: 1 year of regular manufacture/supply to Central/State Govt or PSU required
Turnover: Minimum average annual turnover over last three years required (as per bid document)
Delivery scope: Supply, Installation, Testing and Commissioning
Standards: Not specified in data; Data Sheet will define compliance
Option clause permits 25% quantity variation during contract
GST responsibility lies with bidder; reimbursement per actuals or quoted rate
Data Sheet must match offered product; mismatch may trigger rejection
Demonstrable govt/PSU experience required with contract copies
Three-year turnover evidence required via audited statements or CA certificate
GST is bidder responsibility; reimbursement as actuals or as per quoted rate; no explicit payment schedule provided in data
Delivery period linked to original delivery order; extension rules apply per option clause; minimum 30 days for additional time
Not specified in data; standard govt tender practice likely applies; ensure Data Sheet alignment to avoid rejection
Regularly manufactured and supplied same or similar tractors to Central/State Govt/PSU for 1 year before bid opening
Demonstrable turnover: minimum average turnover over the last three years
Non-liquidity status with undertaking; not under bankruptcy or receivership
Data Sheet alignment with bid; no unexplained mismatches
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
150 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
12
OEM Avg. Turnover
90
Past Performance
80 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Tractors (V3) (Q2)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Madhepura
Delivery Pincodes
852220
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Prakash Kumar Nishad | 852220,OFFICE OF THE EXECUTIVE OFFICER NAGAR PARISHAD UDAKISHUNGANJ, BLOCK CAMPUS,UDAKISHUNJANJ | Madhepura | Bihar | 852220 | 1 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited Balance Sheets or CA certificate indicating three-year turnover
Data Sheet of offered tractors uploaded with bid
Evidence of prior govt/PSU supply of similar tractors (contracts and performance details)
OEM authorization or reseller agreements (if applicable)
Declaration of non-liquidity status (no liquidation/court receivership)
Bid security/EMD documentation (as applicable by tender)
Key insights about BIHAR tender market
To bid, submit Data Sheet with bid, provide three-year turnover proof via audited statements or CA certification, and demonstrate govt/PSU supply experience for at least one year. Include non-liquidity undertaking, OEM authorizations if applicable, and ensure GST is calculated by you. The contract allows up to 25% quantity extension.
Required documents include GST registration, PAN, three-year turnover proof, Data Sheet uploaded with bid, evidence of prior govt/PSU supply, OEM authorization if needed, non-liquidity undertaking, and EMD documentation as applicable. Ensure data sheet consistency with offered tractor specifications.
Eligibility requires one year of govt/PSU supply of similar tractors, minimum average turnover over three years, non-liquidation status, and submission of contracts as evidence. Bidders must meet Data Sheet alignment rules and provide OEM/authorized reseller documentation if required.
Delivery starts after the original delivery order; if options are exercised, time extension is calculated as (additional quantity/original quantity) × original period with a minimum of 30 days. The purchaser may extend the duration up to the original delivery period.
GST is bidders’ responsibility; the buyer reimburses GST as actuals or at the applicable rate, whichever is lower, up to the quoted GST percentage. Ensure accurate GST calculation in bid pricing to avoid discrepancies.
No explicit technical specs are provided here; bidders must rely on the Data Sheet uploaded with bid. Cross-verify offered tractor parameters against Data Sheet to prevent rejection due to mismatch.
Bidders must demonstrate minimum three-year turnover via audited balance sheets or CA certificate; maintain non-liquidity status; provide EMD documentation per tender requirements; ensure pricing accommodates potential 25% quantity variation.
The scope includes Supply, Installation, Testing and Commissioning of tractors; all costs should be included in bid price; ensure SITC readiness and post-installation support per terms.