TenderDekho Logo
Closed GEM

Contract Bidding Open For Routine Dry Service of Split AC,Wet Chemical Service of Split AC,Refrigerant Gas Charging R22, R32, in HYDERABAD, TELANGANA

Bid Publish Date

19-Aug-2026, 2:30 pm

Bid End Date

31-Aug-2026, 10:00 am

EMD

₹64,000

Progress

Issue19-Aug-2026, 2:30 pm
AwardPending

Hindustan Petroleum Corporation Ltd invites bids for Routine Dry Service of Split AC, Wet Chemical Service of Split AC, Refrigerant Gas Charging R22, R32, R410A, Leak Detection and Rectification, Supply and Installation of Compressor 1. 5 Ton, Supply and Installation of Indoor PCB, Supply and Installation of Outdoor PCB, Supply and Installation of Capacitor, Supply and Installation of Relay, Contactor, Supply and Installation of Outdoor Fan Motor, Supply and Installation of Indoor Blower Motor, Supply and Installation of Blower Fan, Supply and Installation of Cooling Sensor, Supply and Installation of Thermostat, Supply and Installation of Display Board, Supply and Installation of Evaporator Coil, Supply and Installation of Outdoor Condenser Coil, Supply and Installation of Copper Pipe 3 by 8 IN, Supply and Installation of Copper Pipe 5 BY 8 IN, Supply and Installation of Pipe Insulation, Supply and Installation of Drain Pipe, Supply of Compatible Remote Controller, Breakdown Maintenance Visit Inspection, Fault Diagnosis and Testing, Replacement of AHU Pre Filter, Replacement of AHU Fine Filter, Repair Replacement of 5. 5 kW AHU Fan Motor, Replacement of Bearings or Belts or Couplings, AMC Visit of HVAC System Half-Yearly in HYDERABAD, TELANGANA. Quantity: 1816. Submission Deadline: 31-08-2026 10: 00: 00. Submit your proposal before the deadline.

Authority & Contact

Department

NA

Office Name

Petroleum House

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1816

Category

Routine Dry Service of Split AC

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

9

OEM Avg. Turnover

12

Past Performance

40 %

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Routine Dry Service of Split AC , Wet Chemical Service of Split AC , Refrigerant Gas Charging R22, R32, R410A , Leak Detection and Rectification , Supply and Installation of Compressor 1.5 Ton , Supply and Installation of Indoor PCB , Supply and Installation of Outdoor PCB , Supply and Installation of Capacitor , Supply and Installation of Relay, Contactor , Supply and Installation of Outdoor Fan Motor , Supply and Installation of Indoor Blower Motor , Supply and Installation of Blower Fan , Supply and Installation of Cooling Sensor , Supply and Installation of Thermostat , Supply and Installation of Display Board , Supply and Installation of Evaporator Coil , Supply and Installation of Outdoor Condenser Coil , Supply and Installation of Copper Pipe 3 by 8 IN , Supply and Installation of Copper Pipe 5 BY 8 IN , Supply and Installation of Pipe Insulation , Supply and Installation of Drain Pipe , Supply of Compatible Remote Controller , Breakdown Maintenance Visit Inspection, Fault Diagnosis and Testing , Replacement of AHU Pre Filter , Replacement of AHU Fine Filter , Repair Replacement of 5.5 kW AHU Fan Motor , Replacement of Bearings or Belts or Couplings , AMC Visit of HVAC System Half-Yearly

Advisory Bank

ICICI

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

730

Delivery Locations

1

Delivery Cities

Medchal Malkajgiri

Delivery Pincodes

500051

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Ponnam Reddy Sasidhar Reddy500051,HPCL LPG Plant, Post Bag No.2, IDA, Phase-III, Cherlapally, Hyderabad-500051Medchal MalkajgiriTelangana500051352730-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GAS

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9776539.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 28 Items Sign in for GEM prices

#1

Routine Dry Service of Split AC

Routine Dry Service of Split AC

352 ls Delivery: 730 days
#2

Wet Chemical Service of Split AC

Wet Chemical Service of Split AC

176 ls Delivery: 730 days
#3

Refrigerant Gas Charging R22, R32, R410A

Refrigerant Gas Charging R22, R32, R410A

80 kg Delivery: 730 days
#4

Leak Detection and Rectification

Leak Detection and Rectification

60 each Delivery: 730 days
#5

Supply and Installation of Compressor 1.5 Ton

Supply and Installation of Compressor 1.5 Ton

10 each Delivery: 730 days
#6

Supply and Installation of Indoor PCB

Supply and Installation of Indoor PCB

15 each Delivery: 730 days
#7

Supply and Installation of Outdoor PCB

Supply and Installation of Outdoor PCB

8 each Delivery: 730 days
#8

Supply and Installation of Capacitor

Supply and Installation of Capacitor

45 each Delivery: 730 days
#9

Supply and Installation of Relay, Contactor

Supply and Installation of Relay, Contactor

20 each Delivery: 730 days
#10

Supply and Installation of Outdoor Fan Motor

Supply and Installation of Outdoor Fan Motor

12 each Delivery: 730 days
#11

Supply and Installation of Indoor Blower Motor

Supply and Installation of Indoor Blower Motor

10 each Delivery: 730 days
#12

Supply and Installation of Blower Fan

Supply and Installation of Blower Fan

15 each Delivery: 730 days
#13

Supply and Installation of Cooling Sensor

Supply and Installation of Cooling Sensor

20 each Delivery: 730 days
#14

Supply and Installation of Thermostat

Supply and Installation of Thermostat

12 each Delivery: 730 days
#15

Supply and Installation of Display Board

Supply and Installation of Display Board

10 each Delivery: 730 days
#16

Supply and Installation of Evaporator Coil

Supply and Installation of Evaporator Coil

8 ls Delivery: 730 days
#17

Supply and Installation of Outdoor Condenser Coil

Supply and Installation of Outdoor Condenser Coil

8 each Delivery: 730 days
#18

Supply and Installation of Copper Pipe 3 by 8 IN

Supply and Installation of Copper Pipe 3 by 8 IN

150 metre Delivery: 730 days
#19

Supply and Installation of Copper Pipe 5 BY 8 IN

Supply and Installation of Copper Pipe 5 BY 8 IN

150 metre Delivery: 730 days
#20

Supply and Installation of Pipe Insulation

Supply and Installation of Pipe Insulation

300 sqft Delivery: 730 days
#21

Supply and Installation of Drain Pipe

Supply and Installation of Drain Pipe

300 metre Delivery: 730 days
#22

Supply of Compatible Remote Controller

Supply of Compatible Remote Controller

10 each Delivery: 730 days
#23

Breakdown Maintenance Visit Inspection, Fault Diagnosis and Testing

Breakdown Maintenance Visit Inspection, Fault Diagnosis and Testing

30 each Delivery: 730 days
#24

Replacement of AHU Pre Filter

Replacement of AHU Pre Filter

4 each Delivery: 730 days
#25

Replacement of AHU Fine Filter

Replacement of AHU Fine Filter

4 each Delivery: 730 days
#26

Repair Replacement of 5.5 kW AHU Fan Motor

Repair Replacement of 5.5 kW AHU Fan Motor

1 each Delivery: 730 days
#27

Replacement of Bearings or Belts or Couplings

Replacement of Bearings or Belts or Couplings

2 job Delivery: 730 days
#28

AMC Visit of HVAC System Half-Yearly

AMC Visit of HVAC System Half-Yearly

4 each Delivery: 730 days

Categories 93

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Additional Doc 4 (Requested in ATC)

11

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

12

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer