TenderDekho Logo
Closed GEM

Odisha Forest & Environment Procurement Electric Bicycle (V2) Bhubaneswar 2026 - OEM Requirements for Govt Bid

Bid Publish Date

04-Aug-2026, 9:51 am

Bid End Date

14-Aug-2026, 10:00 am

Progress

Issue04-Aug-2026, 9:51 am
AwardPending

Key Highlights

  • Bidder must be prepared for quantity adjustments up to 25% under the option clause
  • Delivery period mechanics include calculation-based extensions with a 30-day minimum
  • ATC document (buyer-uploaded) contains specific conditions not visible in basic data
  • Zero BOQ items indicate potential long-form quotation or framework agreement

Tender Overview

The opportunity is issued by the Chief Wild Life Warden, Odisha (PCCF, WL), Bhubaneswar, under the Forest and Environment Department Odisha, for the procurement of an Electric Bicycle (V2) categorized as Q2. While the BOQ shows zero items and no explicit quantity, the buyer reserves a flexible quantity clause. The procurement is positioned as a government electrical mobility solution with a focus on compliant supply and timely delivery within contract terms. A key differentiator is the explicit option to adjust quantities by up to 25% during both initial and currency periods, at contracted rates. The absence of a listed value suggests an open call pending bidder quotes and alignment with market pricing. The tender requires bidders to align with the purchaser’s delivery and option-clause framework. This tender emphasizes controlled supply and adaptable ordering to support wildlife and forest management operations in Odisha.

Technical Specifications & Requirements

  • Product: Electric Bicycle (V2), Q2 category
  • No formal technical specifications published in BOQ or product sheets
  • Delivery/implementation context: procurement under government department for field mobility
  • Key constraint: bidder must anticipate flexible quantity adjustments up to 25% of bid/contract quantity
  • Delivery timing framework: extension calculations apply from the last date of original or extended delivery periods, with a minimum of 30 days for added time; extended duration formula: (Increased quantity ÷ Original quantity) × Original delivery period
  • Standards or certifications: not specified in data provided; bidders should verify compliance during bid submission
  • Compliance focus: timely delivery, price parity under option clauses, and contract rate stability
  • Documentation emphasis: prepare price quotes that accommodate potential quantity shifts and delivery windows

Terms, Conditions & Eligibility

  • EMD: not specified in the given data; bidders should verify amount and payment method during submission
  • Option Clause: quantity can be increased up to 25% of bid quantity at contract rate; extended delivery time follows calculated formula with minimum 30 days; additional time scales with increased quantity
  • Delivery terms: delivery period linked to original delivery order date; compliance with option clause is mandatory
  • ATC: Additional Terms and Conditions are uploaded by the buyer; bidders should view the ATC document for exact requirements
  • Documentation: ensure readiness to submit standard bidder documents, including GST, PAN, and relevant experience certificates as per ATC
  • BOQ: No items listed; bidders should seek clarification on itemized scope if required

Key Specifications

  • Product/service names: Electric Bicycle (V2) for Q2 category

  • Quantities/values: not specified in BOQ; prepare price with scalable quantities

  • EMD/estimated value: not specified in the data; obtain from ATC

  • Experience: prior supply of electric mobility devices preferred

  • Quality/standards: ensure basic compliance with local electrical mobility norms; verify with ATC

Terms & Conditions

  • 25% quantity variation permitted at contracted rates

  • Delivery time extensions governed by a defined formula with a 30-day minimum

  • ATC document contains critical terms; bidders must review and comply

Important Clauses

Payment Terms

Not specified in data; verify ATC for milestones, advance payments, and settlement timelines

Delivery Schedule

Delivery period can extend based on the option clause; minimum extension time is 30 days

Penalties/Liquidated Damages

Not specified in data; confirm LD provisions in ATC and contract terms

Bidder Eligibility

  • Legal entity registered in India with GST

  • Experience in supplying electric mobility devices or similar equipment

  • Financial capacity to support staged delivery and price adjustments

Authority & Contact

Office Name

Dfo Chillika Wildlife Division Balugaon

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

5

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

No

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

Electric Bicycle (V2) (Q2)

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Khordha

Delivery Pincodes

752030

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Satyananda Sethy752030,At/PO: Gopinathpur, Ps-Balugaon, Khurdha, Odisha.KhordhaOdisha752030515-

Authority Records

ENVIRONMENT AND FOREST DEPARTMENTCHIEF WILD LIFE WARDEN,ORISSA(PCCF,WL), BHUBANESWAR

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9703893.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar electric mobility equipment supply

4

Financial statements or turnover proof for past 3 years

5

EMD/Security deposit as per ATC guidelines

6

Technical bid documents and any OEM authorizations referenced in ATC

7

Any bidder qualification certificates requested in Buyer uploaded ATC

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid for Electric Bicycle V2 tender in Odisha?

Bidders should review the ATC uploaded by the buyer, prepare price proposals accommodating a possible 25% quantity variation, verify delivery timelines with the original schedule, attach GST, PAN, and experience certificates, and submit OEM authorizations if required. Ensure compliance with tender terms and provide a compliant technical bid per ATC.

What documents are required for Odisha e-bike procurement in Bhubaneswar?

Required documents typically include GST registration, PAN, recent financial statements, experience certificates for similar supply, EMD proof, OEM authorization, and technical bid documents. The exact items are defined in the Buyer uploaded ATC; ensure submission with the bid package.

What are the delivery terms for the Electric Bicycle contract in Odisha?

Delivery terms depend on the original delivery order date; an option clause allows up to 25% quantity variation at contracted rates. Extended delivery time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What standards or certifications are required for Odisha EV tender?

The data does not list specific standards; bidders should verify ISI/ISO certifications or OEM approvals in the ATC. Prepare to show compliance or alignment with local mobility device norms and attach any relevant certification or authorization documents in the bid.

When is the bid submission deadline for Odisha e-bike tender 2026?

Exact submission deadlines are not provided in the base data; bidders must consult the ATC document uploaded by the buyer for the precise date, time, and submission portal instructions to ensure timely bid submission.

What is the EMD amount for the Odisha e-bike procurement?

The tender data does not specify an EMD amount. Verify the EMD value and method (DD or online) in the ATC and ensure the payment fulfills the tender’s security deposit requirements before submission.

How to verify eligibility criteria for Odisha Forest & Environment electric mobility tender?

Check the Buyer uploaded ATC for explicit eligibility criteria, including prior supply experience, turnover thresholds, and documentation. Prepare to demonstrate financial stability, relevant field experience, and the ability to meet quantity variation and delivery requirements.