Supply and replacement of Synthetic Engine oil,Supply and replacement of Oil Filter,Supply and repl
Indian Army
MUMBAI, MAHARASHTRA
Bid Publish Date
27-Sep-2025, 5:24 pm
Bid End Date
13-Oct-2025, 3:00 pm
EMD
₹11,635
Value
₹5,81,740
Location
Progress
Quantity
142
Category
Replacement of components a
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) announces a tender for Diesel Tank, Repair of Radiator, Alternator Repair, Repair of FIP, Radiator Repair, GS 15 KVA, GS 20 KVA, GS 30 KVA, Replacement of components a, Replacement of components b, Replacement of components c, Replacement of components d, Replacement of components e, Replacement of components f, Replacement of components g, Replacement of components h, Replacement of components i, Replacement of components j, Replacement of components k, Replacement of components l, Replacement of components m, Replacement of components n, Replacement of components o, Replacement of components p, Replacement of components q, Replacement of components r, Replacement of components s, Replacement of components t, Replacement of components u, Replacement of components v, Replacement of components w, Replacement of components x, FIP Calibration, Repair of Self starter, Change over Switch, Alternator decoupling, Transport of Alternator, Rewinding Alternator 15 KVA, Rewinding Alternator 20 KVA, Rewinding 15 KVA, Rewinding 30 KVA, RR Assembly, DE and NDE Bearings in KRISHNA, ANDHRA PRADESH. Quantity: 142. Submission Deadline: 13-10-2025 15: 00: 00. Last date to apply is approaching fast!
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
MUMBAI, MAHARASHTRA
Indian Army
AMRITSAR, PUNJAB
Indian Army
JABALPUR, MADHYA PRADESH
Indian Army
SOUTH WEST DELHI, DELHI
Indian Army
DHEMAJI, ASSAM
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Diesel Tank | Supplying and fixing of 80 Ltrs capacity Diesel tank suitable for 21.5 KVA Mahindra make & Model 4335 GM i/c removing of faulty / damaged diesel tank etc as reqd.(Including Analog gauge, measurment scale and elctronic fuel level gauge with inlet and out let pipe fittings) | 1 | job | [email protected] | 180 |
| 2 | Repair of Radiator | Removing of faulty radiator from DG set . Repairing of Radiator by removing top and bottom tanks,cleaning the radiator core with chemical , and water servicing refixing the top and bottom tanks testing and painting etc as required | 4 | jobs | [email protected] | 180 |
| 3 | Alternator Repair | Cleaning of the Alternator Main stator winding & rotor winding, excitor stator and rotor windings from depoisted dust etc with petrol etc., checking insulation values with insulation meggar etc as required. | 7 | jobs | [email protected] | 180 |
| 4 | Repair of FIP | Repaiing of jamed fuel injection pump at site by the very skilled man poer, cleaning the pump checking the functioning of the governor, testing of the dg etc as required | 12 | jobs | [email protected] | 180 |
| 5 | Radiator Repair | Supplying & Replacing of Radiator core inplace of faulty damaged Radiator core, providing rubber hoses wih clips,necessray brazing works,filling coolant mixed with water etc as required. | 1 | job | [email protected] | 180 |
| 6 | GS 15 KVA | a) 10/15/12.5 KVA | 2 | jobs | [email protected] | 180 |
| 7 | GS 20 KVA | b) 20/21.5 KVA | 2 | jobs | [email protected] | 180 |
| 8 | GS 30 KVA | c) 25/30/35/40 KVA | 2 | jobs | [email protected] | 180 |
| 9 | Replacement of components a | a) Nomal duty fuel flexible pipe of length approx.30/36 Inches | 20 | nos | [email protected] | 180 |
| 10 | Replacement of components b | b) Exhaust Flexible bellow (up to 30 KVA) | 1 | nos | [email protected] | 180 |
| 11 | Replacement of components c | c) Exhaust Flexible bellow (Above 30 KVA) | 1 | nos | [email protected] | 180 |
| 12 | Replacement of components d | d) V-Belts Heavy duty | 10 | nos | [email protected] | 180 |
| 13 | Replacement of components e | e) Hose for Radiator | 2 | nos | [email protected] | 180 |
| 14 | Replacement of components f | f) Carbon Brushes 10/15 KVA | 2 | nos | [email protected] | 180 |
| 15 | Replacement of components g | g) Carbon Brushes 20/30 KVA | 2 | nos | [email protected] | 180 |
| 16 | Replacement of components h | h) Carbon Brushes 20/30 KVA | 2 | nos | [email protected] | 180 |
| 17 | Replacement of components i | i) Moulded Case Bridge Rectifier Assly | 2 | nos | [email protected] | 180 |
| 18 | Replacement of components j | j) Coolant | 10 | ltrs | [email protected] | 180 |
| 19 | Replacement of components k | k) Door Hinges | 20 | nos | [email protected] | 180 |
| 20 | Replacement of components l | l) Air filter elements (Both Inner and Outer/Only Outer including Sealing ring) | 2 | nos | [email protected] | 180 |
| 21 | Replacement of components m | m) Turbo Oil drain Hose | 1 | nos | [email protected] | 180 |
| 22 | Replacement of components n | n) Water Pump assly | 1 | nos | [email protected] | 180 |
| 23 | Replacement of components o | o) Set of Hoses (Water Line) | 1 | set | [email protected] | 180 |
| 24 | Replacement of components p | p) Oil filling cap assemgly | 2 | nos | [email protected] | 180 |
| 25 | Replacement of components q | q) Diapharm coupling/ Disc Coupling/Tyre Type Coupling | 1 | nos | [email protected] | 180 |
| 26 | Replacement of components r | r) Replacing of Automatic Voltage Regulator (AVR) Suitable up to 63 KVA Alternator and necessary wiring connections i/c testing on load etc., as required. | 3 | nos | [email protected] | 180 |
| 27 | Replacement of components s | s) Replacing with supplying and fixing of the Self starting motor 12 Volts 2.2 KW suitable for Kirloskar Mahindra Escort Eicher Engines as per their suitable model Make- Autolek Mico TVS LUcas | 1 | nos | [email protected] | 180 |
| 28 | Replacement of components t | t) Battery Copper cable for connecting Battery and self starting Motor one end Lug soldering other end Terminal soldering 1mtr long | 2 | nos | [email protected] | 180 |
| 29 | Replacement of components u | u) Control wiring with necessary switch gears/ gnition switch assly/ Toggleswitch/Push botton Repairing of control panel to work in Manual mode operation etc as required. | 1 | jobs | [email protected] | 180 |
| 30 | Replacement of components v | v) Providing 63/40 AMPS Rotory Type Change Over switch | 1 | jobs | [email protected] | 180 |
| 31 | Replacement of components w | w) Supplying and fixing of 12 volts 10 Amps SMPS Based Battery chargers | 2 | nos | [email protected] | 180 |
| 32 | Replacement of components x | x) Laying of THAR sheet on CANOPY Top to arrest Rain Water entry | 2 | jobs | [email protected] | 180 |
| 33 | FIP Calibration | Removing of faulty fuel Injection Pump from Engine, by removing all All Fuel connections , all bolts and nuts. Shifting of fuel iniection Pum the nearest authoised Mico/Bosch Workshop for calibration.Calibration of Fuel injecton pump by replacemernt of necessorySuch as Delivery valves, elements, rollers springs,bearings packing kit, o - ring kit etc as required. Calitbration fuel iniection Pump on test bench by very skilled manpower takingthe readings - Discharge quantity and pressure - on testing machine etc as required and vice-versa. | 1 | jobs | [email protected] | 180 |
| 34 | Repair of Self starter | Repairing of self starter of EA set upto 63 KVA i/ c transportation, reinstallation , testing and commissioning as required | 2 | jobs | [email protected] | 180 |
| 35 | Change over Switch | Providing and fixing Terminal Plate 63 amps 4 pole rotory switch | 1 | nos | [email protected] | 180 |
| 36 | Alternator decoupling | De-coupling of alternator from ebngine by removing vcoupling bolts leg bolts out going cables, both earthings etc and bring the alternator from ea room /Canopy to out side and loading the alternator in to the vehicle after rewinding the alternator , refixing the same in the above manner etc complete as required. | 2 | jobs | [email protected] | 180 |
| 37 | Transport of Alternator | Transportation , unloading of the alternator at the nearest workshop after repair return back to the site, loading at workshop and unloading at the site etc as required. | 2 | jobs | [email protected] | 180 |
| 38 | Rewinding Alternator 15 KVA | a) 10/15KVA | 2 | jobs | [email protected] | 180 |
| 39 | Rewinding Alternator 20 KVA | b) 20/21.5 KVA | 1 | jobs | [email protected] | 180 |
| 40 | Rewinding 15 KVA | i)12.5/15KVA | 1 | jobs | [email protected] | 180 |
| 41 | Rewinding 30 KVA | ii) 25/30/40/50 KVA | 1 | jobs | [email protected] | 180 |
| 42 | RR Assembly | Supplying and fixing of RR assembly to the existing rotor including testng making good etc as required. | 2 | jobs | [email protected] | 180 |
| 43 | DE and NDE Bearings | Supplying and fixing of DE and NDE Bearings | 4 | nos | [email protected] | 180 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | CHAMBAL ENGINEERS & INFRASTRUCTURE Under PMA | - | 13-10-2025 10:30:41 | Disqualified |
| 2 | M.B. ENTERPRISES Under PMA | - | 13-10-2025 09:31:00 | Qualified |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | M.B. ENTERPRISES(MII) Under PMA | ₹5,99,912 | Item Categories : Diesel Tank,Repair of Radiator,Alternator Repair,Repair of FIP,Radiator Repair,GS 15 KVA,GS 20 KVA, |