TenderDekho Logo
Active GEM

Bokaro Steel Plant ELEC SCISSOR LIFT 6M BAT SELFPROP Tender Bokaro Jharkhand 2026

Bid Publish Date

31-Aug-2026, 6:15 pm

Bid End Date

14-Sep-2026, 7:00 pm

Progress

Issue31-Aug-2026, 6:15 pm
AwardPending

Tender Overview

Organization: Bokaro Steel Plant, part of the Steel Authority of India Limited, invites bids for the supply of a single ELEC SCISSOR LIFT 6M BAT SELFPROP (Material code 60311401000087I) in BOKARO, JHARKHAND. The scope is strictly supply of Goods with post-delivery verification at BSL stores and a mandatory on-site technical visit for verification after PO. Emphasizes data sheet alignment, OEM authorization, and GST-compliant invoicing. No BOQ value disclosed. Tender is conducted on GeM platform with supplier obligations including pre/post-inspection checks and invoice formalities.

Terms & Conditions

  • GST compliance with actuals reimbursement and invoicing in consignee name

  • Mandatory data sheet upload and OEM authorization for bid validity

  • Post-delivery/receiving inspection at BSL Stores with one-time site verification after PO

Important Clauses

Payment Terms

GST invoicing to be raised in consignee name; GST payment proof required via GST portal screenshot; reimbursement as per actuals or applicable rates, whichever is lower

Delivery Schedule

Supply-only scope; delivery timeline not disclosed; post-receipt inspection at consignee site; vendor verification visit after PO

Penalties/Liquidated Damages

Not specified in provided data

Bidder Eligibility

  • OEM authorization or authorized distributor certificate required

  • GST registration and GSTIN enabled invoicing

  • Ability to undergo post-delivery verification and on-site inspection at BSL Stores

Tender Data

Bid Details

Quantity

2

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

ELEC SCISSOR LIFT 6M BAT SELFPROP

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

120

Delivery Locations

1

Delivery Cities

Bokaro

Delivery Pincodes

827001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajkaran Singh827001,DGM(Stores), Stores Department, Steel Gate, Gate No.-9, Bokaro Steel Plant, Bokaro Steel City-827001, JharkhandBokaroJharkhand8270012120-

Authority Records

MINISTRY OF STEELSTEEL AUTHORITY OF INDIA LIMITEDBOKARO STEEL PLANT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9740699.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Bokaro Steel Plant

Office Name

Bslp61

Grievance Contact

[email protected]

Categories 6

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

5

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about JHARKHAND tender market

How to bid for ELEC SCISSOR LIFT 6M SELFPROP tender in Bokaro?

Bidders must submit a data sheet aligning with the offered lift, OEM authorization, GSTIN-based invoicing, and applicable GST notes. Post-PO on-site verification is required at BSL CCS shop. Ensure supplier provides one-time site verification details and meets GeM ATC requirements to qualify.

What documents are required for Bokaro lift tender submission 2026?

Submit GST certificate, PAN, company financials, prior experience certificates, data sheet for the ELEC SCISSOR LIFT 6M BAT SELFPROP, OEM authorization, and post-delivery inspection readiness. Include GST portal payment proof and manufacturer authorization with contact details.

What are the delivery terms for the Bokaro 6M lift tender?

The procurement is supply-only; no installation terms listed. After PO, a one-time on-site verification will be conducted at BSL CCS shop. Exact delivery lead time is not disclosed in the data but must align with GeM ATC conditions.

What standards or certifications are required for Bokaro lift bid?

OEM authorization is required; data sheet must match offered parameters. While no ISI/ISO standards are listed in the tender data, ensure manufacturer authentication and compliance with GST invoicing as per buyer terms.

What is the payment process for Bokaro GeM lift procurement?

Invoices must be GST-compliant and issued in the consignee name. Payment proof must be uploaded on the GST portal; reimbursement will be as per actual GST or applicable rates, not to exceed quoted GST percentage.

How to prepare for the post-receipt inspection at Bokaro stores?

Prepare to provide device data sheet, OEM authorization, serial numbers, and delivery documentation. A nominated inspection agency may conduct pre-dispatch or post-receipt checks per ATC; ensure access to BSL Stores for verification.

What happens if data sheet does not match the offered lift?

Mismatch between data sheet and offered equipment can lead to bid rejection. Ensure exact model, material code 60311401000087I, and all parameters align with the supplier’s technical documentation before submission.

Is subcontracting allowed for Bokaro lift procurement?

Sub-contracting requires prior written consent from the buyer. All supply responsibilities remain jointly and severally liable with the main seller, ensuring performance and compliance during the contract period.