Uttar Pradesh Cooperative Sugar Factories Federation Limited invites bids for erection and fabrication works across 66 BOQ items. The estimated contract value is ₹1,657,196 with an EMD ₹240. Location details are not specified in the data. The tender includes a broad scope of fabrication work under multiple A-series erection and fabrication categories, indicating a large but undefined itemized workload. A notable differentiator is the buyer’s right to adjust quantity by up to ±25% during and after ordering, with delivery timelines recalculated accordingly. An uploaded ATC document accompanies the bid.
Total BOQ items: 66
Estimated value: ₹1,657,196.00
EMD amount: ₹240.00
Option clause: ±25% quantity variation
Delivery extension formula: (additional quantity ÷ original quantity) × original delivery period, min 30 days
No itemized quantities published in BOQ (N/A)
EMD required: ₹240 and bid security
Quantity variation allowed up to 25%
Delivery periods adjusted per option clause
Not specified in data; bidders should review ATC document for payment schedule and milestones
Delivery time recalculation based on additional quantity using formula; minimum 30 days
Not specified in data; verify in ATC for LD provisions and performance bonds
Experience in erection and fabrication work across multiple categories
Demonstrated financial stability through turnover documentation
Ability to comply with quantity variation and delivery extension terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Erection and Fabrication Work A 1 , Erection and Fabrication Work A 2 , Erection and Fabrication Work A 3 , Erection and Fabrication Work A 4 , Erection and Fabrication Work A 5 , Erection and Fabrication Work A 6 , Erection and Fabrication Work A 7 , Erection and Fabrication Work A 8 , Erection and Fabrication Work A 9 , Erection and Fabrication Work A 10 , Erection and Fabrication Work A 11 , Erection and Fabrication Work A 12 , Erection and Fabrication Work A 13 , Erection and Fabrication Work A 14 , Erection and Fabrication Work A 15 , Erection and Fabrication Work A 16 , Erection and Fabrication Work A 17 , Erection and Fabrication Work A 18 , Erection and Fabrication Work A 19 , Erection and Fabrication Work A 20 , Erection and Fabrication Work A 21 , Erection and Fabrication Work A 22 , Erection and Fabrication Work A 23 , Erection and Fabrication Work A 24 , Erection and Fabrication Work A 25 , Erection and Fabrication Work A 26 , Erection and Fabrication Work A 27 , Erection and Fabrication Work A 28 , Erection and Fabrication Work A 29 , Erection and Fabrication Work A 30 , Erection and Fabrication Work A 31 , Erection and Fabrication Work A 32 , Erection and Fabrication Work A 33 , Erection and Fabrication Work A 34 , Erection and Fabrication Work A 35 , Erection and Fabrication Work A 36 , Erection and Fabrication Work A 37 , Erection and Fabrication Work A 38 , Erection and Fabrication Work A 39 , Erection and Fabrication Work A 40 , Erection and Fabrication Work A 41 , Erection and Fabrication Work A 42 , Erection and Fabrication Work A 43 , Erection and Fabrication Work A 44 , Erection and Fabrication Work A 45 , Erection and Fabrication Work A 46 , Erection and Fabrication Work A 47 , Erection and Fabrication Work A 48 , Erection and Fabrication Work A 49 , Erection and Fabrication Work A 50 , Erection and Fabrication Work A 51 , Erection and Fabrication Work A 52 , Erection and Fabrication Work A 53 , Erection and Fabrication Work A 54 , Erection and Fabrication Work A 55 , Erection and Fabrication Work A 56 , Erection and Fabrication Work A 57 , Erection and Fabrication Work A 58 , Erection and Fabrication Work A 59 , Erection and Fabrication Work A 60 , Erection and Fabrication Work A 61 , Erection and Fabrication Work A 62 , Erection and Fabrication Work A 63 , Erection and Fabrication Work A 64 , Erection and Fabrication Work A 65 , Erection and Fabrication Work A 66
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Erection and Fabrication Work A 1
Mill mein lage scraper hetu discharge chute ke jo bhag kamzor evam kat gaye hain. unhe kaatkar hatana tatha nai 12 mm ki plate se taiyar kar punah sthapit karna. Sath hi scraper ko baandhne hetu profile ke anusar hole wali plate lagakar/welding karke fix karna evam karya poorn hone ke pashchat trial dena.
Erection and Fabrication Work A 2
Cane carrier ke gale/ghise runner base ko kaat kar hatana. 100 mm ke channel se box banakar runner base ko lagana evam fit karna va purane channel ko nikal kar seedha karke palat kar lagana.
Erection and Fabrication Work A 3
Cane unloader ke purane ghise/kate 40/50 mm size ke sq. bar ko kaat kar hatana tatha yathasthan poorv ki bhanti naye sq. bar ko lagana evam santoshjanak trial dena.
Erection and Fabrication Work A 4
Cane carrier/rake carrier/bagasse elevator/R.B.C. ke ghise/kate runner ko kaatkar hatana. uske sthan par purane ko palat kar athva naye runner ko poorvanusar lagana.
Erection and Fabrication Work A 5
Cane carrier/rake carrier/R.B.C. ityadi chains ke side ki kati/ghisi/kamzor plate ko kaatkar hatana. uske sthan par purani athva nai plate ko lagana.
Erection and Fabrication Work A 6
Fibrizer hood ki side ki ghisi/kamzor plates ko kaatkar nikalna tatha yathasthan nai plate ko lagakar andar va bahar se welding kar santoshjanak trial dena.
Erection and Fabrication Work A 7
Bagasse baling machine ki sampoorn overhauling. testing evam trial dena.
Erection and Fabrication Work A 8
S.R.C./I.R.C. ki purani racks ki vanchhit marammat karna.
Erection and Fabrication Work A 9
Bagasse elevator/R.B.C. ki chains ki nai racks sample anusar taiyar karna.
Erection and Fabrication Work A 10
T.R.P.F. ke gale/kamzor bottom/top cover ko badalne ke liye naye cover poorvanusar banakar lagana evam santoshjanak trial dena.
Erection and Fabrication Work A 11
S.R.C./I.R.C. ke gale/kamzor tail end boots ko kaatkar hatana tatha sample anusar 8.0/10.0 mm moti purani/nai plate se taiyar kar lagana evam leak.proof welding kar santoshjanak trial dena.
Erection and Fabrication Work A 12
Cane unloaders ke panjon ke vibhinn parts ko dismantle karna. dismantle kiye gaye grabs ke sabhi parts ki vanchhit marammat karna. fingers par nirdeshanusar hardfacing kar panjon ka punah assembly karna.
Erection and Fabrication Work A 13
Mills ke compound imbibition hetu lagi juice tray mein se gali/kamzor juice tray ko kaatkar hatana. nai plate se sample anusar taiyar kar yathasthan lagana evam samast connection karna.
Erection and Fabrication Work A 14
Cane carrier/S.R.C./I.R.C. tatha bagasse elevator chains ko upar uthne se rokne ke liye lagi hui guides mein se ghisi/kamzor guides ko kaatkar hatana. nirdeshanusar nai guide taiyar kar yathasthan lagakar santoshjanak trial dena.
Erection and Fabrication Work A 15
Cane unloaders ke bridge/trolley drive ke ghise/kate wheels ko nirdeshanusar welding karna.
Erection and Fabrication Work A 16
T.R.P.F. ke gale/kamzor donali chutes ko kaatkar hatana tatha purane anusar naye donali chute fabricate kar yathasthan erection karna.
Erection and Fabrication Work A 17
Cane carrier ke liye lagi idler wheel par nirdeshanusar M.S. ke ring fabricate kar lagana.
Erection and Fabrication Work A 18
Mill head stock evam T.R.P.F. head stock ke beech nirdeshanusar 25.0 mm plate se support banakar lagana.
Erection and Fabrication Work A 19
Fibrizer ke purane hammer shanks ko nirdeshanusar welding evam hardfacing kar marammat karna evam balance karna.
Erection and Fabrication Work A 20
Cane chopper/leveller ke gale hue/kamzor hoods ko kaatkar hatana tatha nai plate se naya folding type banakar lagana.
Erection and Fabrication Work A 21
Fibrizer ke pocketed type anvil plate ki pockets ki tooti plates ko nai plates se badalna. mudi hui plates ko seedha karna tatha welding kar taiyar karke nirdeshanusar hardfacing karna.
Erection and Fabrication Work A 22
Cane leveller/chopper ke rotor assembly ki ghisi hubbo ke working side evam top sides ko welding kar samatal karna evam nirdeshanusar hardfacing karna.
Erection and Fabrication Work A 23
Cane unloaders par lage reduction gear evam motors ke kamzor beds ko kaatkar naye modify karke naye bed banakar lagana tatha gear evam motor ka alignment kar trial dena.
Erection and Fabrication Work A 24
Cane carrier ki structure ke gale/kamzor columns ko nirdeshanusar plate lagakar welding kar majbooti pradan karna.
Erection and Fabrication Work A 25
Mill rollers mein sample anusar juice ring fabricate kar fit karna.
Erection and Fabrication Work A 26
T.R.P.F. evam mill ke beech mein lage pressure chutes ki vanchhit marammat karna.
Erection and Fabrication Work A 27
Mills ke gale/kamzor juice receiving tank ko kaatkar hatana. 8.0/10.0 mm moti plate se sample anusar tank fabricate kar yathasthan fit karna evam samast connection kar leak.proof trial dena.
Erection and Fabrication Work A 28
Mill ke juice receiving tank ke gale/kamzor bottom cone ko kaatkar hatana. sample anusar naya cone fabricate kar yathasthan fit karna. samast connection poorv ki bhanti karke leak.proof trial dena.
Erection and Fabrication Work A 29
Mill juice tray se gutter ke madhya lage 10Inch/12 Inch size ke gale/kamzor pipes ko kaatkar hatana tatha unke sthan par S.S. ke naye pipe fabricate kar fit karna evam leak.proof trial dena.
Erection and Fabrication Work A 30
S.R.C./I.R.C. ki bottom trough mein 3.00 mm motai ki S.S. plate se lining kar leak.proof welding karna.
Erection and Fabrication Work A 31
Boiler par feed pump no. 01 ka jo bed hil gaya hai use ukhadkar naya bed banakar lagana evam sambandhit connection kar trial dena.
Erection and Fabrication Work A 32
Boiler station par purani I.D. fan ki ducting mein chimney se pehle nai/purani plate se damper leak.proof banana tatha poori welding karna jisse nai I.D. chalne par chimney se back hawa na aaye.
Erection and Fabrication Work A 33
Teeno wet scrubber ke pumps ke nipple reducers tatha inki gali pipe lines ko kaatkar hatana tatha naye pipe lines ko lagana tatha samast connection poorv ki bhanti karke leak.proof welding karna.
Erection and Fabrication Work A 34
Wet scrubber ki venturi ke andar samast nozzles ko kholna. kharab nozzles ko hatana evam naye nozzle lagana tatha samast connection poorv ki bhanti karna.
Erection and Fabrication Work A 35
Service tank se wet scrubber tak back wash hetu purani boiler tubes se nai pipe taiyar karna evam pipe line mein nai valve tatha clamp lagakar samast connection karna.
Erection and Fabrication Work A 36
T.R.P.F. ke neeche se mill juice tray mein juice lane wali tray mein se kamzor evam gali juice tray ko kaatkar hatana. nai banakar chalana.
Erection and Fabrication Work A 37
Boilers ke gale/kamzor ash chutes ko kaatkar hatana. purani/nai plate se purane anusar naye chutes fabricate kar yathasthan fit karna.
Erection and Fabrication Work A 38
Air heaters. economizer. F.D./I.D. fans ke inlet/outlet athva suction/delivery ke gale/kamzor dampers ki vanchhit marammat kar theek karna.
Erection and Fabrication Work A 39
Boilers ke drum mein lagne wale internal steam filter ke lage frames evam jaliyon ko badalne ke liye naye frame banakar jali fit karna.
Erection and Fabrication Work A 40
I.D. fans se chimney ke beech ki gali/kamzor flue gas ducting ko kaatkar hatana. inke sthan par 5.0/6.0 mm moti plate se banakar lagana. leak.proof trial dena.
Erection and Fabrication Work A 41
Bagassilo fan ke kamzor. sample anusar naye impeller taiyar karna. casing ki vanchhit marammat karna evam safal trial dena evam naya banana.
Erection and Fabrication Work A 42
I.D./F.D. fans ki casing mein lage suction cone mein se gale/kamzor cones ko kaatkar hatana. naye cone sample anusar banakar lagana. safal trial dena.
Erection and Fabrication Work A 43
Boiler feed tank ke andar lagi baffle plates ki gali kamzor jali/perforated sheet ko badalna.
Erection and Fabrication Work A 44
Boiler No. 1. 2 va 3 ke gale/kamzor bagasse feeding chutes ko kaatkar hatana tatha vanchhit marammat karna.
Erection and Fabrication Work A 45
20 Ton kshamata ke Boiler No. 1 va 2 ki furnace mein F.D. ki atirikt hawa dene ke liye bahar se lage air headers mein se gale/kamzor headers ko naye headers se badalna.
Erection and Fabrication Work A 46
Air heater se I.D. fans ke beech ki gali/kamzor ducting ko kaatkar 5/6 mm moti plate se ducting taiyar kar lagana.
Erection and Fabrication Work A 47
Bagasse elevator mein bagasse se bagassilo filtration ke liye lagi perforated jaliyon mein se kshatigrast jaliyon ko hatakar nai jali fit karna.
Erection and Fabrication Work A 48
20 Ton kshamata ke Boiler No. 1 va 2 ke economizer coils/tubes ko neeche utarna. tubes ki antarik evam bahya safai uparant tubes ki manak pressure par hydraulic testing karna. testing uparant tubes ko upar chadha kar economizer ke band baandhkar leak.proof kar economizers ki santoshjanak hydraulic testing dena.
Erection and Fabrication Work A 49
S.R.C./I.R.C. ke gale/kamzor trough ke channel/plate ko kaatkar hatana tatha nirdeshanusar fabricate kar yathasthan lagana.
Erection and Fabrication Work A 50
Boilers ki chimney ki strengthening hetu angle iron ke rings banakar lagana.
Erection and Fabrication Work A 51
Cane unloader ke truss type bridge structure jo kamzor evam kshatigrast hai ko naye channel. angle va plate lagakar avashyak strengthening kar santoshjanak strength pradan karna.
Erection and Fabrication Work A 52
S.R.C./I.R.C. chains ki block type chain ki links ke dono siron ke oval hue/ghis kar badh gaye holes ko weld karna. tatha attachment mein baandhkar pin ke size ke hole karna evam faces par grinding kar samatal karna.
Erection and Fabrication Work A 53
S.R.C./I.R.C. chains ki block type chain ki links par rack baandhne ke liye lagi attachment jo ghis kar kamzor ho gayi hai tatha holes badh gaye hain. use kaatkar hatana evam 12 mm moti plate se attachment link poorv ki bhanti taiyar kar links par weld karna. drawing anusar holes drill kar taiyar karna.
Erection and Fabrication Work A 54
Teeno unloaders par jaane ke alag se purane angle channel se plateform rasta banana.
Erection and Fabrication Work A 55
I.D. fan casing. air heater cell/ducting. economizer cell ke gale/kamzor bhagon ko badalna.
Erection and Fabrication Work A 56
S.R.C./I.R.C. ki bottom trough evam boot ki M.S. ki purani plate ko kaatkar hatana. nai plate lagakar trough va boot ko leak.proof karna tatha iske upar S.S. ki 3 mm motai ki plate lagakar boot evam trough ki lining karna evam santoshjanak trial dena.
Erection and Fabrication Work A 57
S.R.C./I.R.C. chains hetu 25 mm moti plate se sample anusar nai rack fabricate karna. holes drill kar dono siron par upar.neeche chain ke rollers ko kaatkar support lagakar taiyar karna.
Erection and Fabrication Work A 58
T.R.P.F. evam mill ke beech mein lage pressure chutes ki vanchhit marammat karna.
Erection and Fabrication Work A 59
Cane unloader mein trolley ka jo 250 mm channel beech mein bend ho gaya hai use nikal kar line level karna. usmein structure ki strengthening karna. usmein gala/ghisa runner square bar fit karna evam diagonal check karna tatha wheel ka line level karna.
Erection and Fabrication Work A 60
Mill va power house ki crane ke charon wheel kholkar safai evam bearing check karna. tatha sabhi plumber block mein greasing karna. jo bearing kharab nikle use mill spare se badalna tatha wheel jo rut gaye hain unhe weld kar ek size mein karna va santoshjanak trial dena.
Erection and Fabrication Work A 61
T.R.P.F. ke top/bottom rollers ki ghisi shell/danton ki vanchhit marammat kar hardfacing karna tatha shell ki kam hui lambai ko poora karne ke liye dono sides mein avashyaktaanusar rings lagana.
Erection and Fabrication Work A 62
Mill ki gali kamzor juice tray ko kaatkar hatana tatha nai 5 mm ki S.S. plate se sample ke anuroop banakar taiyar karna evam leak.proof trial dena.
Erection and Fabrication Work A 63
Mill ki S.S. ki juice tray ki baadhit marammat karna.
Erection and Fabrication Work A 64
Mill ka head stock crack hone ya alignment kharab hone par head stock ko nikal kar bahar karna tatha regrout kar alignment karna evam sambandhit sabhi karya poorn karna.
Erection and Fabrication Work A 65
T.R.P.F. roller jo kharab ho gaye hain unki shaft nikal kar usmein shell ko gas se dismantle karna.
Erection and Fabrication Work A 66
Boiler se nikli 63.5 mm ki purani bends sahit tubes ko kaatkar 5.1 meter ki seedhi line banana. air heater hetu taiyar karna evam grinder maar kar safai karna.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Erection and Fabrication Work A 1 | Mill mein lage scraper hetu discharge chute ke jo bhag kamzor evam kat gaye hain. unhe kaatkar hatana tatha nai 12 mm ki plate se taiyar kar punah sthapit karna. Sath hi scraper ko baandhne hetu profile ke anusar hole wali plate lagakar/welding karke fix karna evam karya poorn hone ke pashchat trial dena. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 2 | Erection and Fabrication Work A 2 | Cane carrier ke gale/ghise runner base ko kaat kar hatana. 100 mm ke channel se box banakar runner base ko lagana evam fit karna va purane channel ko nikal kar seedha karke palat kar lagana. | 70 | per meter | bycn2.upcsffl.morna | 90 | |
| 3 | Erection and Fabrication Work A 3 | Cane unloader ke purane ghise/kate 40/50 mm size ke sq. bar ko kaat kar hatana tatha yathasthan poorv ki bhanti naye sq. bar ko lagana evam santoshjanak trial dena. | 90 | per meter | bycn2.upcsffl.morna | 90 | |
| 4 | Erection and Fabrication Work A 4 | Cane carrier/rake carrier/bagasse elevator/R.B.C. ke ghise/kate runner ko kaatkar hatana. uske sthan par purane ko palat kar athva naye runner ko poorvanusar lagana. | 300 | per meter | bycn2.upcsffl.morna | 90 | |
| 5 | Erection and Fabrication Work A 5 | Cane carrier/rake carrier/R.B.C. ityadi chains ke side ki kati/ghisi/kamzor plate ko kaatkar hatana. uske sthan par purani athva nai plate ko lagana. | 110 | per sq mtr | bycn2.upcsffl.morna | 90 | |
| 6 | Erection and Fabrication Work A 6 | Fibrizer hood ki side ki ghisi/kamzor plates ko kaatkar nikalna tatha yathasthan nai plate ko lagakar andar va bahar se welding kar santoshjanak trial dena. | 3 | per ton | bycn2.upcsffl.morna | 90 | |
| 7 | Erection and Fabrication Work A 7 | Bagasse baling machine ki sampoorn overhauling. testing evam trial dena. | 1 | lumpsum | bycn2.upcsffl.morna | 90 | |
| 8 | Erection and Fabrication Work A 8 | S.R.C./I.R.C. ki purani racks ki vanchhit marammat karna. | 120 | per nos | bycn2.upcsffl.morna | 90 | |
| 9 | Erection and Fabrication Work A 9 | Bagasse elevator/R.B.C. ki chains ki nai racks sample anusar taiyar karna. | 45 | per nos | bycn2.upcsffl.morna | 90 | |
| 10 | Erection and Fabrication Work A 10 | T.R.P.F. ke gale/kamzor bottom/top cover ko badalne ke liye naye cover poorvanusar banakar lagana evam santoshjanak trial dena. | 10 | per cover | bycn2.upcsffl.morna | 90 | |
| 11 | Erection and Fabrication Work A 11 | S.R.C./I.R.C. ke gale/kamzor tail end boots ko kaatkar hatana tatha sample anusar 8.0/10.0 mm moti purani/nai plate se taiyar kar lagana evam leak.proof welding kar santoshjanak trial dena. | 4 | per boot | bycn2.upcsffl.morna | 90 | |
| 12 | Erection and Fabrication Work A 12 | Cane unloaders ke panjon ke vibhinn parts ko dismantle karna. dismantle kiye gaye grabs ke sabhi parts ki vanchhit marammat karna. fingers par nirdeshanusar hardfacing kar panjon ka punah assembly karna. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 13 | Erection and Fabrication Work A 13 | Mills ke compound imbibition hetu lagi juice tray mein se gali/kamzor juice tray ko kaatkar hatana. nai plate se sample anusar taiyar kar yathasthan lagana evam samast connection karna. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 14 | Erection and Fabrication Work A 14 | Cane carrier/S.R.C./I.R.C. tatha bagasse elevator chains ko upar uthne se rokne ke liye lagi hui guides mein se ghisi/kamzor guides ko kaatkar hatana. nirdeshanusar nai guide taiyar kar yathasthan lagakar santoshjanak trial dena. | 22 | per guide | bycn2.upcsffl.morna | 90 | |
| 15 | Erection and Fabrication Work A 15 | Cane unloaders ke bridge/trolley drive ke ghise/kate wheels ko nirdeshanusar welding karna. | 22 | per nos | bycn2.upcsffl.morna | 90 | |
| 16 | Erection and Fabrication Work A 16 | T.R.P.F. ke gale/kamzor donali chutes ko kaatkar hatana tatha purane anusar naye donali chute fabricate kar yathasthan erection karna. | 3 | per chute suit | bycn2.upcsffl.morna | 90 | |
| 17 | Erection and Fabrication Work A 17 | Cane carrier ke liye lagi idler wheel par nirdeshanusar M.S. ke ring fabricate kar lagana. | 10 | per nos | bycn2.upcsffl.morna | 90 | |
| 18 | Erection and Fabrication Work A 18 | Mill head stock evam T.R.P.F. head stock ke beech nirdeshanusar 25.0 mm plate se support banakar lagana. | 8 | per nos | bycn2.upcsffl.morna | 90 | |
| 19 | Erection and Fabrication Work A 19 | Fibrizer ke purane hammer shanks ko nirdeshanusar welding evam hardfacing kar marammat karna evam balance karna. | 72 | per nos | bycn2.upcsffl.morna | 90 | |
| 20 | Erection and Fabrication Work A 20 | Cane chopper/leveller ke gale hue/kamzor hoods ko kaatkar hatana tatha nai plate se naya folding type banakar lagana. | 2 | per ton | bycn2.upcsffl.morna | 90 | |
| 21 | Erection and Fabrication Work A 21 | Fibrizer ke pocketed type anvil plate ki pockets ki tooti plates ko nai plates se badalna. mudi hui plates ko seedha karna tatha welding kar taiyar karke nirdeshanusar hardfacing karna. | 1 | lumpsum | bycn2.upcsffl.morna | 90 | |
| 22 | Erection and Fabrication Work A 22 | Cane leveller/chopper ke rotor assembly ki ghisi hubbo ke working side evam top sides ko welding kar samatal karna evam nirdeshanusar hardfacing karna. | 1 | lumpsum | bycn2.upcsffl.morna | 90 | |
| 23 | Erection and Fabrication Work A 23 | Cane unloaders par lage reduction gear evam motors ke kamzor beds ko kaatkar naye modify karke naye bed banakar lagana tatha gear evam motor ka alignment kar trial dena. | 3 | per hp | bycn2.upcsffl.morna | 90 | |
| 24 | Erection and Fabrication Work A 24 | Cane carrier ki structure ke gale/kamzor columns ko nirdeshanusar plate lagakar welding kar majbooti pradan karna. | 8 | per nos | bycn2.upcsffl.morna | 90 | |
| 25 | Erection and Fabrication Work A 25 | Mill rollers mein sample anusar juice ring fabricate kar fit karna. | 16 | per nos | bycn2.upcsffl.morna | 90 | |
| 26 | Erection and Fabrication Work A 26 | T.R.P.F. evam mill ke beech mein lage pressure chutes ki vanchhit marammat karna. | 4 | per chute suit | bycn2.upcsffl.morna | 90 | |
| 27 | Erection and Fabrication Work A 27 | Mills ke gale/kamzor juice receiving tank ko kaatkar hatana. 8.0/10.0 mm moti plate se sample anusar tank fabricate kar yathasthan fit karna evam samast connection kar leak.proof trial dena. | 3 | per tank | bycn2.upcsffl.morna | 90 | |
| 28 | Erection and Fabrication Work A 28 | Mill ke juice receiving tank ke gale/kamzor bottom cone ko kaatkar hatana. sample anusar naya cone fabricate kar yathasthan fit karna. samast connection poorv ki bhanti karke leak.proof trial dena. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 29 | Erection and Fabrication Work A 29 | Mill juice tray se gutter ke madhya lage 10Inch/12 Inch size ke gale/kamzor pipes ko kaatkar hatana tatha unke sthan par S.S. ke naye pipe fabricate kar fit karna evam leak.proof trial dena. | 4 | per nos | bycn2.upcsffl.morna | 90 | |
| 30 | Erection and Fabrication Work A 30 | S.R.C./I.R.C. ki bottom trough mein 3.00 mm motai ki S.S. plate se lining kar leak.proof welding karna. | 50 | per square feet sq ft | bycn2.upcsffl.morna | 90 | |
| 31 | Erection and Fabrication Work A 31 | Boiler par feed pump no. 01 ka jo bed hil gaya hai use ukhadkar naya bed banakar lagana evam sambandhit connection kar trial dena. | 1 | lumpsum | bycn2.upcsffl.morna | 90 | |
| 32 | Erection and Fabrication Work A 32 | Boiler station par purani I.D. fan ki ducting mein chimney se pehle nai/purani plate se damper leak.proof banana tatha poori welding karna jisse nai I.D. chalne par chimney se back hawa na aaye. | 4 | per nos | bycn2.upcsffl.morna | 90 | |
| 33 | Erection and Fabrication Work A 33 | Teeno wet scrubber ke pumps ke nipple reducers tatha inki gali pipe lines ko kaatkar hatana tatha naye pipe lines ko lagana tatha samast connection poorv ki bhanti karke leak.proof welding karna. | 3 | per scrubber | bycn2.upcsffl.morna | 90 | |
| 34 | Erection and Fabrication Work A 34 | Wet scrubber ki venturi ke andar samast nozzles ko kholna. kharab nozzles ko hatana evam naye nozzle lagana tatha samast connection poorv ki bhanti karna. | 3 | per scrubber | bycn2.upcsffl.morna | 90 | |
| 35 | Erection and Fabrication Work A 35 | Service tank se wet scrubber tak back wash hetu purani boiler tubes se nai pipe taiyar karna evam pipe line mein nai valve tatha clamp lagakar samast connection karna. | 1 | lumpsum | bycn2.upcsffl.morna | 90 | |
| 36 | Erection and Fabrication Work A 36 | T.R.P.F. ke neeche se mill juice tray mein juice lane wali tray mein se kamzor evam gali juice tray ko kaatkar hatana. nai banakar chalana. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 37 | Erection and Fabrication Work A 37 | Boilers ke gale/kamzor ash chutes ko kaatkar hatana. purani/nai plate se purane anusar naye chutes fabricate kar yathasthan fit karna. | 6 | per chute suit | bycn2.upcsffl.morna | 90 | |
| 38 | Erection and Fabrication Work A 38 | Air heaters. economizer. F.D./I.D. fans ke inlet/outlet athva suction/delivery ke gale/kamzor dampers ki vanchhit marammat kar theek karna. | 18 | per nos | bycn2.upcsffl.morna | 90 | |
| 39 | Erection and Fabrication Work A 39 | Boilers ke drum mein lagne wale internal steam filter ke lage frames evam jaliyon ko badalne ke liye naye frame banakar jali fit karna. | 3 | per jali | bycn2.upcsffl.morna | 90 | |
| 40 | Erection and Fabrication Work A 40 | I.D. fans se chimney ke beech ki gali/kamzor flue gas ducting ko kaatkar hatana. inke sthan par 5.0/6.0 mm moti plate se banakar lagana. leak.proof trial dena. | 2 | per ton | bycn2.upcsffl.morna | 90 | |
| 41 | Erection and Fabrication Work A 41 | Bagassilo fan ke kamzor. sample anusar naye impeller taiyar karna. casing ki vanchhit marammat karna evam safal trial dena evam naya banana. | 1 | per nos | bycn2.upcsffl.morna | 90 | |
| 42 | Erection and Fabrication Work A 42 | I.D./F.D. fans ki casing mein lage suction cone mein se gale/kamzor cones ko kaatkar hatana. naye cone sample anusar banakar lagana. safal trial dena. | 5 | per cone | bycn2.upcsffl.morna | 90 | |
| 43 | Erection and Fabrication Work A 43 | Boiler feed tank ke andar lagi baffle plates ki gali kamzor jali/perforated sheet ko badalna. | 5 | per jali | bycn2.upcsffl.morna | 90 | |
| 44 | Erection and Fabrication Work A 44 | Boiler No. 1. 2 va 3 ke gale/kamzor bagasse feeding chutes ko kaatkar hatana tatha vanchhit marammat karna. | 4 | per chute suit | bycn2.upcsffl.morna | 90 | |
| 45 | Erection and Fabrication Work A 45 | 20 Ton kshamata ke Boiler No. 1 va 2 ki furnace mein F.D. ki atirikt hawa dene ke liye bahar se lage air headers mein se gale/kamzor headers ko naye headers se badalna. | 4 | per header | bycn2.upcsffl.morna | 90 | |
| 46 | Erection and Fabrication Work A 46 | Air heater se I.D. fans ke beech ki gali/kamzor ducting ko kaatkar 5/6 mm moti plate se ducting taiyar kar lagana. | 5 | per ton | bycn2.upcsffl.morna | 90 | |
| 47 | Erection and Fabrication Work A 47 | Bagasse elevator mein bagasse se bagassilo filtration ke liye lagi perforated jaliyon mein se kshatigrast jaliyon ko hatakar nai jali fit karna. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 48 | Erection and Fabrication Work A 48 | 20 Ton kshamata ke Boiler No. 1 va 2 ke economizer coils/tubes ko neeche utarna. tubes ki antarik evam bahya safai uparant tubes ki manak pressure par hydraulic testing karna. testing uparant tubes ko upar chadha kar economizer ke band baandhkar leak.proof kar economizers ki santoshjanak hydraulic testing dena. | 2 | per job lumpsum | bycn2.upcsffl.morna | 90 | |
| 49 | Erection and Fabrication Work A 49 | S.R.C./I.R.C. ke gale/kamzor trough ke channel/plate ko kaatkar hatana tatha nirdeshanusar fabricate kar yathasthan lagana. | 2 | ek job lumpsum | bycn2.upcsffl.morna | 90 | |
| 50 | Erection and Fabrication Work A 50 | Boilers ki chimney ki strengthening hetu angle iron ke rings banakar lagana. | 20 | per ring lumpsum | bycn2.upcsffl.morna | 90 | |
| 51 | Erection and Fabrication Work A 51 | Cane unloader ke truss type bridge structure jo kamzor evam kshatigrast hai ko naye channel. angle va plate lagakar avashyak strengthening kar santoshjanak strength pradan karna. | 1 | per nos | bycn2.upcsffl.morna | 90 | |
| 52 | Erection and Fabrication Work A 52 | S.R.C./I.R.C. chains ki block type chain ki links ke dono siron ke oval hue/ghis kar badh gaye holes ko weld karna. tatha attachment mein baandhkar pin ke size ke hole karna evam faces par grinding kar samatal karna. | 450 | prati link | bycn2.upcsffl.morna | 90 | |
| 53 | Erection and Fabrication Work A 53 | S.R.C./I.R.C. chains ki block type chain ki links par rack baandhne ke liye lagi attachment jo ghis kar kamzor ho gayi hai tatha holes badh gaye hain. use kaatkar hatana evam 12 mm moti plate se attachment link poorv ki bhanti taiyar kar links par weld karna. drawing anusar holes drill kar taiyar karna. | 300 | prati link | bycn2.upcsffl.morna | 90 | |
| 54 | Erection and Fabrication Work A 54 | Teeno unloaders par jaane ke alag se purane angle channel se plateform rasta banana. | 1 | lumpsum | bycn2.upcsffl.morna | 90 | |
| 55 | Erection and Fabrication Work A 55 | I.D. fan casing. air heater cell/ducting. economizer cell ke gale/kamzor bhagon ko badalna. | 45 | prati varg meter sq mtr | bycn2.upcsffl.morna | 90 | |
| 56 | Erection and Fabrication Work A 56 | S.R.C./I.R.C. ki bottom trough evam boot ki M.S. ki purani plate ko kaatkar hatana. nai plate lagakar trough va boot ko leak.proof karna tatha iske upar S.S. ki 3 mm motai ki plate lagakar boot evam trough ki lining karna evam santoshjanak trial dena. | 1 | ek job lumpsum | bycn2.upcsffl.morna | 90 | |
| 57 | Erection and Fabrication Work A 57 | S.R.C./I.R.C. chains hetu 25 mm moti plate se sample anusar nai rack fabricate karna. holes drill kar dono siron par upar.neeche chain ke rollers ko kaatkar support lagakar taiyar karna. | 25 | per rack | bycn2.upcsffl.morna | 90 | |
| 58 | Erection and Fabrication Work A 58 | T.R.P.F. evam mill ke beech mein lage pressure chutes ki vanchhit marammat karna. | 4 | per chute suit | bycn2.upcsffl.morna | 90 | |
| 59 | Erection and Fabrication Work A 59 | Cane unloader mein trolley ka jo 250 mm channel beech mein bend ho gaya hai use nikal kar line level karna. usmein structure ki strengthening karna. usmein gala/ghisa runner square bar fit karna evam diagonal check karna tatha wheel ka line level karna. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 60 | Erection and Fabrication Work A 60 | Mill va power house ki crane ke charon wheel kholkar safai evam bearing check karna. tatha sabhi plumber block mein greasing karna. jo bearing kharab nikle use mill spare se badalna tatha wheel jo rut gaye hain unhe weld kar ek size mein karna va santoshjanak trial dena. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 61 | Erection and Fabrication Work A 61 | T.R.P.F. ke top/bottom rollers ki ghisi shell/danton ki vanchhit marammat kar hardfacing karna tatha shell ki kam hui lambai ko poora karne ke liye dono sides mein avashyaktaanusar rings lagana. | 8 | per nos | bycn2.upcsffl.morna | 90 | |
| 62 | Erection and Fabrication Work A 62 | Mill ki gali kamzor juice tray ko kaatkar hatana tatha nai 5 mm ki S.S. plate se sample ke anuroop banakar taiyar karna evam leak.proof trial dena. | 4 | per nos | bycn2.upcsffl.morna | 90 | |
| 63 | Erection and Fabrication Work A 63 | Mill ki S.S. ki juice tray ki baadhit marammat karna. | 4 | per nos | bycn2.upcsffl.morna | 90 | |
| 64 | Erection and Fabrication Work A 64 | Mill ka head stock crack hone ya alignment kharab hone par head stock ko nikal kar bahar karna tatha regrout kar alignment karna evam sambandhit sabhi karya poorn karna. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 65 | Erection and Fabrication Work A 65 | T.R.P.F. roller jo kharab ho gaye hain unki shaft nikal kar usmein shell ko gas se dismantle karna. | 3 | per nos | bycn2.upcsffl.morna | 90 | |
| 66 | Erection and Fabrication Work A 66 | Boiler se nikli 63.5 mm ki purani bends sahit tubes ko kaatkar 5.1 meter ki seedhi line banana. air heater hetu taiyar karna evam grinder maar kar safai karna. | 120 | per nos | bycn2.upcsffl.morna | 90 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for erection and fabrication work
Financial statements / turnover proof
EMD submission proof (₹240)
Technical bid documents
OEM authorizations (if required)
Any ATC-approved compliance certificates
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD of ₹240. Review ATC for delivery terms and the option clause allowing ±25% quantity variation. Ensure capability for 66 BOQ items and compliance with delivery extension calculations and minimum 30 days extension rule.
Required documents include GST registration, PAN, experience certificates for erection work, financial statements, EMD proof of ₹240, technical bid documents, OEM authorizations if applicable, and the ATC document uploaded by the buyer outlining specific terms.
No itemized technical specs were published; the contract covers 66 BOQ items under Erection and Fabrication Work A1–A66. bidders must rely on the ATC for any hidden requirements and ensure capability to execute large-scale fabrication with general structural workmanship.
Delivery extensions are calculated using the formula: (additional quantity ÷ original quantity) × original delivery period, with a minimum of 30 days. This applies if the purchaser exercises the 25% quantity variation option.
The EMD for bid submission is ₹240. Bidders must provide this amount as part of bid security, aligned with the ATC’s conditions for tender participation.
Applicants should demonstrate experience in erection and fabrication, provide financial turnover documents, and comply with the option clause for quantity variation. Ensure capability to manage 66 BOQ items and adhere to delivery extension provisions per ATC.
The ATC document contains bidder-specific terms, delivery rules, and any special clauses not in the main tender text. Review it to confirm payment terms, penalties, required certifications, and any OEM authorization needs before submission.
The Uttar Pradesh Cooperative Sugar Factories Federation Limited is the issuing organization. Bid submissions should align with the ATC and the 66-item BOQ scope for Erection and Fabrication Work A1–A66.
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS