Progress
RAThe Directorate Of Printing, New Delhi, seeks procurement of Strapping Roll (Q3), with scope limited to the supply of goods. The bid contemplates the possibility to adjust quantity by up to 25% during and after contract, at contracted rates. Delivery timelines reference the original delivery period and extended periods, with minimum additional time of 30 days. The bid requires compliance with the supplied ATC and corrigenda and emphasizes advance sample approval post-award, with submission of 2 samples within 5 days. This tender lacks an explicit BOQ and does not publish an estimated value or start date in the provided data. A clear emphasis is placed on bidder adherence to option-clause delivery mechanics and sample-based validation prior to bulk manufacturing.
Product name: Strapping Roll
Category: Q3
Location: New Delhi, Delhi
Scope: Supply of Goods only
Delivery: Per original delivery period with potential extension via option clause
Quality/docs: Upload required certificates and evidence per tender terms
25% quantity increase/decrease option during contract
Advance sample approval process within 5 days of award
Documentation strictness: upload all required compliance certificates
Not specified in data; payment terms to be defined in Bid Document and ATC.
Delivery period calculated from original delivery order; extended time based on increased quantity with minimum 30 days.
Not specified in data; penalties to be detailed in Bid Document/ATC.
Proven experience in supplying similar strapping or packaging materials
Ability to submit advance samples within 5 days of award
Compliance with all required certificates/documents per Bid Document
Start
23-Sep-2026, 11:00 am
End
24-Sep-2026, 11:00 am
Duration: 24 hours
Reverse Auction Document
✅ RA concluded. Check financial results for final rankings.
Quantity
50
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Strapping Roll (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Central
Delivery Pincodes
110002
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| BALRAM NARAYAN | 110002,Govt. of India Press Minto Road | Central | Delhi | 110002 | 50 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates or contract/invoice documents as proof of past work
Financial statements or equivalent evidence of financial capacity
Advance sample submission documents (2 samples within 5 days of award)
Any certificates/documents sought in Bid Document, ATC and Corrigendum
Key insights about DELHI tender market
Bidders should prepare all standard documents (GST, PAN, experience proofs, financials) and upload them with the bid. Ensure compliance with ATC and corrigenda, submit 2 advance samples within 5 days of award, and readiness to accept up to 25% quantity variation at contracted rates.
Required documents include GST certificate, PAN, experience certificates or contract invoices, financial statements, and advance sample submission proof. Also upload all certificates requested in Bid Document, ATC, and any corrigenda related to the tender.
Delivery time follows the original delivery period; if quantity increases, extended time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, and may extend to the original period during option execution.
Acceptable proofs include contract copies with invoices, execution certificates from clients, or third-party inspection notes showing execution of similar supply contracts, enabling eligibility without a fixed single document.
Yes. The successful bidder must submit 2 advance samples within 5 days of award; buyer will approve or specify modifications within 5 days, after which bulk supply must adhere to the approved sample.
Tender data does not specify exact standards; bidders should rely on Bid Document and ATC for required certificates, ensuring document uploads meet the buyer’s stipulated criteria.
Quantity variation up to 25% is permitted at contracted rates; extended delivery time is calculated per the option formula, with a minimum 30-day extension referenced in the terms.
Scope is strictly the supply of goods; no installation or services are included. All costs should be included in the bid price, covering the complete supply chain as per the ATC.