TenderDekho Logo
GEM

Bids are Invited For Staircase wiring,2 Module,4 Module,8 Module,12 Module,5 or 6 A switch,2 way 5 or 6 A switch,15 or 1 in AMRELI, GUJARAT

Bid Publish Date

29-Oct-2025, 10:27 am

Bid End Date

03-Dec-2025, 11:00 am

Value

₹9,24,488

Generate Docs

Progress

Issue29-Oct-2025, 10:27 am
Corrigendum26-Nov-2025
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1090

Category

Staircase wiring

Bid Type

Two Packet Bid

Categories 145

COPPER WIRE LIGHTNING ARRESTER NATURAL FUELS WIND MILL ENERGY PROJECT APPARELS CIRCULAR SAW ANGLE BUFFER PLATE APFC PANEL POLYETHYLENE PIPE BARITONE HORNS COPPER COIL DISTRIBUTION BOARD COPPER CABLE COPPER STRIP FASTENER SUB STATION POWER CABLE CABBING EQUIPMENTS PTFE WIRE AIR CYLINDERS TUBE AND FITTING ARNO STARTING CONTACTOR AIR COOLED ENGINE ELECTRICAL PRODUCTS CABLE LADDER BUS CABLE SWITCH YARD WIRING SPECIFICATION DISTRIBUTION?BOX DIRECT TRANSFORMER ELECTROCARDIOGRAPHY UNITS SWITCHING APPARATUS JOINTING OF PIPE BORING MACHINE FERROUS ALLOY SUPPLY SILVER TIP SUPPLY OF SCHOOL UNIFORM WELDING BRAZING AND SOLDERING SERVICES STRIP DISCRETE COMPONENTS ELECTRICAL WIRE XLPE CABLE CABLE DUCT CIRCUIT PROTECTION DEVICE LIGHTENING PROTECTION DEVICE CFL INSULATED WIRE TELECOM EQUIPMENT SOIL EARTH SNG COPPER ALLOY CLOTHING EQUIPMENT INSTRUMENTATION CABLE ELECTRICAL SUBSTATION STATIC CONVERTERS ELECTRICAL?CONDUIT MINING ENGINEERING DRY CELL BATTERIES COPPER SHEET EARTH LEAKAGE RELAY WINDING MACHINE STOMACHERS BASE PLATE CONDUCTOR TRANSPORTATION SOCKET POWER WIRE SUPPLY ALUMINIUM ALLOY CB BOX BRACKET EARTH PIPE GI PIPE HIGH TENSION PANEL LED LUMINARIES BATTERY ADAPTER AND ACCESSORIES COILED CABLE VOLTMETER MAGAZINE TUBE LIGHT LFH CABLE EARTH AND STONE ELECTRODES OCEAN ENGINEERING PVC CABLE BRAZE RINGS GLUCOMETER BEARING HOLDERS SWITCH BOX AWM WIRE TELECOM TOWER CABLE LAYING POWER WIRE TECHNICAL SERVICES ACID ANIMAL LABORATORY EQUIPMENT TUBE MASONARY WORK BOX SAFETY SWITCHES WATER LEVEL RECORDER STABILIZER WIRE AIRCRAFT HANGER FILTER RETAINERS FUME HOODS DISTRIBUTION PANEL BRONZE PIPE CHARGING STATION ENT SET SUPPLY OF POWER FILLING RAIN CUT FLUORESCENT LAMP LFH WIRE MODULAR SWITCH FIBERS THREADS AND YARNS SOLAR POLE BARE CABLE BACKHOE TRANSITION METALS ANGLE BRACKETS SOLID AND GEL FUELS CABLE MACHINE PLASTIC BATTERY EXCAVATION AUTOMOTIVE CABLE BASE METALS BUNDI LOW TENSION PANEL ARM CHAIR PEB CABLE SUPPLY ALUMINUM CABLE TRAY FAN BAR EARTH MOVING MINERAL LABOUR GALVANIZED IRON PIPE SWITCH SUPPLY

Public procurement opportunity for Directorate General Of Lighthouses And Lightships Staircase wiring, 2 Module, 4 Module, 8 Module, 12 Module, 5 or 6 A switch, 2 way 5 or 6 A switch, 15 or 16 A switch, 3 pin 5 or 6 A socket outlet, 6 pin 15 or16 A socket outlet, Brass Holder, Blanking Plate, Installation of Bulkhead, Installation of Tubelight, PVC Conduit 20 mm, Copper wire 3 x 1. 5 sq mm, Copper wire 3 x 2. 5 sq mm, Copper wire 3 x 4 sq mm, 3C, 6 sq mm copper XLPE armoured Cable, 3C, 4 sq mm copper XLPE armoured Cable, 3C, 6 sq mm copper XLPE unarmoured Cable, 3C, 4 sq mm copper XLPE unarmoured Cable, Cable Laying work in ground, Cable Laying work in open duct, 6 way, Double door MCB Board, 12 way, Double door MCB Board, 4 way 4 plus 12, Double Door MCB Board, DP Sheet steel enclosure with 2P MCB, Single Pole 20 A MCB, Double Pole 32 A 07 Nos and 10 A 04 Nos MCB, Double Pole 40 A MCB, Change over 40 A MCB, Supply of battery charger, LED Tube Light, LED Bulkhead, supply of uPVC cable tray, Supply of Wall Fan, Labour charges for fitting uPVC tray, Copper strip for earthing, Copper rod, Supply of copper cable, Supply of ESE Base Lightning Arrester, Lightning Arrester Stand, Labour charges for fitting of copper strip, Lightning Arrester Earthing work, Service Room Earthing work in AMRELI, GUJARAT. Quantity: 1090 issued by. Submission Deadline: 03-12-2025 11: 00: 00. View full details and respond.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Staircase wiring , 2 Module , 4 Module , 8 Module , 12 Module , 5 or 6 A switch , 2 way 5 or 6 A switch , 15 or 16 A switch , 3 pin 5 or 6 A socket outlet , 6 pin 15 or16 A socket outlet , Brass Holder , Blanking Plate , Installation of Bulkhead , Installation of Tubelight , PVC Conduit 20 mm , Copper wire 3 x 1.5 sq mm , Copper wire 3 x 2.5 sq mm , Copper wire 3 x 4 sq mm , 3C,6 sq mm copper XLPE armoured Cable , 3C,4 sq mm copper XLPE armoured Cable , 3C,6 sq mm copper XLPE unarmoured Cable , 3C,4 sq mm copper XLPE unarmoured Cable , Cable Laying work in ground , Cable Laying work in open duct , 6 way,Double door MCB Board , 12 way,Double door MCB Board , 4 way 4 plus 12 , Double Door MCB Board , DP Sheet steel enclosure with 2P MCB , Single Pole 20 A MCB , Double Pole 32 A 07 Nos and 10 A 04 Nos MCB , Double Pole 40 A MCB , Change over 40 A MCB , Supply of battery charger , LED Tube Light , LED Bulkhead , supply of uPVC cable tray , Supply of Wall Fan , Labour charges for fitting uPVC tray , Copper strip for earthing , Copper rod , Supply of copper cable , Supply of ESE Base Lightning Arrester , Lightning Arrester Stand , Labour charges for fitting of copper strip , Lightning Arrester Earthing work , Service Room Earthing work

Authority Records

MINISTRY OF PORTS, SHIPPING AND WATERWAYSDIRECTORATE GENERAL OF LIGHTHOUSES AND LIGHTSHIPS
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-8437507.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Staircase wiring,2 Module,4 Module,6 Module,8 Module,12 Module,5 or 6 A switch,2 way 5 or 6 A switc

Directorate General Of Lighthouses And Lightships

PORBANDAR, GUJARAT

Posted: 16 July 2025
Closed: 6 August 2025
GEM

Switch 6A,Socket 6A,Top 6A,Switch 16A,Socket 16A,Top16A,Step Regulator,Angle Batten Holders,Pendant

Belagavi Institute Of Medical Sciences

BELGAUM, KARNATAKA

Posted: 25 July 2025
Closed: 9 August 2025
GEM

Wiring for light,fan point,Wiring for light or power plug,Wiring for circuit or submain along with

Directorate General Of Lighthouses And Lightships

KACHCHH, GUJARAT

Posted: 18 December 2024
Closed: 8 January 2025
GEM

2Core 7 20 Aluminium Flexible Cable 200mtr,3Core 1.5 Sqmm Copper Flexible Cable,32A DP MCB,7 20 Alu

Dg Of Defence Estate

CHENNAI, TAMIL NADU

Posted: 10 February 2025
Closed: 4 March 2025
GEM

Armoured cable 16sqmm,copper conductor cable,MCB 32 Amp SP,Batten holder,Exhaust fan,MCB 32 Amp DP,

Indian Army

BIKANER, RAJASTHAN

Posted: 25 September 2025
Closed: 6 October 2025
GEM

Bill of Quantities (BOQ) 47 Items Sign in for GEM prices

#1

Staircase wiring

Wiring for twin control light point with 1.5 sq. mm FRLS PVC insulated copper conductor single core cable in surface or recessed medium class PVC conduit 2 way modular switch,modular plate,suitable GI box and earthing the point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable etc.as required.

6 point Delivery: 60 days
#2

2 Module

Supplying and fixing 2 modules 75mm by 75mm,GI box or Surface Plastic box alongwith modular base and cover plate for modular switches in surface or recess etc.as required.

2 each Delivery: 60 days
#3

4 Module

Supplying and fixing 4 modules 125mm by 75mm,GI box or Surface Plastic box alongwith modular base and cover plate for modular switches in surface or recess etc.as required.

4 each Delivery: 60 days
#4

8 Module

Supplying and fixing 8 modules 200mm by 75mm,GI box or Surface Plastic box alongwith modular base and cover plate for modular switches in surface or recess etc.as required.

1 each Delivery: 60 days
#5

12 Module

Supplying and fixing 12 modules 200mm by 150mm,GI box or Surface Plastic box alongwith modular base and cover plate for modular switches in surface or recess etc.as required.

1 each Delivery: 60 days
#6

5 or 6 A switch

Supplying and fixing 5 or 6 A modular switch on the existing modular plate and switch box including connections but excluding modular plate etc.as required.

12 each Delivery: 60 days
#7

2 way 5 or 6 A switch

Supplying and fixing 2 way 5 or 6 A modular switch on the existing modular plate and switch box including connections but excluding modular plate etc.as required.

2 each Delivery: 60 days
#8

15 or 16 A switch

Supplying and fixing 15 or 16 A modular switch on the existing modular plate and switch box including connections but excluding modular plate etc.as required.

2 each Delivery: 60 days
#9

3 pin 5 or 6 A socket outlet

Supplying and fixing 3 pin 5 or 6 A modular socket on the existing modular plate and switch box including connections but excluding modular plate etc.as required.

5 each Delivery: 60 days
#10

6 pin 15 or16 A socket outlet

Supplying and fixing 6 pin 15 or 16 A modular socket on the existing modular plate and switch box including connections but excluding modular plate etc.as required.

2 each Delivery: 60 days
#11

Brass Holder

Supplying and fixing brass batten or Angle holder including connection etc. as required

4 each Delivery: 60 days
#12

Blanking Plate

Supplying and fixing modular blanking plate on the existing modular plate and switch box excluding modular plate as required.

10 each Delivery: 60 days
#13

Installation of Bulkhead

Installation,Testing,Commissioning of wall bracket or ceiling fitting of all sizes and shapes containing upto two GLS or CFL or LED lamp per fitting,complete with all accessories including connections etc.as required. Bulkhead fitting must be carried out on wooden patia

8 each Delivery: 60 days
#14

Installation of Tubelight

Installation,Testing,Commissioning of Pre wired,fluorescent fitting or compact fluorescent fitting of all types,complete with all accessories and tube or lamp etc.directly on ceiling or wall,including connections with 1.5 sq.mm FRLS PVC insulated,copper conductor,single core cable and earthing etc.as required.

4 each Delivery: 60 days
#15

PVC Conduit 20 mm

Supplying and fixing of 20 mm medium class PVC conduit along with accessories in surface or recess including cutting the wall and making good the same in case of recessed conduit as required.

80 mtr Delivery: 60 days
#16

Copper wire 3 x 1.5 sq mm

Supplying and drawing of 3 by 1.5 Sq mm FRLS PVC insulated copper conductor,single core cable in the existing surface or recessed steel or PVC conduit as required For Tube light,Lamp Holder,wall fan

40 mtr Delivery: 60 days
#17

Copper wire 3 x 2.5 sq mm

Supplying and drawing of 3 by 2.5 Sq mm FRLS PVC insulated copper conductor,single core cable in the existing surface or recessed steel or PVC conduit as required For Switch Board

60 mtr Delivery: 60 days
#18

Copper wire 3 x 4 sq mm

Supplying and drawing of 3 by 4 Sq mm FRLS PVC insulated copper conductor,single core cable in the existing surface or recessed steel or PVC conduit as required For All Power Point

20 mtr Delivery: 60 days
#19

3C,6 sq mm copper XLPE armoured Cable

Supply of power cable 3C and 6 sqmm,1.1 KV grade,FRLS,multistranded copper conductor,XLPE armoured cable. Finolex,Polycab or Havells make from Power House to Tower Base For Main Light and Tower Light.

120 mtr Delivery: 60 days
#20

3C,4 sq mm copper XLPE armoured Cable

Supply of power cable 3C and 4 sqmm,1.1 KV grade,FRLS,multistranded copper conductor,XLPE armoured cable. Finolex,Polycab or Havells make from Power House to Tower Base For Auxiliary Light.

60 mtr Delivery: 60 days
#21

3C,6 sq mm copper XLPE unarmoured Cable

Supply of power cable 3C and 6 sqmm,1.1 KV grade,FRLS,multistranded copper conductor,XLPE unarmoured cable. Finolex,Polycab or Havells make From Tower Base MCB Board to Tower Service Room For Main Light and Service Room

90 mtr Delivery: 60 days
#22

3C,4 sq mm copper XLPE unarmoured Cable

Supply of power cable 3C and 4 sqmm,1.1 KV grade,FRLS,multistranded copper conductor,XLPE unarmoured cable. Finolex,Polycab or Havells make From Tower Base MCB Board to Auxilary Light

35 mtr Delivery: 60 days
#23

Cable Laying work in ground

Laying of One number PVC insulated and PVC sheathed or XLPE power cable of 1.1 KV grade of 6sqmm or 4 Sq mm size direct in ground including excavation, sand cushioning, protective covering and refilling the trench etc. as required.

40 mtr Delivery: 60 days
#24

Cable Laying work in ground

Laying of One number additional PVC insulated and PVC sheathed XLPE power cable of 1.1 KV grade of 6 sqmm or 4 sqmm direct in ground in same trench in one tier horizontal formation including excavation, sand cushioning, protective covering and refilling the trench etc. as required.

80 mtr Delivery: 60 days
#25

Cable Laying work in open duct

Laying of One number PVC insulated and PVC sheathed XLPE power cable of 1.1 KV grade of 6 sqmm and 4 sqmm direct in ground in existing masonary open duct as required.

50 mtr Delivery: 60 days
#26

6 way,Double door MCB Board

Supplying and fixing 6 way,Double door ,single pole and neutral,sheet steel,MCB distribution board,240 V on surface or recess,complete with tinned copper bus bar,neutral bus bar,earth bar,din bar, interconnections, powder painted including earthing etc.as required But without MCB or RCCB or Isolator

1 each Delivery: 60 days
#27

12 way,Double door MCB Board

Supplying and fixing 12 way,Double door ,single pole and neutral,sheet steel,MCB distribution board,240 V on surface or recess,complete with tinned copper bus bar,neutral bus bar,earth bar,din bar, interconnections, powder painted including earthing etc.as required But without MCB or RCCB or Isolator

1 each Delivery: 60 days
#28

4 way 4 plus 12 , Double Door MCB Board

Supplying and fixing 4 way 4 plus 12,Double door, horizontal type three pole and neutral,sheet steel, MCB distribution board, 415 V, on surface or recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. But without MCB or RCCB or Isolator

1 each Delivery: 60 days
#29

DP Sheet steel enclosure with 2P MCB

Supplying and fixing DP sheet steel enclosure on surface or recess along with 40 A 240 V C curve DP MCB complete with connection testing and commissioning etc. as required

1 each Delivery: 60 days
#30

Single Pole 20 A MCB

Supplying and fixing Single Pole 20 A rating,240 or 415 V,10 kA, C curve,miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections,testing and commissioning etc.as required

4 each Delivery: 60 days
#31

Double Pole 32 A 07 Nos and 10 A 04 Nos MCB

Supplying and fixing 5 A to 32 A rating,240 or 415 V,10 kA, C curve,miniature circuit breaker suitable for inductive load of following poles in the existing MCB DB complete with connections,testing and commissioning etc.as required

11 each Delivery: 60 days
#32

Double Pole 40 A MCB

Supplying and fixing 40 A rating,Double Pole,240 V,10 kA, C curve,miniature circuit breaker suitable for inductive load in the existing MCB DB complete with connections,testing and commissioning etc.as required

6 each Delivery: 60 days
#33

Change over 40 A MCB

Supplying and fixing 40 A rating,Change Over Double Pole,240 V,10 kA, C curve,miniature circuit breaker suitable for inductive load in the existing MCB DB complete with connections,testing and commissioning etc.as required

1 each Delivery: 60 days
#34

Supply of battery charger

Supply of Battery Charger 12V, 10 A for Lead acid, Tubular and VRLA SMF batteries up to 200 Ah Battery, Transformer based, 01 or 02 nos independent charging station, Input voltage range equals 160 volt to 270VAC, Reverse polarity Protection, Short Circuit Protection and Over Current Protection, any ISI approved brand

1 each Delivery: 60 days
#35

LED Tube Light

Supply of LED Tube light fitting 20 W 230 V,4 ft in white colour,2200 lumen etc.Any reputed brand.

4 each Delivery: 60 days
#36

LED Bulkhead

Supply of Aluminum or PVC Bulkhead Light,IP 65 Protection with 10 Watt,230 V,Crompton,Philips,Bajaj

8 each Delivery: 60 days
#37

supply of uPVC cable tray

Supply of 1 Mtr length Cable trunking uPVC Tray 100 by 50 mm any reputed brand.

80 mtr Delivery: 60 days
#38

Supply of Wall Fan

Supply of Wall mounted Fan ,230 V,1 Ph,Copper winding,sweep size 400 mm,3 nos Blades,any reputed brand

1 each Delivery: 60 days
#39

Labour charges for fitting uPVC tray

Labour charges for dismantaling and removing old PVC cable tray,Screw and cables from Tower Base to Top of service room and Fitting new cable trunking PVC Tray 100 mm by 50 mm by using S.S. or brass screw and washer. The distance between two screw must be 1 feet and after fitting Cable tray, laying of old and new cable in cable trunking by using heavy duty cable tie as per instructed complete etc.with tools and plants.

80 mtr Delivery: 60 days
#40

Copper strip for earthing

Supply of 25 by 3 mm copper strip for lightning arrester earthing & Service room earthing for 27 mtr high lighthouse tower.

95 mtr Delivery: 60 days
#41

Copper rod

Supply of copper rod Earth Electrode 1.5 meter length by 25 mm dia for lightning arrester and service room Earthing 1 rod weight is 6.11 Kg it means 2 rod weight is 12.22 Kg.

2 each Delivery: 60 days
#42

Supply of copper cable

Supply of 16 Sqmm, 1 core Pvc Insulated, Copper Flexible FRLS Cable, Green colour

50 mtr Delivery: 60 days
#43

Supply of ESE Base Lightning Arrester

Supply of Stainless Steel Early Streamer Emission Lightning Protection System, Length 36.7 centimeter, diameter of rod 17 mm, height of terminal over the protection area 5 meter, protection radious 107 meter, time of defference 60 micro second.

1 no Delivery: 60 days
#44

Lightning Arrester Stand

Fabrication of Lightning arrester stand by using 80 mm C Class GI Pipe at 6 meter height, 1 feet by 1 feet by 10 mm thick GI Base plate and required 6 mm thickness copper plate on top of stand for arrester fitting,Insulater,brazing etc.Installation of Lightning arrester stand on top of LH tower The work inclusive of fitting work carry out on top of tower by using Heavy duty S.S.Anchor fastener masonary work RCC around stand up to 1 mtr fitting GI clamp for extra support by S.S.Nut,Bolt etc. complete

1 job Delivery: 60 days
#45

Labour charges for fitting of copper strip

Labour charges for the fitting of copper strip size 25 by 3 mm from bottom of tower to lightning arrester with copper clamp and brass screw properly at 2 ft distance on out side of tower in straight line including brazing,jointing with s.s.nut,bolt for fitting as required with tools & plant etc.complete

1 job Delivery: 60 days
#46

Lightning Arrester Earthing work

Labour charges for bore upto 60 ft in hard soil rock .Miscellaneour charges it means drilling,jointing with S.S. nut,bolt & brazing etc.and earthing materials like salt,charcoal,watering pipe and earthing pit masonary work including man & materials including boring machine transportation charges

1 job Delivery: 60 days
#47

Service Room Earthing work

Labour charges for bore upto 40 ft in hard soil rock .Miscellaneour charges it means drilling,jointing with S.S. nut,bolt & brazing etc.and earthing materials like salt,charcoal,watering pipe and earthing pit masonary work including man & materials, making of 6 way and 4 way earth station at tower base and service room for earthing connection to all equipment and boring machine transportation charges

1 job Delivery: 60 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

2 Updates
#1

Update

26-Nov-2025

Extended Deadline

03-Dec-2025, 11:00 am

Opening Date

03-Dec-2025, 11:30 am

#2

Update

19-Nov-2025

Extended Deadline

26-Nov-2025, 11:00 am

Opening Date

26-Nov-2025, 11:30 am

Similar Tenders

5 found
Urgent

Indian Army Prefabricated Living Shelter 6 Men & Electrical Fittings Tender Jammu & Kashmir 2026

Indian Army

📍 JAMMU, JAMMU & KASHMIR

EMD: ₹60,000
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Provn of Prefabricated Store Shelter,PVC insulated cable copper conductor 1 point 5 sqmm in 90 mtr

Indian Army

📍 JAMMU, JAMMU & KASHMIR

EMD: ₹56,000
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

Border Roads Organisation Electrical & Sanitary Goods Tender 2026 BR0 Department of Defence, India – 3 Years Govt Supply, EMD ₹90,000

Border Road Organisation

📍 TINSUKIA, ASSAM

EMD: ₹90,000
⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

20W LED Tube Light 4 inch with base,HRC Fuse Link 100A,Single Pole MCB 16A Board type,Four pole 63

Braithwaite And Company Limited

📍 HOOGHLY, WEST BENGAL

EMD: ₹16,400
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM

Indian Army Prefabricated Shelters & Electrical Accessories Tender Jammu 2026 - IS 550/IS Standards 2024

Indian Army

📍 JAMMU, JAMMU & KASHMIR

EMD: ₹2.4 L
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Chat with us