TenderDekho Logo
Closed GEM

Invitation to Bid - 48 core single mode unarmoured Optical Fiber cable,HDPE Pipe 40mm,Fiber termination box 48 core inc in KAMRUP, ASSAM

Bid Publish Date

02-Jul-2026, 11:10 am

Bid End Date

13-Aug-2026, 2:00 pm

EMD

₹2,00,000

Location

Progress

RA
Issue02-Jul-2026, 11:10 am
Reverse Auction10-Sep-2026, 11:00 am
AwardPending

Public procurement opportunity for Indian Air Force 48 core single mode unarmoured Optical Fiber cable, HDPE Pipe 40mm, Fiber termination box 48 core including splicing charges, LC LC fiber patch cord 2 Mtrs Multi mode, Concrete route indicator including painting and sign writing and installation, Joint enclosure 48 core with splicing charges, RCC chamber with cover 1. 25 Mtrs height, Laying and commissioning, digging and laying ofHDPE Pipes and OFC at a depth of 1. 65 Mtrs through HDD machine, 6 U IP 65 rack with installation, LC SC Patch cord 2 Mtrs Multi mode, CAT VI E CAT VII UTP Patch cord Red Colour, Media convertor Optical to CAT VI Tx and Rx Pairs speed 1 Gbps, SC SC Fiber patch cord 2 Mtrs multi mode, 8 Port gigabit switch splitter, 22 U Rack with installation in KAMRUP, ASSAM. Quantity: 58729 issued by. Submission Deadline: 13-08-2026 14: 00: 00. View full details and respond.

Authority & Contact

Organization

Indian Air Force

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Reverse Auction Schedule

Completed

Start

10-Sep-2026, 11:00 am

End

11-Sep-2026, 12:00 pm

Duration: 25 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

58729

Category

Laying and commissioning, digging and laying ofHDPE Pipes and OFC at a depth of 1.65 Mtrs through HDD machine

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

5 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

50 %

Warranty Period

45 days

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

48 core single mode unarmoured Optical Fiber cable , HDPE Pipe 40mm , Fiber termination box 48 core including splicing charges , LC LC fiber patch cord 2 Mtrs Multi mode , Concrete route indicator including painting and sign writing and installation , Joint enclosure 48 core with splicing charges , RCC chamber with cover 1.25 Mtrs height , Laying and commissioning, digging and laying ofHDPE Pipes and OFC at a depth of 1.65 Mtrs through HDD machine , 6 U IP 65 rack with installation , LC SC Patch cord 2 Mtrs Multi mode , CAT VI E CAT VII UTP Patch cord Red Colour , Media convertor Optical to CAT VI Tx and Rx Pairs speed 1 Gbps , SC SC Fiber patch cord 2 Mtrs multi mode , 8 Port gigabit switch splitter , 22 U Rack with installation

Advisory Bank

State Bank of India

ePBG Percentage

3%

ePBG Duration (Months)

14

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

KAMRUP

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KAMRUPKAMRUP--1900045-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9342339.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

48 core single mode unarmoured Optical Fiber cable

As per attached technical specification document

19,000 mtrs Delivery: 60 days
#2

HDPE Pipe 40mm

As per attached technical specification document

19,000 mtrs Delivery: 60 days
#3

Fiber termination box 48 core including splicing charges

As per attached technical specification document

34 nos Delivery: 60 days
#4

LC LC fiber patch cord 2 Mtrs Multi mode

As per attached technical specification document

30 nos Delivery: 60 days
#5

Concrete route indicator including painting and sign writing and installation

As per attached technical specification document

200 nos Delivery: 60 days
#6

Joint enclosure 48 core with splicing charges

As per attached technical specification document

21 nos Delivery: 60 days
#7

RCC chamber with cover 1.25 Mtrs height

As per attached technical specification document

23 nos Delivery: 60 days
#8

Laying and commissioning, digging and laying ofHDPE Pipes and OFC at a depth of 1.65 Mtrs through HDD machine

As per attached technical specification document

19,000 mtrs Delivery: 60 days
#9

6 U IP 65 rack with installation

As per attached technical specification document

10 nos Delivery: 60 days
#10

LC SC Patch cord 2 Mtrs Multi mode

As per attached technical specification document

100 nos Delivery: 60 days
#11

CAT VI E CAT VII UTP Patch cord Red Colour

As per attached technical specification document

1,220 nos Delivery: 60 days
#12

Media convertor Optical to CAT VI Tx and Rx Pairs speed 1 Gbps

As per attached technical specification document

30 nos Delivery: 60 days
#13

SC SC Fiber patch cord 2 Mtrs multi mode

As per attached technical specification document

30 nos Delivery: 60 days
#14

8 Port gigabit switch splitter

As per attached technical specification document

30 nos Delivery: 60 days
#15

22 U Rack with installation

As per attached technical specification document

1 nos Delivery: 60 days

Categories 21