Bid Publish Date
24-Jul-2026, 11:00 am
Bid End Date
24-Aug-2026, 11:00 am
EMD
₹33,719
Location
Progress
Nuclear Power Corporation Of India Limited invites bids for KIT APC, SWAB SAMPLING ALL MODES, MEMBRANE ASSY KIT, VAPOUR SAMPLING, KIT POWER DIST MOD 4 HR BATTERY, POWER SUPPLY, VERIFICATION STANDARD PEN, NG Vapour Test Assembly, CALIBRANT ASSY, GASKET TEFLON 10 PCS KIT in BULANDSHAHR, UTTAR PRADESH. Quantity: 32. Submission Deadline: 24-08-2026 11: 00: 00. Submit your proposal before the deadline.
Quantity
32
Category
KIT APC
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
7 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
KIT APC , SWAB SAMPLING ALL MODES , MEMBRANE ASSY KIT , VAPOUR SAMPLING , KIT POWER DIST MOD 4 HR BATTERY , POWER SUPPLY , VERIFICATION STANDARD PEN , NG Vapour Test Assembly , CALIBRANT ASSY , GASKET TEFLON 10 PCS KIT
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
20
Payment Timelines
Payments shall be made to the Seller within 10 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
180
Delivery Locations
1
Delivery Cities
NARORA ATOMIC POWER STATION PO NAPP TOWNSHIP NARORA BULANDSHAHR UP
Delivery Pincodes
202389
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Vikram Kumar Mishra | 202389,NARORA ATOMIC POWER STATION PO NAPP TOWNSHIP NARORA BULANDSHAHR UP | NARORA ATOMIC POWER STATION PO NAPP TOWNSHIP NARORA BULANDSHAHR UP | - | 202389 | 5 | 180 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
BOQ
BOQ
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
KIT APC
KIT APC
SWAB SAMPLING ALL MODES
SWAB SAMPLING ALL MODES
MEMBRANE ASSY KIT
MEMBRANE ASSY KIT
VAPOUR SAMPLING
VAPOUR SAMPLING
KIT POWER DIST MOD 4 HR BATTERY
KIT POWER DIST MOD 4 HR BATTERY
POWER SUPPLY
POWER SUPPLY
VERIFICATION STANDARD PEN
VERIFICATION STANDARD PEN
NG Vapour Test Assembly
NG Vapour Test Assembly
CALIBRANT ASSY
CALIBRANT ASSY
GASKET TEFLON 10 PCS KIT
GASKET TEFLON 10 PCS KIT
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | KIT APC | KIT APC | 5 | nos | consignee.naps | 180 | |
| 2 | SWAB SAMPLING ALL MODES | SWAB SAMPLING ALL MODES | 10 | set | consignee.naps | 180 | |
| 3 | MEMBRANE ASSY KIT | MEMBRANE ASSY KIT | 1 | set | consignee.naps | 180 | |
| 4 | VAPOUR SAMPLING | VAPOUR SAMPLING | 2 | set | consignee.naps | 180 | |
| 5 | KIT POWER DIST MOD 4 HR BATTERY | KIT POWER DIST MOD 4 HR BATTERY | 1 | set | consignee.naps | 180 | |
| 6 | POWER SUPPLY | POWER SUPPLY | 1 | nos | consignee.naps | 180 | |
| 7 | VERIFICATION STANDARD PEN | VERIFICATION STANDARD PEN | 5 | set | consignee.naps | 180 | |
| 8 | NG Vapour Test Assembly | NG Vapour Test Assembly | 5 | nos | consignee.naps | 180 | |
| 9 | CALIBRANT ASSY | CALIBRANT ASSY | 1 | nos | consignee.naps | 180 | |
| 10 | GASKET TEFLON 10 PCS KIT | GASKET TEFLON 10 PCS KIT | 1 | set | consignee.naps | 180 |
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer