TenderDekho Logo
GEM

Tender Notice for HIGH TEMPERATURE FURNACE WITH GAS (PROGRAMMABLE DUAL ZONE / SLIDING TUBE FURNACE) FACILITY in HAMIRPUR, HIMACHAL PRADESH

Bid Publish Date

07-Aug-2025, 3:49 pm

Bid End Date

18-Aug-2025, 4:00 pm

Progress

Issue07-Aug-2025, 3:49 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 4

National Institute Of Technology (nit) announces a tender for HIGH TEMPERATURE FURNACE WITH GAS (PROGRAMMABLE DUAL ZONE / SLIDING TUBE FURNACE) FACILITY (Q3) in HAMIRPUR, HIMACHAL PRADESH. Quantity: 1. Submission Deadline: 18-08-2025 16: 00: 00. Last date to apply is approaching fast!

Documents 4

GeM-Bidding-8195884.pdf

Main Document

GeM Category Specification

GEM_CATEGORY_SPECIFICATION

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

High Temperature Tube Furnace with Vacuum and Controlled Gas Flow Facility

International Advanced Research Centre For Powder Metallurgy And New Materials

HYDERABAD, TELANGANA

Posted: 4 March 2025
Closed: 25 March 2025
GEM

Zone tube furnace,Retort furnace

Indian Institute Of Technology (iit)

Posted: 30 January 2025
Closed: 20 February 2025
GEM

High Temperature Tube Furnace

National Institute Of Technology (nit)

Posted: 6 December 2024
Closed: 27 December 2024
GEM

High Temperature Tube Furnace

Council Of Scientific And Industrial Research (csir)

Posted: 22 May 2025
Closed: 13 June 2025
GEM

1800° C High-Temperature Tube Furnace

Indian Institute Of Technology (iit)

Posted: 3 February 2025
Closed: 24 February 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer