Bid Publish Date
02-Nov-2025, 12:48 pm
Bid End Date
12-Nov-2025, 1:00 pm
Location
Progress
Quantity
650
Category
Wood screws
Bid Type
Single Packet Bid
Bhakra Beas Management Board invites bids for procurement of wood screws, tower bolts (ferrous metals) as per IS 204 (Q3), and hydraulically regulated door closers (Q3). The scope is limited to supply of goods, with pre-dispatch inspection arranged and costs for external testing borne by the buyer. The contract includes an option clause allowing quantity adjustments up to 25% during and after award, at contracted rates. Inspection occurs at seller premises or other designated sites, with mandatory 7-day readiness window for inspection notices via email. The warranty/guarantee terms specify a safety window of 12 months from commissioning or 18 months from supply, whichever is earlier. The tender emphasizes delivery timelines linked to original and extended delivery periods and requires adherence to the stated option clause. The procurement is managed by the Bhakra Beas Management Board in India, with a focus on standard ferrous hardware and certified door-closing mechanisms.
Product: Wood screws
Product: Tower bolts (ferrous metals) as per IS 204 (Q3)
Product: Hydraulically regulated door closers (Q3)
Standards: IS 204 (Q3)
Warranty: 12 months from commissioning or 18 months from supply
Option clause allows up to 25% quantity variation at contracted rates
Inspection: pre-dispatch by buyer; external lab charges borne by buyer
Warranty window: 12 months commissioning or 18 months supply; whichever earlier
Scope of supply is limited to supply of goods; payment terms not explicitly stated; bidders should adhere to standard GFR terms and contract-specific provisions
Delivery timelines tied to original and extended periods; additional time computed as (increased quantity ÷ original quantity) × original delivery period, with a minimum 30 days
LDs not detailed in the provided data; pre-dispatch inspection and readiness conditions imply penalties may apply per GTC
Demonstrated ability to supply ferrous hardware to governmental bodies
Compliance with IS 204 (Q3) standards for screws, bolts, and door closers
Financial stability evidenced by audited statements and tax registrations
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Wood screws (Q3) , Tower Bolts (Ferrous Metals) as per IS 204 (Q3) , HYDRAULICALLY REGULATED DOOR CLOSERS (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply of ferrous hardware
Financial statements (last 2-3 years)
EMD/Security deposit documentation (as per bid conditions)
Technical bid documents demonstrating IS 204 (Q3) compliance
OEM authorization letters (if not Manufacturer)
Product catalogues and certification for hydraulic door closers (Q3)
Key insights about HIMACHAL PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, EMD documents, OEM authorizations, and technical compliance evidence for IS 204 (Q3). The bid includes an option to increase quantity by up to 25% and requires pre-dispatch inspection with buyer-funded external labs. Ensure delivery timelines align with original and extended periods.
Required documents include GST certificate, PAN card, experience certificates for ferrous hardware, financial statements, EMD documentation, technical compliance certificates, and OEM authorizations if applicable. Prepare product catalogs showing IS 204 (Q3) compliance for screws, bolts, and hydraulic door closers.
The tender requires IS 204 (Q3) compliance for wood screws and tower bolts, and for hydraulically regulated door closers. Bidders should supply certification documents proving conformity to these standards and include product datasheets and test reports from approved labs.
Delivery follows the original delivery period with possible extension: additional time = (increased quantity ÷ original quantity) × original delivery period, minimum 30 days. The purchaser may extend delivery up to the original period during option exercise; delivery date shifts accordingly.
Materials are guaranteed for 12 months from commissioning or 18 months from supply, whichever occurs earlier. Ensure documentation reflects commissioning date and supply date to determine warranty eligibility and any service obligations.
Pre-dispatch inspection occurs at seller premises or designated site; external labs may conduct testing, with charges borne by the buyer. Seller provides in-house testing facilities at no cost, and the buyer must respond within 7 days of inspection readiness email.
Scope is limited to Only supply of Goods for the listed hardware categories. The bid price must include all cost components, with delivery and inspection arrangements as outlined, and no installation services included unless separately specified.
Yes, if the bidder is not the manufacturer, provide OEM authorization letters. This ensures product conformity to IS 204 (Q3) and enables proper traceability and after-sales support within the procurement framework.
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS