Progress
The Indian Air Force, under the Department of Military Affairs, seeks a supply-only contract for a Static Frequency Converter rated 45 KVA at 208V / 400 Hz / 3-phase. Location for delivery is Sonitpur, Assam 784001. The scope is limited to the supply of goods, with all costs included in the bid price. The ATC emphasizes adherence to the attached technical specification, and there are no BOQ items published. This procurement targets reliable, aviation-grade power conversion equipment compatible with military use.
Product name: Static Frequency Converter
Output: 208V, 400 Hz, 3-phase
Power rating: 45 KVA
Delivery: Supply of goods only (no installation)
Standards/certifications: As per ATC attachment (not publicly listed)
Supply-only contract for SFU (45 KVA) at 208V/400Hz/3F
Conformance to ATC-attached technical specification is mandatory
BOQ empty; focus on technical specification compliance and OEM authorizations
Not specified in data; verify in ATC. Expect standard government terms, e.g., payment within 30-45 days post-delivery
Not specified in data; confirm timeline after bid award; ensure delivery of SFU goods to Sonitpur, Assam
Not specified; verify in ATC for LD rates or performance guarantees tied to delivery and conformance
Eligible bidders must supply aviation/military-grade SFUs and demonstrate capability
Compliance with attached ATC technical specification is mandatory
OEM authorization or approved distributor status may be required
Quantity
3
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
30
OEM Avg. Turnover
75
Past Performance
10 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
STATIC FREQUENCY CONVERTER 208V 400 HZ 3F 45 KVA
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
28
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
SONITPUR
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SONITPUR | SONITPUR | - | - | 3 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar SFU supply (if required by ATC)
Financial statements or turnover details (if requested by ATC)
EMD/Security deposit documents (as per ATC)
Technical bid documents showing compliance with ATC
OEM authorization / dealership certificates (if required by ATC)
Key insights about ASSAM tender market
Bidders must submit GST registration, PAN, OEM authorizations, and technical bid documents as per the ATC. Include EMD/Security deposit if mandated, and experience certificates showing prior SFU supply capability. Ensure conformity with the attached technical specification for 208V/400 Hz/3F 45 KVA.
Review the ATC document attached to the tender; ensure the SFU meets 208V output, 400 Hz, 3-phase, 45 KVA rating, and any OEM or certification requirements. Provide a conformity statement and any test reports or OEM certificates with the bid.
Delivery scope is strictly the supply of goods to Sonitpur, Assam 784001. Installation or commissioning is not included unless stated in the ATC; ensure packaging and transit readiness for defense logistics.
Essential specs include Static Frequency Converter with 208V output, 400 Hz, 3-phase input/output, and a 45 KVA rating. Specific standard codes and testing requirements will be listed in the ATC; bidders must align with those exact standards.
Payment terms are not disclosed in the available data; confirm in ATC. Typical government terms include payment within 30-45 days after delivery and acceptance, subject to submission of required documents.
Demonstrate experience in supplying aviation/military-grade SFUs, provide OEM authorization, and show financial stability. Ensure compliance with IS or BIS-like certifications if specified in the ATC and attach relevant test reports.
The exact deadline is not provided in the data. Bidders should consult the ATC or procurement portal for the final submission date and ensure timely submission with all required documents and conformity evidence.
EMD amount and method are not specified here. Verify in the ATC; typical requirements include a fixed monetary deposit or online payment, ensuring compliance with government procurement norms.