Progress
RAPublic procurement opportunity for Indian Army Blower and motor from the cooling tower with transporting, PVC fill fins for the cooling tower, Propeller shaft for the cooling tower with drive assy, Cleaning of the cooling tower, Supply and fixing for replacement of bush bearing of blower, Gaskets and oil complete in all respects, grade gearbox oil for blower, Electric motor with suitably sized copper conductor, Star delta starter in ERNAKULAM, KERALA. Quantity: 24 issued by. Submission Deadline: 29-08-2026 16: 00: 00. View full details and respond.
Start
01-Sep-2026, 1:00 pm
End
02-Sep-2026, 1:00 pm
Duration: 24 hours
Reverse Auction Document
⏳ RA scheduled. Ensure you are registered to participate.
Quantity
24
Category
Blower and motor from the cooling tower with transporting
Bid Type
Two Packet Bid
Bid Validity
60 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
H1-Highest Priced Bid Elimination
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
5
OEM Avg. Turnover
1
Past Performance
80 %
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Blower and motor from the cooling tower with transporting , PVC fill fins for the cooling tower , Propeller shaft for the cooling tower with drive assy , Cleaning of the cooling tower , Supply and fixing for replacement of bush bearing of blower , Gaskets and oil complete in all respects , grade gearbox oil for blower , Electric motor with suitably sized copper conductor , Star delta starter
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ernakulam
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ernakulam | Ernakulam | - | - | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Blower and motor from the cooling tower with transporting
Labour for dismatling the blower and motor from the cooling tower, transporting the same to the workshop and back and refixing them in their original position after carrying out necessary reparirs, complete in all respects as specified and as directed.
PVC fill fins for the cooling tower
Supply and fixing of PVC fill (fins) for the cooler tower, including removal of damaged fills, proper installation, alignment and securing in position, complete in all respects as specified and as directed.
Propeller shaft for the cooling tower with drive assy
Supply and fixing of propeller shaft for the cooler tower, including aligment with drive assembly, coupling necessary fittings and testing for smooth operation complete in all respects as specified ans as directed.
Cleaning of the cooling tower
M&L for through cleaning fo the cooler tower, includinh removal of scale, sludge and debris and rectification of leakages by welding or other suitable methods as required including surface preparation testing for leaks and rainstatement, complete in all respects as specified and as directed.
Supply and fixing for replacement of bush bearing of blower
Supply and fixing for replacement of bush bearing of blower complete in all respects as specified and as directed.
Gaskets and oil complete in all respects
Supply and fixing for replacment of gaskets and oil seal of blower, complete in all respects as specified and as directed.
grade gearbox oil for blower
Supply and fixing of approved grade gearbox oil for blower including draining of old oil, cleaning of gerabox (if required), fefilling to the recommended level, checking for leakages, and carrying out trial run for proper operation, complete in all respects.
Electric motor with suitably sized copper conductor
M & L for rewinding of an electric motor with suitably sized copper conductor, including dismantling, removal of burnt windings, thorough cleaning of stator sots, insulation work, rewinding, varnishing and baking, reassembly, servicing/replacement of bearings, testing and commissioning, complete in all respects as specified and as directed.
Star delta starter
Dismantling of the existing star-delta starter and supply, installation, testing, and commissioning of a new star-delta starter, including all necessary connections, terminations, and accessories, complete in all respects as specified and as directed.
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Blower and motor from the cooling tower with transporting | Labour for dismatling the blower and motor from the cooling tower, transporting the same to the workshop and back and refixing them in their original position after carrying out necessary reparirs, complete in all respects as specified and as directed. | 2 | each job | ageem2ns | 15 | |
| 2 | PVC fill fins for the cooling tower | Supply and fixing of PVC fill (fins) for the cooler tower, including removal of damaged fills, proper installation, alignment and securing in position, complete in all respects as specified and as directed. | 10 | sqm | ageem2ns | 15 | |
| 3 | Propeller shaft for the cooling tower with drive assy | Supply and fixing of propeller shaft for the cooler tower, including aligment with drive assembly, coupling necessary fittings and testing for smooth operation complete in all respects as specified ans as directed. | 1 | each job | ageem2ns | 15 | |
| 4 | Cleaning of the cooling tower | M&L for through cleaning fo the cooler tower, includinh removal of scale, sludge and debris and rectification of leakages by welding or other suitable methods as required including surface preparation testing for leaks and rainstatement, complete in all respects as specified and as directed. | 2 | each job | ageem2ns | 15 | |
| 5 | Supply and fixing for replacement of bush bearing of blower | Supply and fixing for replacement of bush bearing of blower complete in all respects as specified and as directed. | 2 | each set | ageem2ns | 15 | |
| 6 | Gaskets and oil complete in all respects | Supply and fixing for replacment of gaskets and oil seal of blower, complete in all respects as specified and as directed. | 2 | each set | ageem2ns | 15 | |
| 7 | grade gearbox oil for blower | Supply and fixing of approved grade gearbox oil for blower including draining of old oil, cleaning of gerabox (if required), fefilling to the recommended level, checking for leakages, and carrying out trial run for proper operation, complete in all respects. | 3 | ltr | ageem2ns | 15 | |
| 8 | Electric motor with suitably sized copper conductor | M & L for rewinding of an electric motor with suitably sized copper conductor, including dismantling, removal of burnt windings, thorough cleaning of stator sots, insulation work, rewinding, varnishing and baking, reassembly, servicing/replacement of bearings, testing and commissioning, complete in all respects as specified and as directed. | 1 | job | ageem2ns | 15 | |
| 9 | Star delta starter | Dismantling of the existing star-delta starter and supply, installation, testing, and commissioning of a new star-delta starter, including all necessary connections, terminations, and accessories, complete in all respects as specified and as directed. | 1 | each | ageem2ns | 15 |
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer