TenderDekho Logo
GEM

Government Tender Published for UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6 in PUNE, MAHARASHTRA

Bid Publish Date

18-Dec-2024, 4:17 pm

Bid End Date

31-Dec-2024, 1:00 pm

Generate Docs

Progress

Issue18-Dec-2024, 4:17 pm
Technical15-01-2025 16:24:04
Financial
AwardCompleted
Explore all 4 tabs to view complete tender details

Quantity

13814

Category

UTP Cable

Bid Type

Two Packet Bid

Categories 56

A tender has been published for The Automotive Research Association Of India UTP Cable, Blue UTP cable, Green UTP cable, Faceplate Kit, Surface Mount box, Cat 6 Patch Cords 1, Cat 6 Patch Cords 2, Modular Panel, Cat6 UTP 23AWG, central tube, LC, Face Plate, Front Face Plate Panel, LC Duplex Adapter, RoloSplice Kit, SM Patch Cord, Termination Enclosure Box, 1 inch PVC Casing, 2 inch PVC Casing, 1 Inch PVC Conduit, 2 Inch PVC Conduit, 1 Inch Flexible pipe, 2 Inch Flexible pipe, Metal Flexible pipe, Outdoor HDPE Pipe, poles, trench for cable, CCTV, CCTV 2, Network Rack, Network Rack 2, Network Rack 3, Project Management, UTP Cable 2, Blue UTP cable 2, Green UTP cable 2, Faceplate Kit 2, Surface Mount box 2, Cat 6 Patch Cords 3, Cat 6 Patch Cords 4, Modular Panel 2, Cat6 UTP 2, central tube 2, LC 2, Face Plate 2, Front Face Plate Panel 2, LC Duplex Adapter 2, RoloSplice Kit 2, SM Patch Cord 2, 1 inch PVC Casing 2, 2 inch PVC Casing 2, 1 Inch PVC Conduit 2, 2 Inch PVC Conduit 2, 1 Inch Flexible pipe 2, 2 Inch Flexible pipe 2, Metal Flexible pipe 2, CCTV 3, Network Rack 4, Network Rack 5, Project Management 2, UTP Cable 3, Blue UTP cable 3, Green UTP cable 3, Faceplate Kit 3, Surface Mount box 3, Cat 6 Patch Cords 5, Modular Panel 3, Cat6 UTP 3, 1 inch PVC Casing 3, 2 inch PVC Casing 3, 1 Inch PVC Conduit 3, 2 Inch PVC Conduit 3, 1 Inch Flexible pipe 3, 2 Inch Flexible pipe 3, Metal Flexible pipe 3, Wall Mount Rack 3, Project Management 3, UTP Cable 4, Blue UTP cable 4, Green UTP cable 4, Faceplate Kit 4, Surface Mount box 4, Cat 6 Patch Cords 6, Modular Panel 4, Cat6 UTP 4, central tube 3, LC 3, Face Plate 3, Front Face Plate Panel 3, LC Duplex Adapter 3, RoloSplice Kit 3, SM Patch Cord 3, 1 inch PVC Casing 4, 2 inch PVC Casing 4, 1 Inch PVC Conduit 4, 2 Inch PVC Conduit 4, 1 Inch Flexible pipe 4, 2 Inch Flexible pipe 4, Metal Flexible pipe 4, Outdoor HDPE Pipe 2, poles 2, trench for cable 2, CCTV 4, CCTV 5, Wall Mount Rack 4, Floor Mount Racks, Wall Mount Rack 5, Project Management 4, central tube 4, LC 4, Face Plate 4, Front Face Plate Panel 4, LC Duplex Adapter 4, RoloSplice Kit 4, SM Patch Cord 4, Floor Mount Racks 2, Floor Mount Racks 3, Floor Mount Racks 4, Project Management 5 in PUNE, MAHARASHTRA. Quantity: 13814 by. Submission Deadline: 31-12-2024 13: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

UTP Cable , Blue UTP cable , Green UTP cable , Faceplate Kit , Surface Mount box , Cat 6 Patch Cords 1 , Cat 6 Patch Cords 2 , Modular Panel , Cat6 UTP 23AWG , central tube , LC , Face Plate , Front Face Plate Panel , LC Duplex Adapter , RoloSplice Kit , SM Patch Cord , Termination Enclosure Box , 1 inch PVC Casing , 2 inch PVC Casing , 1 Inch PVC Conduit , 2 Inch PVC Conduit , 1 Inch Flexible pipe , 2 Inch Flexible pipe , Metal Flexible pipe , Outdoor HDPE Pipe , poles , trench for cable , CCTV , CCTV 2 , Network Rack , Network Rack 2 , Network Rack 3 , Project Management , UTP Cable 2 , Blue UTP cable 2 , Green UTP cable 2 , Faceplate Kit 2 , Surface Mount box 2 , Cat 6 Patch Cords 3 , Cat 6 Patch Cords 4 , Modular Panel 2 , Cat6 UTP 2 , central tube 2 , LC 2 , Face Plate 2 , Front Face Plate Panel 2 , LC Duplex Adapter 2 , RoloSplice Kit 2 , SM Patch Cord 2 , 1 inch PVC Casing 2 , 2 inch PVC Casing 2 , 1 Inch PVC Conduit 2 , 2 Inch PVC Conduit 2 , 1 Inch Flexible pipe 2 , 2 Inch Flexible pipe 2 , Metal Flexible pipe 2 , CCTV 3 , Network Rack 4 , Network Rack 5 , Project Management 2 , UTP Cable 3 , Blue UTP cable 3 , Green UTP cable 3 , Faceplate Kit 3 , Surface Mount box 3 , Cat 6 Patch Cords 5 , Modular Panel 3 , Cat6 UTP 3 , 1 inch PVC Casing 3 , 2 inch PVC Casing 3 , 1 Inch PVC Conduit 3 , 2 Inch PVC Conduit 3 , 1 Inch Flexible pipe 3 , 2 Inch Flexible pipe 3 , Metal Flexible pipe 3 , Wall Mount Rack 3 , Project Management 3 , UTP Cable 4 , Blue UTP cable 4 , Green UTP cable 4 , Faceplate Kit 4 , Surface Mount box 4 , Cat 6 Patch Cords 6 , Modular Panel 4 , Cat6 UTP 4 , central tube 3 , LC 3 , Face Plate 3 , Front Face Plate Panel 3 , LC Duplex Adapter 3 , RoloSplice Kit 3 , SM Patch Cord 3 , 1 inch PVC Casing 4 , 2 inch PVC Casing 4 , 1 Inch PVC Conduit 4 , 2 Inch PVC Conduit 4 , 1 Inch Flexible pipe 4 , 2 Inch Flexible pipe 4 , Metal Flexible pipe 4 , Outdoor HDPE Pipe 2 , poles 2 , trench for cable 2 , CCTV 4 , CCTV 5 , Wall Mount Rack 4 , Floor Mount Racks , Wall Mount Rack 5 , Project Management 4 , central tube 4 , LC 4 , Face Plate 4 , Front Face Plate Panel 4 , LC Duplex Adapter 4 , RoloSplice Kit 4 , SM Patch Cord 4 , Floor Mount Racks 2 , Floor Mount Racks 3 , Floor Mount Racks 4 , Project Management 5

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENTTHE AUTOMOTIVE RESEARCH ASSOCIATION OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-7264996.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 121 Items Sign in for GEM prices

#1

UTP Cable

ETL Verified Category 6 U UTP Cable

22 box Delivery: 30 days
#2

Blue UTP cable

Category 6 U UTP Information Outlet Colour Blue

136 nos Delivery: 30 days
#3

Green UTP cable

Category 6 U UTP Information Outlet Colour Green

118 nos Delivery: 30 days
#4

Faceplate Kit

Faceplate Kit universal two ports British Standard style shuttered white

78 nos Delivery: 30 days
#5

Surface Mount box

Surface Mount box for Dual faceplates Local

78 nos Delivery: 30 days
#6

Cat 6 Patch Cords 1

Cat 6 Patch Cords 3 Ft Gray LSZH

156 nos Delivery: 30 days
#7

Cat 6 Patch Cords 2

Cat 6 Patch Cords 7 Ft Gray LSZH

78 nos Delivery: 30 days
#8

Modular Panel

Modular Panel 1U 24 port angled

7 nos Delivery: 30 days
#9

Cat6 UTP 23AWG

Cat6 UTP 23AWG Twisted Pair Armored 305 Mtr

3 box Delivery: 30 days
#10

central tube

Indoor Outdoor gel central tube Armored 12F SM

2,100 mtr Delivery: 30 days
#11

LC

LC SM Pigtail 3 Feet

180 nos Delivery: 30 days
#12

Face Plate

1U Sliding Face Plate shelf Front Face Plate full single Plate type

11 no Delivery: 30 days
#13

Front Face Plate Panel

Front Face Plate Panel Accepts 24 Duplex LC Adapters

11 no Delivery: 30 days
#14

LC Duplex Adapter

LC Duplex Adapter

90 no Delivery: 30 days
#15

RoloSplice Kit

RoloSplice Kit E W 2 Fusion Splice Trays for 1U Shelf for Upto 32 Fusion Splice

15 no Delivery: 30 days
#16

SM Patch Cord

LC LC SM Patch Cord 10 Feet

15 no Delivery: 30 days
#17

Termination Enclosure Box

Fiber Optic Joint Termination Enclosure Box with OFC Splicing Tray

3 nos Delivery: 30 days
#18

1 inch PVC Casing

1 inch PVC Casing N Caping with required accessories like joints

100 mtr Delivery: 30 days
#19

2 inch PVC Casing

2 Inch PVC Casing N Caping with required accessories like joints

200 mtr Delivery: 30 days
#20

1 Inch PVC Conduit

1 Inch PVC Conduit Pipes with required accessories

50 mtr Delivery: 30 days
#21

2 Inch PVC Conduit

2 Inch PVC Conduit Pipes with required accessories

100 mtr Delivery: 30 days
#22

1 Inch Flexible pipe

1 Inch Flexible pipe

30 mtr Delivery: 30 days
#23

2 Inch Flexible pipe

2 Inch Flexible pipe

50 mtr Delivery: 30 days
#24

Metal Flexible pipe

SITC 0.75 Inch Metal Flexible Algi pipe

30 mtr Delivery: 30 days
#25

Outdoor HDPE Pipe

Outdoor HDPE Pipe 32 mm ISI mark with required accessories

100 mtr Delivery: 30 days
#26

poles

Hot dip Galvanised octogonal or Conical Poles 5 Mtr

10 nos Delivery: 30 days
#27

trench for cable

Excavation of trench for cable laying in hard soft soil upto the depth of 300 mm and 400mm width

100 mtr Delivery: 30 days
#28

CCTV

CCTV Outdoor 4 X 4 inch IP65 Waterproof Junction Box with Pole Mounting Kit

1 nos Delivery: 30 days
#29

CCTV 2

CCTV Outdoor 12 X 12 inch IP65 Waterproof Junction Box with Pole Mounting Kit

1 nos Delivery: 30 days
#30

Network Rack

Floor Standing Network Rack

1 nos Delivery: 30 days
#31

Network Rack 2

Outdoor Floor Mount Network Racks Enclosure

4 nos Delivery: 30 days
#32

Network Rack 3

Outdoor Wall or Pole Mounting Network enclosure

3 nos Delivery: 30 days
#33

Project Management

Project Management Installation Testing Commissioning Documentation and Handover Training

1 job Delivery: 30 days
#34

UTP Cable 2

ETL Verified Category 6 U UTP Cable

28 box Delivery: 30 days
#35

Blue UTP cable 2

Category 6 U UTP Information Outlet Colour Blue

154 nos Delivery: 30 days
#36

Green UTP cable 2

Category 6 U UTP Information Outlet Colour Green

154 nos Delivery: 30 days
#37

Faceplate Kit 2

Faceplate Kit universal two ports British Standard style shuttered white

77 nos Delivery: 30 days
#38

Surface Mount box 2

Surface Mount boxfor Dual faceplates Local

77 nos Delivery: 30 days
#39

Cat 6 Patch Cords 3

Cat 6 Patch Cords 3 Ft Gray LSZH

77 nos Delivery: 30 days
#40

Cat 6 Patch Cords 4

Cat 6 Patch Cords 7 Ft Gray LSZH

77 nos Delivery: 30 days
#41

Modular Panel 2

Modular Panel 1U 24 port angled

8 nos Delivery: 30 days
#42

Cat6 UTP 2

Cat6 UTP 23AWG Twisted Pair Armored 305 Mtr

1 box Delivery: 30 days
#43

central tube 2

Indoor Outdoor gel central tube Armored 12F SM

300 mtr Delivery: 30 days
#44

LC 2

LC SM Pigtail 3 Feet

60 nos Delivery: 30 days
#45

Face Plate 2

1U Sliding Face Plate shelf

3 no Delivery: 30 days
#46

Front Face Plate Panel 2

Front Face Plate Panel Accepts 24 Duplex LC Adapters

3 no Delivery: 30 days
#47

LC Duplex Adapter 2

LC Duplex Adapter

30 no Delivery: 30 days
#48

RoloSplice Kit 2

RoloSplice Kit

5 no Delivery: 30 days
#49

SM Patch Cord 2

LC LC SM Patch Cord 10 Feet

5 no Delivery: 30 days
#50

1 inch PVC Casing 2

1 Inch PVC Casing N Caping with required accessories like joints

60 mtr Delivery: 30 days
#51

2 inch PVC Casing 2

2 Inch PVC Casing N Caping with required accessories like joints

60 mtr Delivery: 30 days
#52

1 Inch PVC Conduit 2

1 Inch PVC Conduit Pipes with required accessories

100 mtr Delivery: 30 days
#53

2 Inch PVC Conduit 2

2 Inch PVC Conduit Pipes with required accessories

50 mtr Delivery: 30 days
#54

1 Inch Flexible pipe 2

1 Inch Flexible pipe

60 mtr Delivery: 30 days
#55

2 Inch Flexible pipe 2

2 Inch Flexible pipe

30 mtr Delivery: 30 days
#56

Metal Flexible pipe 2

SITC 0.75 Inch Metal Flexible Algi pipe

30 mtr Delivery: 30 days
#57

CCTV 3

CCTV Outdoor 4 X 4 inch IP65 Waterproof Junction Box with Pole Mounting Kit

1 nos Delivery: 30 days
#58

Network Rack 4

Wall Mount Rack 15U 600W 600D

3 nos Delivery: 30 days
#59

Network Rack 5

Wall Mount Rack 9U 550W 450D

1 nos Delivery: 30 days
#60

Project Management 2

Project Management Installation Testing Commissioning Documentation and Handover Training

1 job Delivery: 30 days
#61

UTP Cable 3

ETL Verified Category 6 U UTP Cable low smoke zero halogen slate jacket 4 pair count 1000 ft length

7 box Delivery: 30 days
#62

Blue UTP cable 3

Category 6 U UTP Information Outlet Colour Blue

48 nos Delivery: 30 days
#63

Green UTP cable 3

Category 6 U UTP Information Outlet Colour Green

48 nos Delivery: 30 days
#64

Faceplate Kit 3

Faceplate Kit universal two ports British Standard style shuttered white

24 nos Delivery: 30 days
#65

Surface Mount box 3

Surface Mount box for Dual faceplates Local

24 nos Delivery: 30 days
#66

Cat 6 Patch Cords 4

Cat 6 Patch Cords 3 Ft Gray LSZH

24 nos Delivery: 30 days
#67

Cat 6 Patch Cords 5

Cat 6 Patch Cords 7 Ft Gray LSZH

24 nos Delivery: 30 days
#68

Modular Panel 3

Modular Panel 1U 24 port angled

2 nos Delivery: 30 days
#69

Cat6 UTP 3

Cat6 UTP 23AWG Twisted Pair Armored 305 Mtr

1 box Delivery: 30 days
#70

1 inch PVC Casing 3

1 Inch PVC Casing N Caping with required accessories like joints

100 mtr Delivery: 30 days
#71

2 inch PVC Casing 3

2 Inch PVC Casing N Caping with required accessories like joints

200 mtr Delivery: 30 days
#72

1 Inch PVC Conduit 3

1 Inch PVC Conduit Pipes with required accessories

50 mtr Delivery: 30 days
#73

2 Inch PVC Conduit 3

2 Inch PVC Conduit Pipes with required accessories

50 mtr Delivery: 30 days
#74

1 Inch Flexible pipe 3

1 Inch Flexible pipe

30 mtr Delivery: 30 days
#75

2 Inch Flexible pipe 3

2 Inch Flexible pipe

30 mtr Delivery: 30 days
#76

Metal Flexible pipe 3

SITC 0.75 Inch Metal Flexible Algi pipe

30 mtr Delivery: 30 days
#77

Wall Mount Rack 3

Wall Mount Rack 15U 600W 600D

1 nos Delivery: 30 days
#78

Project Management 3

Project Management Installation Testing Commissioning Documentation and Handover Training

1 job Delivery: 30 days
#79

UTP Cable 4

ETL Verified Category 6 U UTP Cable low smoke zero halogen slate jacket 4 pair count 1000 ft length

19 box Delivery: 30 days
#80

Blue UTP cable 4

Category 6 U UTP Information Outlet Colour Blue

116 nos Delivery: 30 days
#81

Green UTP cable 4

Category 6 U UTP Information Outlet Colour Green

116 nos Delivery: 30 days
#82

Faceplate Kit 4

Faceplate Kit universal two ports British Standard style shuttered white

58 nos Delivery: 30 days
#83

Surface Mount box 4

Surface Mount box for Dual faceplates Local

58 nos Delivery: 30 days
#84

Cat 6 Patch Cords 5

Cat 6 Patch Cords 3 Ft Gray LSZH

58 nos Delivery: 30 days
#85

Cat 6 Patch Cords 6

Cat 6 Patch Cords 7 Ft Gray LSZH

58 nos Delivery: 30 days
#86

Modular Panel 4

Modular Panel 1U 24 port angled

6 nos Delivery: 30 days
#87

Cat6 UTP 4

Cat6 UTP 23AWG Twisted Pair Armored 305 Mtr

11 box Delivery: 30 days
#88

central tube 3

Indoor Outdoor gel central tube Armored 12F SM

2,100 mtr Delivery: 30 days
#89

LC 3

LC SM Pigtail 3 Feet

144 nos Delivery: 30 days
#90

Face Plate 3

1U Sliding Face Plate shelf

9 no Delivery: 30 days
#91

Front Face Plate Panel 3

Front Face Plate Panel Accepts 24 Duplex LC Adapters

9 no Delivery: 30 days
#92

LC Duplex Adapter 3

LC Duplex Adapter

72 no Delivery: 30 days
#93

RoloSplice Kit 3

RoloSplice Kit E W 2 Fusion Splice Trays, for 1U Shelf

12 no Delivery: 30 days
#94

SM Patch Cord 3

LC LC SM Patch Cord 10 Feet

12 no Delivery: 30 days
#95

1 inch PVC Casing 4

1 Inch PVC Casing N Caping with required accessories like joints.

100 mtr Delivery: 30 days
#96

2 inch PVC Casing 4

2 Inch PVC Casing N Caping with required accessories like joints.

200 mtr Delivery: 30 days
#97

1 Inch PVC Conduit 4

1 Inch PVC Conduit Pipes with required accessories

50 mtr Delivery: 30 days
#98

2 Inch PVC Conduit 4

2 Inch PVC Conduit Pipes with required accessories

100 mtr Delivery: 30 days
#99

1 Inch Flexible pipe 4

1 Inch Flexible pipe

30 mtr Delivery: 30 days
#100

2 Inch Flexible pipe 4

2 Inch Flexible pipe

50 mtr Delivery: 30 days
#101

Metal Flexible pipe 4

SITC 0.75 Inch Metal Flexible Algi pipe

50 mtr Delivery: 30 days
#102

Outdoor HDPE Pipe 2

Outdoor HDPE Pipe 32 mm ISI mark with required accessories

250 mtr Delivery: 30 days
#103

poles 2

Hot dip Galvanised octogonal or Conical Poles-5 Mtr

47 nos Delivery: 30 days
#104

trench for cable 2

Excavation of trench for cable laying in hard soft soil upto the depth of 300 mm and 400mm width

150 mtr Delivery: 30 days
#105

CCTV 4

CCTV Outdoor 4 X 4 inch IP65 Waterproof Junction Box with Pole Mounting Kit

42 nos Delivery: 30 days
#106

CCTV 5

CCTV Outdoor 12 X 12 inch IP65 Waterproof Junction Box with Pole Mounting Kit

5 nos Delivery: 30 days
#107

Wall Mount Rack 4

Wall Mount Rack 15U 600W 600D Basic steel frame

5 nos Delivery: 30 days
#108

Floor Mount Racks

Outdoor Floor Mount Network Racks Enclosure

2 nos Delivery: 30 days
#109

Wall Mount Rack 5

Outdoor Wall or Pole Mounting Network enclosure

4 nos Delivery: 30 days
#110

Project Management 4

Project Management Installation Testing Commissioning Documentation and Handover Training

1 job Delivery: 30 days
#111

central tube 4

Indoor Outdoor gel central tube Armored 12F SM

3,600 mtr Delivery: 30 days
#112

LC 4

LC SM Pigtail 3 Feet

132 nos Delivery: 30 days
#113

Face Plate 4

1U Sliding Face Plate shelf

6 no Delivery: 30 days
#114

Front Face Plate Panel 4

Front Face Plate Panel Accepts 24 Duplex LC Adapters

10 no Delivery: 30 days
#115

LC Duplex Adapter 4

LC Duplex Adapter

66 no Delivery: 30 days
#116

RoloSplice Kit 4

RoloSplice Kit E W 2 Fusion Splice Trays for 1U Shelf

12 no Delivery: 30 days
#117

SM Patch Cord 4

LC LC SM Patch Cord 10 Feet

8 no Delivery: 30 days
#118

Floor Mount Racks 2

Floor Standing Server Rack 42U 1000W 1200D

2 nos Delivery: 30 days
#119

Floor Mount Racks 3

Floor Standing Network Rack 42U 800W 800D Aluminum frame

1 nos Delivery: 30 days
#120

Floor Mount Racks 4

Outdoor Floor Mount Network Racks

1 nos Delivery: 30 days
#121

Project Management 5

Project Management Installation Testing Commissioning Documentation and Handover Training

1 job Delivery: 30 days

Required Documents

1

Experience Criteria

2

Certificate (Requested in ATC)

3

OEM Authorization Certificate

4

Additional Doc 1 (Requested in ATC)

5

Additional Doc 2 (Requested in ATC)

6

Additional Doc 3 (Requested in ATC)

7

Additional Doc 4 (Requested in ATC)

8

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

9

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

5 Updates
#1

Update

13-Jan-2025

Extended Deadline

16-Jan-2025, 3:00 pm

Opening Date

16-Jan-2025, 3:30 pm

#2

Update

10-Jan-2025

Extended Deadline

13-Jan-2025, 12:00 pm

Opening Date

13-Jan-2025, 12:30 pm

#3

Update

06-Jan-2025

Extended Deadline

10-Jan-2025, 12:00 pm

Opening Date

10-Jan-2025, 12:30 pm

#4

Update

30-Dec-2024
#5

Update

30-Dec-2024

Extended Deadline

07-Jan-2025, 3:00 pm

Opening Date

07-Jan-2025, 3:30 pm

Technical Results

S.No Seller Item Date Status
1
HI-TECH FIRE CONTROL SERVICES   Under PMA
-15-01-2025 16:24:04
2
IFIXTURE TECHNOLOGIES PRIVATE LIMITED   Under PMA
-10-01-2025 11:38:07
3
KHUSHI INNOVENTURES PRIVATE LIMITED   Under PMA
-09-01-2025 23:51:51
4
KSMS TECHNOLOGIES SOLUTIONS PRIVATE LIMITED   Under PMA
-15-01-2025 10:04:59
5
LEADING NETWORK SYSTEMS PRIVATE LIMITED   Under PMA
-10-01-2025 11:17:05
6
ORBIT TECHSOL (W) PRIVATE LIMITED   Under PMA
-13-01-2025 11:22:25
7
SCA IT INFRASTRUCTURE PRIVATE LIMITED   Under PMA
-10-01-2025 11:01:35
8
SIGMATIC NETWORKING TECHNOLOGIES PRIVATELIMITED   Under PMA
-10-01-2025 11:55:22
9
TEAM COMPUTERS PVT LTD   Under PMA
-15-01-2025 15:28:02

Financial Results

Rank Seller Price Item
L1
LEADING NETWORK SYSTEMS PRIVATE LIMITED(MII)   Under PMA
Item Categories : UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6
L2
KSMS TECHNOLOGIES SOLUTIONS PRIVATE LIMITED (MSE,MII)( MSE Social Category:General )    Under PMA
Item Categories : UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6
L3
IFIXTURE TECHNOLOGIES PRIVATE LIMITED (MII)( MSE Social Category:OBC )    Under PMA
Item Categories : UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6
L4
ORBIT TECHSOL (W) PRIVATE LIMITED (MII)   Under PMA
Item Categories : UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6
L5
SCA IT INFRASTRUCTURE PRIVATE LIMITED (MII)   Under PMA
Item Categories : UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6
L6
SIGMATIC NETWORKING TECHNOLOGIES PRIVATELIMITED( MSE Social Category:General )    Under PMA
Item Categories : UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6
L7
KHUSHI INNOVENTURES PRIVATE LIMITED   Under PMA
Item Categories : UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6
L8
TEAM COMPUTERS PVT LTD   Under PMA
Item Categories : UTP Cable,Blue UTP cable,Green UTP cable,Faceplate Kit,Surface Mount box,Cat 6 Patch Cords 1,Cat 6

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

What are the eligibility requirements for the tender?

The eligibility requirements include being a registered entity in the relevant field, having prior experience in supplying similar Passive Network Components, maintaining compliance with specified certification requirements, and submitting supporting documentation that demonstrates eligibility.

What certificates are required for the tender?

Bidders must submit several documents, including an OEM Authorization Certificate, compliance with BoQ specifications, and any additional certificates as specified in the ATC. Experience certificates showcasing previous relevant projects are also mandatory.

How can a bidder register for this tender?

To register for the tender, bidders need to create an account on the Gem platform, complete their organizational profile, and submit all required documents specified in the tender. Additionally, ensure you meet all eligibility criteria outlined.

Which document formats are accepted for submission?

Documents can be submitted in standard formats such as PDF, JPEG, and Word. It is crucial that all documents adhere to the required specifications mentioned in the tender to ensure smooth evaluation.

What are the technical specifications of the components needed?

The technical specifications include various products such as Cat 6 UTP cables, faceplate kits, and termination enclosure boxes. Detailed specifications are provided in the attached Bidder’s Document (BoQ) for clarity.

Are there specific quality standards bidders need to follow?

Yes, bidders must comply with the specified industry standards for all components. Quality compliance ensures that Passive Network Components meet the operational requirements necessary for the ADAS Smart City infrastructure.

What compliance requirements should bidders be aware of?

Bidders are required to ensure compliance with technical specifications outlined in the Bidder’s Document and must submit necessary documents proving adherence to local regulations and standards relevant to the Passive Networking Components.

What criteria will be used to evaluate the tender submissions?

The evaluation process consists of total value-wise assessments, focusing on technical compliance, financial proposals, and the overall completeness of submissions. Bidders who meet the stringent requirements will be prioritized.

Is there an Earnest Money Deposit (EMD) requirement for this tender?

Specific details on Earnest Money Deposit (EMD) requirements are outlined in the tender documents. Bidders need to ensure they comply with the specified amount prior to submission.

What performance security is required from successful bidders?

Once selected, bidders may be required to submit a performance security deposit as a guarantee for fulfilling the contract obligations. The exact amount and terms are provided within the tender documents.

How are payment terms structured for this tender?

Payment terms typically involve milestone payments linked to delivery milestones and compliance checks. This structure ensures that funds are released upon the satisfactory completion of specified deliverables.

What are the main key timelines and deadlines for submission?

While the exact timelines are outlined in the tender documents, it is crucial to adhere to submission deadlines and follow all instructions to avoid any disqualification.

What benefits do Micro and Small Enterprises (MSEs) receive in this tender?

MSEs are given preferential treatment in the procurement process, including potential exemptions from certain experience criteria and assistance in understanding the bidding process.

How are startups accommodated in this tender process?

Startups may benefit from provisions designed to support their participation, including flexibility in requirements related to experience and financial thresholds, encouraging new businesses to contribute.

What compliance is required with 'Make in India' policies?

The tender emphasizes compliance with 'Make in India' policies, which aim to encourage local manufacturing and sourcing. Bidders are encouraged to provide components sourced from Indian manufacturers wherever possible.

Are there local content and procurement rules in this tender?

Yes, local content and procurement norms are part of the compliance expectations. Bidders should present evidence of local sourcing as part of their proposal to align with government procurement policies.