Progress
New India Assurance Company Limited invites bids for an Online UPS 10 KVA with Battery conforming to IS 16242 (Part 1). The scope includes Supply, Installation, Testing and Commissioning of the UPS system at Patna, Bihar. Bidders must meet OEM turnover criteria and provide Authorisation from the OEM. The contract contemplates quantity flexibility up to 25% and extended delivery time rules tied to original delivery period, with minimum 30 days. This tender emphasizes OEM turnover compliance and manufacturer authorization to ensure product integrity and service support across the procurement lifecycle.
Key differentiators include the explicit option clause for quantity variation, and the requirement for a complete, end-to-end supply chain including installation and commissioning. The notification targets bidders capable of delivering IS 16242-compliant UPS systems with robust service support structures in the government procurement context. The opportunity is positioned within the Department of Financial Services’ procurement activities in Patna, reflecting a structured, standards-based approach to critical power protection equipment.
Product: Online UPS 10 KVA with Battery
Standard: IS 16242 (Part 1) compliant
Scope: Supply, Installation, Testing and Commissioning (SITC)
Delivery: 25% quantity flex, minimum 30 days extension
Turnover: AI turnover criteria for bidder and OEM; three-year average
OEM Authorization: Required from the original equipment manufacturer
Quantity may be increased by up to 25% during contract; additional time calculated per clause
Must furnish OEM authorization with complete contact details
Bid price must cover SITC; delivery to Patna, Bihar
Turnover criteria require audited statements or CA certificates for last three years
Delivery terms reference the last date of the original delivery order
Warranty/AMC terms aligned with OEM specifications
Bidder must submit OEM authorization detailing name, designation, address, email, and phone.
Purchaser may increase/decrease quantity up to 25% at contracted rates; delivery extension rules apply.
Bid price must include SITC of the UPS system, including installation and commissioning.
Minimum average annual turnover as specified for bidder and OEM over last three years
OEM authorization from the original manufacturer
Experience certificates for similar SITC of UPS systems
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
1
OEM Avg. Turnover
2
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2)
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Patna
Delivery Pincodes
800001
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Baha Oraon | 800001,The New India Assurance Co. Ltd., PATNA REGIONAL OFFICE, 6th & 7th floor, BSFC Building, Fraser Road, Patna - 800001 | Patna | Bihar | 800001 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements for last 3 years or CA certificate showing turnover
OEM authorization letter / Manufacturer Authorization
Technical bid documents showing IS 16242 compliance
Experience certificates supporting turnover and similar projects
Any other documents required by the Terms and Conditions (as applicable)
Key insights about BIHAR tender market
Bidders should ensure IS 16242 (Part 1) compliance, provide OEM authorization, and include SITC costs. Prepare turnover evidence for last 3 years via audited statements or CA certificate, and submit full packaging, delivery, and commissioning plans to meet Patna procurement standards.
Required documents include GST certificate, PAN, last 3 years turnover proof, OEM authorization letter, technical bid showing IS 16242 compliance, and experience certificates for similar UPS SITC projects. Ensure all documents are current and properly signed.
Delivery can be increased up to 25% of bid quantity with rates fixed; additional time is calculated by (increased quantity / original quantity) × original delivery period, minimum 30 days. Delivery begins after the original last date of delivery order.
Both bidder and OEM must meet the minimum average annual turnover over the last three financial years, verified by audited balance sheets or CA certificate. If the bidder/OEM is under 3 years old, turnover is calculated from post-incorporation completion years.
Scope includes Supply, Installation, Testing and Commissioning of the Online UPS 10 KVA with Battery. Price should cover all costs, including shipping, on-site installation, configuration, testing, and commissioning activities.
Mandatory IS 16242 (Part 1) conformance for the UPS system; OEM authorization is required; ensure documentation demonstrates standard compliance and post-installation support as per OEM terms.
Eligibility hinges on turnover proof for three years, valid GST and PAN, OEM authorization, and demonstrated experience in UPS SITC. Ensure all documents align with the tender terms and are submitted with the bid.
Delivery period starts from the last date of the original delivery order; option quantity may extend the period with a minimum 30 days, subject to the contract terms and IS 16242 compliance.