TenderDekho Logo
Closed GEM

Contract Bidding Open For 24 Port L2 Switch with 4 Port Sfp plus,10G SM Transceiver,24 Port LIU Loaded with LC type Pigtail,1 in BANGALORE, KARNATAKA

Bid Publish Date

19-Jun-2026, 12:35 pm

Bid End Date

10-Jul-2026, 12:00 pm

EMD

₹1,75,000

Progress

RA
Issue19-Jun-2026, 12:35 pm
Reverse AuctionCompleted
AwardCompleted

Indian Army invites bids for 24 Port L2 Switch with 4 Port Sfp plus, 10G SM Transceiver, 24 Port LIU Loaded with LC type Pigtail, 12 Port LIU Loaded with LC type Pigtail, LC to LC type patch Pord 2 mtrs, 12 Core Single Mode Fiber Cable, 24 Port Patch Panel, CAT 6 UTP Cable, Patch Cords 1 Mtrs, 1 inch HDPE Pipes, 6U Rack with Accessories and 3 Cable Manager, 24 Port Switches Fixing, 24 Port LIU Loaded with LC type Pigtail Fixing and Splicing, 12 Port LIU Loaded with LC type Pigtail Fixing and Splicing, 12C OFC SM Cable Laying, 24 Port Patch Panel Fixing and Termination, CAT 6 UTP Cable Laying, Quad port Face Plate Fixing, In and out Termination, 6U Rack Fixing and Dressing, Fixing of 1 inch Pvc Pipes, Testing of Points, 48 Port Loaded LIU with Couplers, LC to LC patch cord, 48 Core Single Mode Fiber Cable, OUTDOOR Joint Encloser, SM LC Type Pigtails, Cement Route Markers, 48 Core Single Mode Fiber Cable Laying, Splicing inside Joint Encloser, SM LC Type Pigtails splicing, Cement Route Markers Fixing, Soft Soil Digging and Closing 3 into 2 Feet, Hard Soil Digging and Closing, Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC, Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room in BANGALORE, KARNATAKA. Quantity: 20380. Submission Deadline: 10-07-2026 12: 00: 00. Submit your proposal before the deadline.

Advertisement

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
A3 Mobility   Under PMA
-09-07-2026 20:19:58
2
AAR ESS EXIM PRIVATE LIMITED   Under PMA
-10-07-2026 10:34:22
3
BORA TECHNOVATION PRIVATE LIMITED   Under PMA
-10-07-2026 10:57:03
4
CITO INFOTECH PRIVATE LIMITED   Under PMA
-09-07-2026 20:35:28
5
EK ONKAR ENTERPRISES   Under PMA
-10-07-2026 10:27:26
6
KD ENTERPRISES   Under PMA
-10-07-2026 11:46:03
7
M/S TECHNO PROJECT SOLUTION   Under PMA
-10-07-2026 11:46:13
8
SDH Enterprises   Under PMA
-10-07-2026 11:39:52
9
SHI SOLUTIONS INDIA PRIVATE LIMITED   Under PMA
-10-07-2026 11:58:06
10
TECHSER POWER SOLUTIONS PRIVATE LIMITED   Under PMA
-09-07-2026 21:48:08
11
THEIA TECHNOLOGIES PRIVATE LIMITED   Under PMA
-10-07-2026 11:26:44
12
TIKU ENTERPRISES   Under PMA
-10-07-2026 07:44:26
13
TWILIGHT SYSTEMS TECH PRIVATE LIMITED   Under PMA
-10-07-2026 11:59:45

Reverse Auction Results Final Prices

These are the final prices after the reverse auction event. Prices may be lower than initial bids.

Rank Seller Final Price Item
L1CITO INFOTECH PRIVATE LIMITED(MII)   Under PMA Winner ₹36,99,998Item Categories : 24 Port L2 Switch with 4 Port Sfp plus,10G SM Transceiver,24 Port LIU Loaded with LC type Pigtail,1
L2SHI SOLUTIONS INDIA PRIVATE LIMITED (MII)   Under PMA₹44,33,207Item Categories : 24 Port L2 Switch with 4 Port Sfp plus,10G SM Transceiver,24 Port LIU Loaded with LC type Pigtail,1
L3TECHSER POWER SOLUTIONS PRIVATE LIMITED (MII)   Under PMA₹48,00,080Item Categories : 24 Port L2 Switch with 4 Port Sfp plus,10G SM Transceiver,24 Port LIU Loaded with LC type Pigtail,1

🎉 L1 Winner

CITO INFOTECH PRIVATE LIMITED(MII)   Under PMA

Final Price: ₹36,99,998

Reverse Auction Schedule

Completed

Start

23-Aug-2026, 8:00 pm

End

24-Aug-2026, 8:00 pm

Duration: 24 hours

Reverse Auction Document

✅ RA concluded. Check financial results for final rankings.

Tender Data

Bid Details

Quantity

20380

Category

Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

Yes

Bid Splitting Applied

No

Requirements

Past Performance

30 %

Warranty Period

3 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

24 Port L2 Switch with 4 Port Sfp plus , 10G SM Transceiver , 24 Port LIU Loaded with LC type Pigtail , 12 Port LIU Loaded with LC type Pigtail , LC to LC type patch Pord 2 mtrs , 12 Core Single Mode Fiber Cable , 24 Port Patch Panel , CAT 6 UTP Cable , Patch Cords 1 Mtrs , 1 inch HDPE Pipes , 6U Rack with Accessories and 3 Cable Manager , 24 Port Switches Fixing , 24 Port LIU Loaded with LC type Pigtail Fixing and Splicing , 12 Port LIU Loaded with LC type Pigtail Fixing and Splicing , 12C OFC SM Cable Laying , 24 Port Patch Panel Fixing and Termination , CAT 6 UTP Cable Laying , Quad port Face Plate Fixing , In and out Termination , 6U Rack Fixing and Dressing , Fixing of 1 inch Pvc Pipes , Testing of Points , 48 Port Loaded LIU with Couplers , LC to LC patch cord , 48 Core Single Mode Fiber Cable , OUTDOOR Joint Encloser , SM LC Type Pigtails , Cement Route Markers , 48 Core Single Mode Fiber Cable Laying , Splicing inside Joint Encloser , SM LC Type Pigtails splicing , Cement Route Markers Fixing , Soft Soil Digging and Closing 3 into 2 Feet , Hard Soil Digging and Closing , Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC , Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

38

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

BANGALORE

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-BANGALOREBANGALORE--1030-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT
Advertisement

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9267943.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 39 Items Sign in for GEM prices

#1

24 Port L2 Switch with 4 Port Sfp plus

24 Port L2 Switch with 4 Port Sfp plus

10 nos Delivery: 30 days
#2

10G SM Transceiver

10G SM Transceiver

10 nos Delivery: 30 days
#3

24 Port LIU Loaded with LC type Pigtail

24 Port LIU Loaded with LC type Pigtail

2 nos Delivery: 30 days
#4

12 Port LIU Loaded with LC type Pigtail

12 Port LIU Loaded with LC type Pigtail

4 nos Delivery: 30 days
#5

LC to LC type patch Pord 2 mtrs

LC to LC type patch Pord 2 mtrs

8 nos Delivery: 30 days
#6

12 Core Single Mode Fiber Cable

12 Core Single Mode Fiber Cable

2,500 mtrs Delivery: 30 days
#7

24 Port Patch Panel

24 Port Patch Panel

20 nos Delivery: 30 days
#8

CAT 6 UTP Cable

CAT 6 UTP Cable

50 box Delivery: 30 days
#9

Patch Cords 1 Mtrs

Patch Cords 1 Mtrs

350 nos Delivery: 30 days
#10

1 inch HDPE Pipes

1 inch HDPE Pipes

3,000 mtrs Delivery: 30 days
#11

6U Rack with Accessories and 3 Cable Manager

6U Rack with Accessories and 3 Cable Manager

6 nos Delivery: 30 days
#12

24 Port Switches Fixing

24 Port Switches Fixing

10 nos Delivery: 30 days
#13

24 Port LIU Loaded with LC type Pigtail Fixing and Splicing

24 Port LIU Loaded with LC type Pigtail Fixing and Splicing

2 nos Delivery: 30 days
#14

12 Port LIU Loaded with LC type Pigtail Fixing and Splicing

12 Port LIU Loaded with LC type Pigtail Fixing and Splicing

4 nos Delivery: 30 days
#15

12 Core Single Mode Fiber Cable

12 Core Single Mode Fiber Cable

2,500 mtrs Delivery: 30 days
#16

12C OFC SM Cable Laying

12C OFC SM Cable Laying

800 mtrs Delivery: 30 days
#17

24 Port Patch Panel Fixing and Termination

24 Port Patch Panel Fixing and Termination

20 nos Delivery: 30 days
#18

CAT 6 UTP Cable Laying

CAT 6 UTP Cable Laying

50 box Delivery: 30 days
#19

Quad port Face Plate Fixing

Quad port Face Plate Fixing

350 nos Delivery: 30 days
#20

In and out Termination

In and out Termination

350 nos Delivery: 30 days
#21

6U Rack Fixing and Dressing

6U Rack Fixing and Dressing

6 nos Delivery: 30 days
#22

Fixing of 1 inch Pvc Pipes

Fixing of 1 inch Pvc Pipes

3,000 mtrs Delivery: 30 days
#23

1 inch HDPE Pipes

1 inch HDPE Pipes

3,000 mtrs Delivery: 30 days
#24

Patch Cords 1 Mtrs

Patch Cords 1 Mtrs

350 nos Delivery: 30 days
#25

Testing of Points

Testing of Points

350 mtrs Delivery: 30 days
#26

48 Port Loaded LIU with Couplers

48 Port Loaded LIU with Couplers

3 nos Delivery: 30 days
#27

LC to LC patch cord

LC to LC patch cord

40 nos Delivery: 30 days
#28

48 Core Single Mode Fiber Cable

48 Core Single Mode Fiber Cable

900 mtrs Delivery: 30 days
#29

OUTDOOR Joint Encloser

OUTDOOR Joint Encloser

10 nos Delivery: 30 days
#30

SM LC Type Pigtails

SM LC Type Pigtails

1,000 nos Delivery: 30 days
#31

Cement Route Markers

Cement Route Markers

10 nos Delivery: 30 days
#32

48 Core Single Mode Fiber Cable Laying

48 Core Single Mode Fiber Cable Laying

900 mtrs Delivery: 30 days
#33

Splicing inside Joint Encloser

Splicing inside Joint Encloser

13 nos Delivery: 30 days
#34

SM LC Type Pigtails splicing

SM LC Type Pigtails splicing

500 nos Delivery: 30 days
#35

Cement Route Markers Fixing

Cement Route Markers Fixing

10 nos Delivery: 30 days
#36

Soft Soil Digging and Closing 3 into 2 Feet

Soft Soil Digging and Closing 3 into 2 Feet

190 mtrs Delivery: 30 days
#37

Hard Soil Digging and Closing

Hard Soil Digging and Closing

50 mtrs Delivery: 30 days
#38

Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC

Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC

1 ls Delivery: 30 days
#39

Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room

Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room

1 ls Delivery: 30 days

Categories 26

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

8

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Advertisement