CAT 6 UTP Cable 305 m Grey,Dual Face Plate,Back Box,Category 6 UTP Keystone Jack,24 Port Patch Pane
Indian Army
BANGALORE, KARNATAKA
Progress
Quantity
20380
Category
Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room
Bid Type
Two Packet Bid
Indian Army invites bids for 24 Port L2 Switch with 4 Port Sfp plus, 10G SM Transceiver, 24 Port LIU Loaded with LC type Pigtail, 12 Port LIU Loaded with LC type Pigtail, LC to LC type patch Pord 2 mtrs, 12 Core Single Mode Fiber Cable, 24 Port Patch Panel, CAT 6 UTP Cable, Patch Cords 1 Mtrs, 1 inch HDPE Pipes, 6U Rack with Accessories and 3 Cable Manager, 24 Port Switches Fixing, 24 Port LIU Loaded with LC type Pigtail Fixing and Splicing, 12 Port LIU Loaded with LC type Pigtail Fixing and Splicing, 12C OFC SM Cable Laying, 24 Port Patch Panel Fixing and Termination, CAT 6 UTP Cable Laying, Quad port Face Plate Fixing, In and out Termination, 6U Rack Fixing and Dressing, Fixing of 1 inch Pvc Pipes, Testing of Points, 48 Port Loaded LIU with Couplers, LC to LC patch cord, 48 Core Single Mode Fiber Cable, OUTDOOR Joint Encloser, SM LC Type Pigtails, Cement Route Markers, 48 Core Single Mode Fiber Cable Laying, Splicing inside Joint Encloser, SM LC Type Pigtails splicing, Cement Route Markers Fixing, Soft Soil Digging and Closing 3 into 2 Feet, Hard Soil Digging and Closing, Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC, Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room in BANGALORE, KARNATAKA. Quantity: 20380. Submission Deadline: 10-07-2026 12: 00: 00. Submit your proposal before the deadline.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
24 Port L2 Switch with 4 Port Sfp plus , 10G SM Transceiver , 24 Port LIU Loaded with LC type Pigtail , 12 Port LIU Loaded with LC type Pigtail , LC to LC type patch Pord 2 mtrs , 12 Core Single Mode Fiber Cable , 24 Port Patch Panel , CAT 6 UTP Cable , Patch Cords 1 Mtrs , 1 inch HDPE Pipes , 6U Rack with Accessories and 3 Cable Manager , 24 Port Switches Fixing , 24 Port LIU Loaded with LC type Pigtail Fixing and Splicing , 12 Port LIU Loaded with LC type Pigtail Fixing and Splicing , 12C OFC SM Cable Laying , 24 Port Patch Panel Fixing and Termination , CAT 6 UTP Cable Laying , Quad port Face Plate Fixing , In and out Termination , 6U Rack Fixing and Dressing , Fixing of 1 inch Pvc Pipes , Testing of Points , 48 Port Loaded LIU with Couplers , LC to LC patch cord , 48 Core Single Mode Fiber Cable , OUTDOOR Joint Encloser , SM LC Type Pigtails , Cement Route Markers , 48 Core Single Mode Fiber Cable Laying , Splicing inside Joint Encloser , SM LC Type Pigtails splicing , Cement Route Markers Fixing , Soft Soil Digging and Closing 3 into 2 Feet , Hard Soil Digging and Closing , Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC , Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BANGALORE, KARNATAKA
Indian Army
TIRUVALLUR, TAMIL NADU
Indian Navy
VISAKHAPATNAM, ANDHRA PRADESH
Indian Army
KANCHIPURAM, TAMIL NADU
Indian Air Force
CENTRAL DELHI, DELHI
Tender Results
Loading results...
24 Port L2 Switch with 4 Port Sfp plus
24 Port L2 Switch with 4 Port Sfp plus
10G SM Transceiver
10G SM Transceiver
24 Port LIU Loaded with LC type Pigtail
24 Port LIU Loaded with LC type Pigtail
12 Port LIU Loaded with LC type Pigtail
12 Port LIU Loaded with LC type Pigtail
LC to LC type patch Pord 2 mtrs
LC to LC type patch Pord 2 mtrs
12 Core Single Mode Fiber Cable
12 Core Single Mode Fiber Cable
24 Port Patch Panel
24 Port Patch Panel
CAT 6 UTP Cable
CAT 6 UTP Cable
Patch Cords 1 Mtrs
Patch Cords 1 Mtrs
1 inch HDPE Pipes
1 inch HDPE Pipes
6U Rack with Accessories and 3 Cable Manager
6U Rack with Accessories and 3 Cable Manager
24 Port Switches Fixing
24 Port Switches Fixing
24 Port LIU Loaded with LC type Pigtail Fixing and Splicing
24 Port LIU Loaded with LC type Pigtail Fixing and Splicing
12 Port LIU Loaded with LC type Pigtail Fixing and Splicing
12 Port LIU Loaded with LC type Pigtail Fixing and Splicing
12 Core Single Mode Fiber Cable
12 Core Single Mode Fiber Cable
12C OFC SM Cable Laying
12C OFC SM Cable Laying
24 Port Patch Panel Fixing and Termination
24 Port Patch Panel Fixing and Termination
CAT 6 UTP Cable Laying
CAT 6 UTP Cable Laying
Quad port Face Plate Fixing
Quad port Face Plate Fixing
In and out Termination
In and out Termination
6U Rack Fixing and Dressing
6U Rack Fixing and Dressing
Fixing of 1 inch Pvc Pipes
Fixing of 1 inch Pvc Pipes
1 inch HDPE Pipes
1 inch HDPE Pipes
Patch Cords 1 Mtrs
Patch Cords 1 Mtrs
Testing of Points
Testing of Points
48 Port Loaded LIU with Couplers
48 Port Loaded LIU with Couplers
LC to LC patch cord
LC to LC patch cord
48 Core Single Mode Fiber Cable
48 Core Single Mode Fiber Cable
OUTDOOR Joint Encloser
OUTDOOR Joint Encloser
SM LC Type Pigtails
SM LC Type Pigtails
Cement Route Markers
Cement Route Markers
48 Core Single Mode Fiber Cable Laying
48 Core Single Mode Fiber Cable Laying
Splicing inside Joint Encloser
Splicing inside Joint Encloser
SM LC Type Pigtails splicing
SM LC Type Pigtails splicing
Cement Route Markers Fixing
Cement Route Markers Fixing
Soft Soil Digging and Closing 3 into 2 Feet
Soft Soil Digging and Closing 3 into 2 Feet
Hard Soil Digging and Closing
Hard Soil Digging and Closing
Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC
Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC
Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room
Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 24 Port L2 Switch with 4 Port Sfp plus | 24 Port L2 Switch with 4 Port Sfp plus | 10 | nos | wgcdradp_as3c | 30 | |
| 2 | 10G SM Transceiver | 10G SM Transceiver | 10 | nos | wgcdradp_as3c | 30 | |
| 3 | 24 Port LIU Loaded with LC type Pigtail | 24 Port LIU Loaded with LC type Pigtail | 2 | nos | wgcdradp_as3c | 30 | |
| 4 | 12 Port LIU Loaded with LC type Pigtail | 12 Port LIU Loaded with LC type Pigtail | 4 | nos | wgcdradp_as3c | 30 | |
| 5 | LC to LC type patch Pord 2 mtrs | LC to LC type patch Pord 2 mtrs | 8 | nos | wgcdradp_as3c | 30 | |
| 6 | 12 Core Single Mode Fiber Cable | 12 Core Single Mode Fiber Cable | 2,500 | mtrs | wgcdradp_as3c | 30 | |
| 7 | 24 Port Patch Panel | 24 Port Patch Panel | 20 | nos | wgcdradp_as3c | 30 | |
| 8 | CAT 6 UTP Cable | CAT 6 UTP Cable | 50 | box | wgcdradp_as3c | 30 | |
| 9 | Patch Cords 1 Mtrs | Patch Cords 1 Mtrs | 350 | nos | wgcdradp_as3c | 30 | |
| 10 | 1 inch HDPE Pipes | 1 inch HDPE Pipes | 3,000 | mtrs | wgcdradp_as3c | 30 | |
| 11 | 6U Rack with Accessories and 3 Cable Manager | 6U Rack with Accessories and 3 Cable Manager | 6 | nos | wgcdradp_as3c | 30 | |
| 12 | 24 Port Switches Fixing | 24 Port Switches Fixing | 10 | nos | wgcdradp_as3c | 30 | |
| 13 | 24 Port LIU Loaded with LC type Pigtail Fixing and Splicing | 24 Port LIU Loaded with LC type Pigtail Fixing and Splicing | 2 | nos | wgcdradp_as3c | 30 | |
| 14 | 12 Port LIU Loaded with LC type Pigtail Fixing and Splicing | 12 Port LIU Loaded with LC type Pigtail Fixing and Splicing | 4 | nos | wgcdradp_as3c | 30 | |
| 15 | 12 Core Single Mode Fiber Cable | 12 Core Single Mode Fiber Cable | 2,500 | mtrs | wgcdradp_as3c | 30 | |
| 16 | 12C OFC SM Cable Laying | 12C OFC SM Cable Laying | 800 | mtrs | wgcdradp_as3c | 30 | |
| 17 | 24 Port Patch Panel Fixing and Termination | 24 Port Patch Panel Fixing and Termination | 20 | nos | wgcdradp_as3c | 30 | |
| 18 | CAT 6 UTP Cable Laying | CAT 6 UTP Cable Laying | 50 | box | wgcdradp_as3c | 30 | |
| 19 | Quad port Face Plate Fixing | Quad port Face Plate Fixing | 350 | nos | wgcdradp_as3c | 30 | |
| 20 | In and out Termination | In and out Termination | 350 | nos | wgcdradp_as3c | 30 | |
| 21 | 6U Rack Fixing and Dressing | 6U Rack Fixing and Dressing | 6 | nos | wgcdradp_as3c | 30 | |
| 22 | Fixing of 1 inch Pvc Pipes | Fixing of 1 inch Pvc Pipes | 3,000 | mtrs | wgcdradp_as3c | 30 | |
| 23 | 1 inch HDPE Pipes | 1 inch HDPE Pipes | 3,000 | mtrs | wgcdradp_as3c | 30 | |
| 24 | Patch Cords 1 Mtrs | Patch Cords 1 Mtrs | 350 | nos | wgcdradp_as3c | 30 | |
| 25 | Testing of Points | Testing of Points | 350 | mtrs | wgcdradp_as3c | 30 | |
| 26 | 48 Port Loaded LIU with Couplers | 48 Port Loaded LIU with Couplers | 3 | nos | wgcdradp_as3c | 30 | |
| 27 | LC to LC patch cord | LC to LC patch cord | 40 | nos | wgcdradp_as3c | 30 | |
| 28 | 48 Core Single Mode Fiber Cable | 48 Core Single Mode Fiber Cable | 900 | mtrs | wgcdradp_as3c | 30 | |
| 29 | OUTDOOR Joint Encloser | OUTDOOR Joint Encloser | 10 | nos | wgcdradp_as3c | 30 | |
| 30 | SM LC Type Pigtails | SM LC Type Pigtails | 1,000 | nos | wgcdradp_as3c | 30 | |
| 31 | Cement Route Markers | Cement Route Markers | 10 | nos | wgcdradp_as3c | 30 | |
| 32 | 48 Core Single Mode Fiber Cable Laying | 48 Core Single Mode Fiber Cable Laying | 900 | mtrs | wgcdradp_as3c | 30 | |
| 33 | Splicing inside Joint Encloser | Splicing inside Joint Encloser | 13 | nos | wgcdradp_as3c | 30 | |
| 34 | SM LC Type Pigtails splicing | SM LC Type Pigtails splicing | 500 | nos | wgcdradp_as3c | 30 | |
| 35 | Cement Route Markers Fixing | Cement Route Markers Fixing | 10 | nos | wgcdradp_as3c | 30 | |
| 36 | Soft Soil Digging and Closing 3 into 2 Feet | Soft Soil Digging and Closing 3 into 2 Feet | 190 | mtrs | wgcdradp_as3c | 30 | |
| 37 | Hard Soil Digging and Closing | Hard Soil Digging and Closing | 50 | mtrs | wgcdradp_as3c | 30 | |
| 38 | Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC | Concrete PIT for Joint Encloser Civil Materials SAND Bricks ETC | 1 | ls | wgcdradp_as3c | 30 | |
| 39 | Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room | Shifting Work Rack Switch LIU and other active and Passive component from Bareilly Block to New ADP Server Room | 1 | ls | wgcdradp_as3c | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Hindustan Aeronautics Limited (hal)
📍 BANGALORE, KARNATAKA
Hindustan Aeronautics Limited (hal)
📍 BANGALORE, KARNATAKA
Indian Navy
📍 VISAKHAPATNAM, ANDHRA PRADESH
National Institute Of Technology (nit)
📍 KOZHIKODE, KERALA
N/a
📍 RANCHI, JHARKHAND
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS