Progress
Bharat Petroleum Corporation Ltd in Ernakulam, Kerala seeks a focused study for conversion of ZT03 from external floating roof to internal floating roof and a parallel study for N2 blanketing for YT701-706. The procurement is categorized as a Custom Bid for Services with no BOQ items listed and no explicit estimated value or EMD disclosed. The engagement appears to center on technical assessment, risk analysis, and feasibility input rather than equipment supply. The unique scope combines tank roof conversion with inerting blanket studies, targeting reliable gas blanketing practices for hydrocarbon storage. This opportunity is location-specific, enabling local execution oversight while aligning with BPCL safety and process integrity objectives.
EMD: Not disclosed in tender data
Delivery terms: Not disclosed; ATC may specify timelines
Payment terms: Not disclosed; evaluate in ATC document
Payment terms to be determined per ATC; no explicit amounts or schedules published in available data
Delivery timeline to be defined in ATC; bidders should expect a feasibility/report delivery plan
No penalty details provided; confirm in ATC terms
Engineering consultancy with experience in storage tank roof project feasibility
Ability to perform N2 blanketing studies and process safety assessments
Compliance with BPCL ATC terms and local regulations
Quantity
1
Similar Category
Repair, Maintenance and Installation of Plant/ Systems/Equipments
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
2 Days
EMD Required
No
MII Compliance
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - STUDY FOR CONVERSION OF ZT03 FROM EXTERNAL FLOATING ROOF TANK TO INTERNAL FLOATING ROOF TANK WITH N2 BLANKETING AND STUDY FOR PROVIDING N2 BLANKETING FOR YT701-706
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Pre-Bid Date
17-09-2026 10:00:00
Pre-Bid Venue
BPCL KR AMBALAMUGAL, ERNAKULAM 682 302
Delivery Locations
1
Delivery Cities
Ernakulam
Delivery Pincodes
682302
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Krishna Rao P | 682302,BPCL - KOCHI REFINERY, POST BAG NO.2, AMBALAMUGAL | Ernakulam | Kerala | 682302 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
05-Oct-2026, 9:30 am
Opening Date
06-Oct-2026, 9:30 am
GST registration certificate
PAN card
Experience certificates in storage tank engineering or related feasibility studies
Technical bid/documentation outlining methodology for ZT03 conversion and N2 blanketing study
OEM authorizations or equivalents for any referenced methodologies
Financial statements or proof of financial capability (as required by ATC)
Key insights about KERALA tender market
Bidders should review the ATC document linked by BPCL’s tender page, prepare a feasibility methodology for ZT03 roof conversion and N2 blanketing for YT701-706, and submit the technical bid with required documents (GST, PAN, experience certificates) as per ATC guidelines. Ensure compliance with local Kerala regulations.
Submit GST registration, PAN card, experience certificates in relevant tank projects, financial statements, and the technical bid detailing the proposed methodology for ZT03 conversion and N2 blanketing. Include OEM authorizations if applicable and any ATC-specified forms.
The tender requests a feasibility-oriented study for converting ZT03 from external to internal floating roof, focusing on safety, cost, and implementation feasibility. Specific steelwork, insulation, and inerting process considerations should be addressed, along with a risk assessment and data deliverables per ATC.
The exact deadline is not published in the available data and will be specified in the ATC document linked to the BPCL tender. Bidders should monitor BPCL’s tender portal for the official deadline once the ATC is viewed.
The tender data does not list specific standards; bidders should reference the ATC for any required process safety or gas blanketing norms. Prepare credentials in nitrogen blanketing feasibility, with compliance documentation for BPCL’s internal review.
Prepare a technical bid with methodology, risk assessment, execution plan, and deliverables for ZT03 conversion and N2 blanketing. Attach supporting documents (experience, OEM authorizations) and ensure alignment with ATC instructions. Upload via the BPCL tender portal as directed.
Eligibility includes demonstrated experience in tank feasibility studies or related engineering services, financial capability, GST/PAN validity, and ability to comply with BPCL ATC terms. Submit relevant certifications and prior project references as required by the ATC.