TenderDekho Logo
GEM

Government Tender Published for 245 kV Isolator at allahabad,245 kV Isolator,245 kV Isolator at kanpur,245 kV Isolator,245 kV Isola

Bid Publish Date

25-Jun-2026, 9:36 am

Bid End Date

16-Jul-2026, 11:00 am

Progress

Issue25-Jun-2026, 9:36 am
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

178

Category

245 kV Isolator

Bid Type

Two Packet Bid

Categories 7

Power Grid Corporation Of India Limited has released a public tender for 245 kV Isolator at allahabad, 245 kV Isolator, 245 kV Isolator at kanpur, 245 kV Isolator Spare, 245kV Isolator at rourkela, 245kV Isolator, 245kV Isolator at angul. Quantity: 178. Submission Deadline: 16-07-2026 11: 00: 00. Download documents and apply online.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

245 kV Isolator at allahabad , 245 kV Isolator , 245 kV Isolator at kanpur , 245 kV Isolator Spare , 245kV Isolator at rourkela , 245kV Isolator , 245kV Isolator at angul

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

32

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

03-07-2026 11:00:00

Pre-Bid Venue

onle

Delivery Details

Max Delivery Days

548

Delivery Locations

1

Delivery Cities

Prayagraj

Delivery Pincodes

211008

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sudhanshu Kumar211008,Powergrid Corporation of India Limited, Allahabad Substation, Village-Sarangapur, Post Office-Dhandupur, Rewa Road, Allahabad (Prayagraj), Uttar Pradesh-211008PrayagrajUttar Pradesh21100811548-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9380432.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Supply of 400kV Isolator,Supply of 220kV Isolator,Supply of 220kV Isolator,Supply of 220kV Isolator

Power Grid Corporation Of India Limited

KACHCHH, GUJARAT

Posted: 22 August 2025
Closed: 28 October 2025
GEM

Onload Isolator 11 KV, 630 A,Onload Isolator 33 KV, 800A

Central Coalfields Limited

HAZARIBAG, JHARKHAND

Posted: 9 January 2025
Closed: 4 February 2025
GEM

UPPCL Replacement of 145KV PT & 36KV Isolator Tender Muradnagar Ghaziabad Uttar Pradesh 220 KV Sub-Station 2026

Uttar Pradesh Power Corporation Limited (uppcl)

GHAZIABAD, UTTAR PRADESH

Posted: 18 June 2026
Closed: 29 June 2026
GEM

Repair and Overhauling Service - 132 KV Isolator; 132 KV Isolator; No; Buyer Premises,Repair and Ov

Uttar Pradesh Power Corporation Limited (uppcl)

GAUTAM BUDDHA NAGAR, UTTAR PRADESH

Posted: 17 February 2025
Closed: 28 February 2025
GEM

Bids are Invited For Supply, erection, testing and commissioning of 33KV VCB and Isolators at 220KV S/s, Pantnagar under 220KV OandM Division, PTCUL, Pantnagar in NAINITAL, UTTARAKHAND

N/A

NAINITAL, UTTARAKHAND

Posted: 20 December 2024
Closed: 18 January 2025
EPROCURE

Bill of Quantities (BOQ) 32 Items Sign in for GEM prices

#1

245 kV Isolator at allahabad

Supply of 245kV,1600 A, 50kA, 3-Ph,DBR isolator (Without Supporting structure) Without Earth switch - Tandem - with support insulator Including terminal Connector

11 set Delivery: 548 days
#2

245 kV Isolator

Retrofitment of 245kV,1600 A, 50kA, 3-Ph,DBR isolator (Without Supporting structure) Without Earth switch - Tandem - with support insulator Including terminal Connector

11 set Delivery: 548 days
#3

245 kV Isolator at kanpur

Supply of 245kV, 1600 A, 50kA, 3-Ph, DBR isolator(Without Supporting structure) Without Earth switch - Tandem - with support insulator Including terminal Connector

17 set Delivery: 548 days
#4

245 kV Isolator

Retrofitment of 245kV, 1600 A, 50kA, 3-Ph, DBR isolator(Without Supporting structure) Without Earth switch - Tandem - with support insulator Including terminal Connector

17 set Delivery: 548 days
#5

245 kV Isolator

Supply of 245kV,1600 A, 50kA, 3-Ph, DBR isolator (Without Supporting structure) With One Earth Switch with support insulator & terminal Connector

6 set Delivery: 548 days
#6

245 kV Isolator

Retrofitment of 245kV,1600 A, 50kA, 3-Ph, DBR isolator (Without Supporting structure) With One Earth Switch with support insulator & terminal Connector

6 set Delivery: 548 days
#7

245 kV Isolator

Supply of 245kV, 1600 A, 50kA , 3-Ph, DBR isolator ,(Without Supporting structure) with One Earth Switch with support insulator & terminal Connector

9 set Delivery: 548 days
#8

245 kV Isolator

Retrofitment of 245kV, 1600 A, 50kA , 3-Ph, DBR isolator ,(Without Supporting structure) with One Earth Switch with support insulator & terminal Connector

9 set Delivery: 548 days
#9

245 kV Isolator

Supply of 245kV, 1600 A,50kA ,3-Ph DBR isolator (Without Supporting structure) With Two Earth Switch with support insulator & terminal Connector

6 set Delivery: 548 days
#10

245 kV Isolator

Retrofitment of 245kV, 1600 A,50kA ,3-Ph DBR isolator (Without Supporting structure) With Two Earth Switch with support insulator & terminal Connector

6 set Delivery: 548 days
#11

245 kV Isolator

Supply of 245kV, 1600 A, 50kA, 3-Ph DBR isolator, (Without Supporting structure) With Two Earth Switch with support insulator & terminal Connector

9 set Delivery: 548 days
#12

245 kV Isolator

Retrofitment of 245kV, 1600 A, 50kA, 3-Ph DBR isolator, (Without Supporting structure) With Two Earth Switch with support insulator & terminal Connector

9 set Delivery: 548 days
#13

245 kV Isolator

Supply of 245kV, 2500A,50kA,3-Ph , DBR isolator , (Without Supporting structure) With Two Earth Switch with support insulator & terminal Connector

2 set Delivery: 548 days
#14

245 kV Isolator

Retrofitment of 245kV, 2500A,50kA,3-Ph , DBR isolator , (Without Supporting structure) With Two Earth Switch with support insulator & terminal Connector

2 set Delivery: 548 days
#15

245 kV Isolator

Supply of 245kV,2500 A, 50kA ,3-Ph DBR isolator , (Without Supporting structure) With Two Earth Switch with support insulator & terminal Connector

2 set Delivery: 548 days
#16

245 kV Isolator

Retrofitment of 245kV,2500 A, 50kA ,3-Ph DBR isolator , (Without Supporting structure) With Two Earth Switch with support insulator & terminal Connector

2 set Delivery: 548 days
#17

245 kV Isolator Spare

Supply of 245kV DBR Isolator 245kV , 2500A, 50 kA - One complete pole with 2 E/S along with Operating Mechanism & support insulator for Main Isolator and Earth Switch Including Terminal Connectors, and excluding Supporting Structure. With Bus Transfer Switching Duty

1 set Delivery: 548 days
#18

245 kV Isolator Spare

Supply of 245kV DBR Isolator 2500A,50 kA - One complete pole with 2 E/S along with Operating Mechanism & support insulator for Main Isolator and Earth Switch including Terminal Connectors and excluding Supporting Structure.With Bus Transfer Switching Duty

1 set Delivery: 548 days
#19

245 kV Isolator Spare

Supply of 245kV DBR Isolator 1600A,50 kA - One complete pole with 2 E/S along with Operating Mechanism & support insulator for Main Isolator and Earth Switch Including Terminal Connectors, and excluding Supporting Structure. With Bus Transfer Switching Duty

1 set Delivery: 548 days
#20

245 kV Isolator Spare

Supply of 245kV DBR Isolator 1600A,50 kA - One complete pole with 2 E/S along with Operating Mechanism & support insulator for Main Isolator and Earth Switch Including Terminal Connectors, excluding Supporting Structure. ( With Bus Transfer Switching Duty

1 set Delivery: 548 days
#21

245kV Isolator at rourkela

Supply of 245 kV ,2500 A,50 kA,3ph DBR Isolator with One Earth switch along with support insulator,structure & terminal connectors

5 no Delivery: 548 days
#22

245kV Isolator

Retrofitment of 245 kV ,2500 A,50 kA,3ph DBR Isolator with One Earth switch along with support insulator,structure & terminal connectors

5 no Delivery: 548 days
#23

245kV Isolator

Supply of 245 kV ,2500 A,50 kA,3ph DBR Isolator with Two Earth switch along with support insulator,structure&terminal connectors

7 no Delivery: 548 days
#24

245kV Isolator

Retrofitment of 245 kV ,2500 A,50 kA,3ph DBR Isolator with Two Earth switch along with support insulator,structure&terminal connectors

7 no Delivery: 548 days
#25

245kV Isolator

Supply of 245 kV ,2500 A,50 kA,3ph DBR Isolator without Earth switch(Tandem) along with support insulator, structure& terminal connectors

9 no Delivery: 548 days
#26

245kV Isolator

Retrofitment of 245 kV ,2500 A,50 kA,3ph DBR Isolator without Earth switch(Tandem) along with support insulator, structure& terminal connectors

9 no Delivery: 548 days
#27

245kV Isolator at angul

Supply of 245 kV ,2500 A,50 kA,3ph Isolator Double break with One Earth switch along with support insulator,structure&terminal connectors

1 no Delivery: 548 days
#28

245kV Isolator

Retrofitment of 245 kV ,2500 A,50 kA,3ph Isolator Double break with One Earth switch along with support insulator,structure&terminal connectors

1 no Delivery: 548 days
#29

245kV Isolator

Supply of 245 kV ,2500 A,50 kA,3ph DBR Isolator with Two Earth switch along with support insulator,structure&terminal connectors

1 no Delivery: 548 days
#30

245kV Isolator

Retrofitment of 245 kV ,2500 A,50 kA,3ph DBR Isolator with Two Earth switch along with support insulator,structure&terminal connectors

1 no Delivery: 548 days
#31

245kV Isolator

Supply of 245 kV ,2500 A,50 kA,3ph DBR Isolator without Earth switch(Tandem)along with support insulator,structure&terminal connectors

2 no Delivery: 548 days
#32

245kV Isolator

Retrofitment of 245 kV ,2500 A,50 kA,3ph DBR Isolator without Earth switch(Tandem)along with support insulator,structure&terminal connectors

2 no Delivery: 548 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Bidder Turnover

3

Certificate (Requested in ATC)

4

OEM Authorization Certificate

5

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

6

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Similar Tenders

5 found
Urgent

Invitation to Bid - Procurement of 132kV Isolator in 24 PARAGANAS NORTH, WEST BENGAL

WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED

📍 24 PARAGANAS NORTH, WEST BENGAL

EMD: ₹1.8 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View EPROCURE
Urgent

Invitation to Bid - Procurement of 132kV Isolator in 24 PARAGANAS NORTH, WEST BENGAL

WEST BENGAL STATE ELECTRICITY TRANSMISSION COMPANY LIMITED

📍 24 PARAGANAS NORTH, WEST BENGAL

EMD: ₹9.6 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View EPROCURE
Urgent

245 kV Current Transformer,245 kV CVT ( Capacitive Voltage Transformer),145 kV Current Transformer

N/a

📍 CHAMPAWAT, UTTARAKHAND

Est: ₹1.4 Cr
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

33 KV Bus Isolator 800 Amp.

Uttar Pradesh Power Corporation Limited (uppcl)

📍 AGRA, UTTAR PRADESH

EMD: ₹59,500
⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

420 kV Circuit Breaker at Kishenpur, NR II region,420 kV Circuit Breaker at Malerkotla, NR II regio

Power Grid Corporation Of India Limited

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM