TenderDekho Logo
Active GEM

Open Tender for Supply of 24 port POE Manageable Switch,Supply of Distribution Switch,Supply of Independeent Wifi A in GULBARGA, KARNATAKA

Bid Publish Date

27-Aug-2026, 5:30 pm

Bid End Date

11-Sep-2026, 6:00 pm

EMD

₹1,68,859

Value

₹85,52,955

Progress

Issue27-Aug-2026, 5:30 pm
Corrigendum31-Aug-2026
AwardPending

Airports Authority Of India announces a tender for Supply of 24 port POE Manageable Switch, Supply of Distribution Switch, Supply of Independeent Wifi Access Point WAP, Supply of Cat6 UTP Cable, Supply of 6Core Armoured OFC Cable, Supply of 24 port Copper Patch Panel, Supply of 12 core Fiber Patch Panel Fully Loaded, Supply of 10G SFP Transceiver for access and distribution switch, supply of 1meter OFC Patch Cord, Supply of 3 meter UTP Patch Cord, Supply of 1 meter UTP Patch Cord, Supply of 15 U Rack for IT Hub Rooms, Supply of 32U Rack for IT Server Room, Supply of 1 KVA UPS for IT Hub Rooms, Supply of 3 KVA UPS for IT Server Room, Supply of IO Box with faceplate and RJ 45 Jack, Supply of ISO marked HDPE PIPE for laying OFC Cable, Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable, Supply of ISO Marked 25 mm PVC Capping or Casing, Supply of GI Pipe for OFC Laying while road crossing, Installation and Configuration of 24 port POE Switch, Installation and Configuration of Distribution Switch, Installation and configuration of Wifi Access Point, Laying of CAT6 UTP Cable as per the site conditions, Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable, Laying of OFC Cable with HDPE pipe as per site conditions, Fixing or laying of HDPE Pipe as per the site conditions, Fixing of GI Pipe under the road as per the site conditions while crossing the Road, Fixing of 24 port Copper Patch Panel and labelling the ports, Fixing of 12 core OFC Patch Panel and labeling the cable, Fixing of 15U Rack Wall Mounting or as per the site conditions, Splicing of OFC Cores, ODTR test Reports for OFC, Fluke Meter Test Report for all the data points in GULBARGA, KARNATAKA. Quantity: 18213. Submission Deadline: 11-09-2026 18: 00: 00. Last date to apply is approaching fast!

Tender Data

Bid Details

Quantity

18213

Category

Supply of 24 port POE Manageable Switch

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

Yes

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

26

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of 24 port POE Manageable Switch , Supply of Distribution Switch , Supply of Independeent Wifi Access Point WAP , Supply of Cat6 UTP Cable , Supply of 6Core Armoured OFC Cable , Supply of 24 port Copper Patch Panel , Supply of 12 core Fiber Patch Panel Fully Loaded , Supply of 10G SFP Transceiver for access and distribution switch , supply of 1meter OFC Patch Cord , Supply of 3 meter UTP Patch Cord , Supply of 1 meter UTP Patch Cord , Supply of 15 U Rack for IT Hub Rooms , Supply of 32U Rack for IT Server Room , Supply of 1 KVA UPS for IT Hub Rooms , Supply of 3 KVA UPS for IT Server Room , Supply of IO Box with faceplate and RJ 45 Jack , Supply of ISO marked HDPE PIPE for laying OFC Cable , Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable , Supply of ISO Marked 25 mm PVC Capping or Casing , Supply of GI Pipe for OFC Laying while road crossing , Installation and Configuration of 24 port POE Switch , Installation and Configuration of Distribution Switch , Installation and configuration of Wifi Access Point , Laying of CAT6 UTP Cable as per the site conditions , Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable , Laying of OFC Cable with HDPE pipe as per site conditions , Fixing or laying of HDPE Pipe as per the site conditions , Fixing of GI Pipe under the road as per the site conditions while crossing the Road , Fixing of 24 port Copper Patch Panel and labelling the ports , Fixing of 12 core OFC Patch Panel and labeling the cable , Fixing of 15U Rack Wall Mounting or as per the site conditions , Splicing of OFC Cores , ODTR test Reports for OFC , Fluke Meter Test Report for all the data points

Advisory Bank

ICICI

ePBG Percentage

5%

ePBG Duration (Months)

39

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

60

Delivery Locations

1

Delivery Cities

Kalaburagi

Delivery Pincodes

585103

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Kumara Swamy S585103,Officer In Charge,AAI,ACS Gulbarga,Biddappur Colony,High Court(opp),Gulabarga - 585103KalaburagiKarnataka5851031060-

Authority Records

MINISTRY OF CIVIL AVIATIONAIRPORTS AUTHORITY OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9814776.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Rhq Sr Chennai

Grievance Contact

[email protected]

Corrigendum Updates

1 Update
#1

Update

31-Aug-2026

Bill of Quantities (BOQ) 34 Items Sign in for GEM prices

#1

Supply of 24 port POE Manageable Switch

Supply of 24 port POE Manageable Switch

10 number Delivery: 60 days
#2

Supply of Distribution Switch

Supply of Distribution Switch

1 number Delivery: 60 days
#3

Supply of Independeent Wifi Access Point WAP

Supply of Independeent Wifi Access Point WAP

9 number Delivery: 60 days
#4

Supply of Cat6 UTP Cable

Supply of Cat6 UTP Cable

4,920 meters Delivery: 60 days
#5

Supply of 6Core Armoured OFC Cable

Supply of 6Core Armoured OFC Cable

1,450 meters Delivery: 60 days
#6

Supply of 24 port Copper Patch Panel

Supply of 24 port Copper Patch Panel

10 number Delivery: 60 days
#7

Supply of 12 core Fiber Patch Panel Fully Loaded

Supply of 12 core Fiber Patch Panel Fully Loaded

11 number Delivery: 60 days
#8

Supply of 10G SFP Transceiver for access and distribution switch

Supply of 10G SFP Transceiver for access and distribution switch

24 number Delivery: 60 days
#9

supply of 1meter OFC Patch Cord

supply of 1meter OFC Patch Cord

24 number Delivery: 60 days
#10

Supply of 3 meter UTP Patch Cord

Supply of 3 meter UTP Patch Cord

82 number Delivery: 60 days
#11

Supply of 1 meter UTP Patch Cord

Supply of 1 meter UTP Patch Cord

82 number Delivery: 60 days
#12

Supply of 15 U Rack for IT Hub Rooms

Supply of 15 U Rack for IT Hub Rooms

9 number Delivery: 60 days
#13

Supply of 32U Rack for IT Server Room

Supply of 32U Rack for IT Server Room

1 number Delivery: 60 days
#14

Supply of 1 KVA UPS for IT Hub Rooms

Supply of 1 KVA UPS for IT Hub Rooms

9 number Delivery: 60 days
#15

Supply of 3 KVA UPS for IT Server Room

Supply of 3 KVA UPS for IT Server Room

1 number Delivery: 60 days
#16

Supply of IO Box with faceplate and RJ 45 Jack

Supply of IO Box with faceplate and RJ 45 Jack

82 number Delivery: 60 days
#17

Supply of ISO marked HDPE PIPE for laying OFC Cable

Supply of ISO marked HDPE PIPE for laying OFC Cable

725 meters Delivery: 60 days
#18

Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable

Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable

1,312 meters Delivery: 60 days
#19

Supply of ISO Marked 25 mm PVC Capping or Casing

Supply of ISO Marked 25 mm PVC Capping or Casing

328 meters Delivery: 60 days
#20

Supply of GI Pipe for OFC Laying while road crossing

Supply of GI Pipe for OFC Laying while road crossing

20 meters Delivery: 60 days
#21

Installation and Configuration of 24 port POE Switch

Installation and Configuration of 24 port POE Switch

10 number Delivery: 60 days
#22

Installation and Configuration of Distribution Switch

Installation and Configuration of Distribution Switch

1 number Delivery: 60 days
#23

Installation and configuration of Wifi Access Point

Installation and configuration of Wifi Access Point

9 number Delivery: 60 days
#24

Laying of CAT6 UTP Cable as per the site conditions

Laying of CAT6 UTP Cable as per the site conditions

4,920 meter Delivery: 60 days
#25

Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable

Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable

1,640 meter Delivery: 60 days
#26

Laying of OFC Cable with HDPE pipe as per site conditions

Laying of OFC Cable with HDPE pipe as per site conditions

1,450 meter Delivery: 60 days
#27

Fixing or laying of HDPE Pipe as per the site conditions

Fixing or laying of HDPE Pipe as per the site conditions

725 meter Delivery: 60 days
#28

Fixing of GI Pipe under the road as per the site conditions while crossing the Road

Fixing of GI Pipe under the road as per the site conditions while crossing the Road

20 meter Delivery: 60 days
#29

Fixing of 24 port Copper Patch Panel and labelling the ports

Fixing of 24 port Copper Patch Panel and labelling the ports

10 number Delivery: 60 days
#30

Fixing of 12 core OFC Patch Panel and labeling the cable

Fixing of 12 core OFC Patch Panel and labeling the cable

11 number Delivery: 60 days
#31

Fixing of 15U Rack Wall Mounting or as per the site conditions

Fixing of 15U Rack Wall Mounting or as per the site conditions

9 number Delivery: 60 days
#32

Splicing of OFC Cores

Splicing of OFC Cores

144 cores Delivery: 60 days
#33

ODTR test Reports for OFC

ODTR test Reports for OFC

72 cores Delivery: 60 days
#34

Fluke Meter Test Report for all the data points

Fluke Meter Test Report for all the data points

82 number Delivery: 60 days

Categories 53

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

Additional Doc 1 (Requested in ATC)

7

Additional Doc 2 (Requested in ATC)

8

Additional Doc 3 (Requested in ATC)

9

Additional Doc 4 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer