Bid Publish Date
27-Aug-2026, 5:30 pm
Bid End Date
11-Sep-2026, 6:00 pm
EMD
₹1,68,859
Value
₹85,52,955
Location
Progress
Airports Authority Of India announces a tender for Supply of 24 port POE Manageable Switch, Supply of Distribution Switch, Supply of Independeent Wifi Access Point WAP, Supply of Cat6 UTP Cable, Supply of 6Core Armoured OFC Cable, Supply of 24 port Copper Patch Panel, Supply of 12 core Fiber Patch Panel Fully Loaded, Supply of 10G SFP Transceiver for access and distribution switch, supply of 1meter OFC Patch Cord, Supply of 3 meter UTP Patch Cord, Supply of 1 meter UTP Patch Cord, Supply of 15 U Rack for IT Hub Rooms, Supply of 32U Rack for IT Server Room, Supply of 1 KVA UPS for IT Hub Rooms, Supply of 3 KVA UPS for IT Server Room, Supply of IO Box with faceplate and RJ 45 Jack, Supply of ISO marked HDPE PIPE for laying OFC Cable, Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable, Supply of ISO Marked 25 mm PVC Capping or Casing, Supply of GI Pipe for OFC Laying while road crossing, Installation and Configuration of 24 port POE Switch, Installation and Configuration of Distribution Switch, Installation and configuration of Wifi Access Point, Laying of CAT6 UTP Cable as per the site conditions, Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable, Laying of OFC Cable with HDPE pipe as per site conditions, Fixing or laying of HDPE Pipe as per the site conditions, Fixing of GI Pipe under the road as per the site conditions while crossing the Road, Fixing of 24 port Copper Patch Panel and labelling the ports, Fixing of 12 core OFC Patch Panel and labeling the cable, Fixing of 15U Rack Wall Mounting or as per the site conditions, Splicing of OFC Cores, ODTR test Reports for OFC, Fluke Meter Test Report for all the data points in GULBARGA, KARNATAKA. Quantity: 18213. Submission Deadline: 11-09-2026 18: 00: 00. Last date to apply is approaching fast!
Quantity
18213
Category
Supply of 24 port POE Manageable Switch
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
26
Past Performance
80 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Supply of 24 port POE Manageable Switch , Supply of Distribution Switch , Supply of Independeent Wifi Access Point WAP , Supply of Cat6 UTP Cable , Supply of 6Core Armoured OFC Cable , Supply of 24 port Copper Patch Panel , Supply of 12 core Fiber Patch Panel Fully Loaded , Supply of 10G SFP Transceiver for access and distribution switch , supply of 1meter OFC Patch Cord , Supply of 3 meter UTP Patch Cord , Supply of 1 meter UTP Patch Cord , Supply of 15 U Rack for IT Hub Rooms , Supply of 32U Rack for IT Server Room , Supply of 1 KVA UPS for IT Hub Rooms , Supply of 3 KVA UPS for IT Server Room , Supply of IO Box with faceplate and RJ 45 Jack , Supply of ISO marked HDPE PIPE for laying OFC Cable , Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable , Supply of ISO Marked 25 mm PVC Capping or Casing , Supply of GI Pipe for OFC Laying while road crossing , Installation and Configuration of 24 port POE Switch , Installation and Configuration of Distribution Switch , Installation and configuration of Wifi Access Point , Laying of CAT6 UTP Cable as per the site conditions , Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable , Laying of OFC Cable with HDPE pipe as per site conditions , Fixing or laying of HDPE Pipe as per the site conditions , Fixing of GI Pipe under the road as per the site conditions while crossing the Road , Fixing of 24 port Copper Patch Panel and labelling the ports , Fixing of 12 core OFC Patch Panel and labeling the cable , Fixing of 15U Rack Wall Mounting or as per the site conditions , Splicing of OFC Cores , ODTR test Reports for OFC , Fluke Meter Test Report for all the data points
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
39
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Kalaburagi
Delivery Pincodes
585103
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Kumara Swamy S | 585103,Officer In Charge,AAI,ACS Gulbarga,Biddappur Colony,High Court(opp),Gulabarga - 585103 | Kalaburagi | Karnataka | 585103 | 10 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Supply of 24 port POE Manageable Switch
Supply of 24 port POE Manageable Switch
Supply of Distribution Switch
Supply of Distribution Switch
Supply of Independeent Wifi Access Point WAP
Supply of Independeent Wifi Access Point WAP
Supply of Cat6 UTP Cable
Supply of Cat6 UTP Cable
Supply of 6Core Armoured OFC Cable
Supply of 6Core Armoured OFC Cable
Supply of 24 port Copper Patch Panel
Supply of 24 port Copper Patch Panel
Supply of 12 core Fiber Patch Panel Fully Loaded
Supply of 12 core Fiber Patch Panel Fully Loaded
Supply of 10G SFP Transceiver for access and distribution switch
Supply of 10G SFP Transceiver for access and distribution switch
supply of 1meter OFC Patch Cord
supply of 1meter OFC Patch Cord
Supply of 3 meter UTP Patch Cord
Supply of 3 meter UTP Patch Cord
Supply of 1 meter UTP Patch Cord
Supply of 1 meter UTP Patch Cord
Supply of 15 U Rack for IT Hub Rooms
Supply of 15 U Rack for IT Hub Rooms
Supply of 32U Rack for IT Server Room
Supply of 32U Rack for IT Server Room
Supply of 1 KVA UPS for IT Hub Rooms
Supply of 1 KVA UPS for IT Hub Rooms
Supply of 3 KVA UPS for IT Server Room
Supply of 3 KVA UPS for IT Server Room
Supply of IO Box with faceplate and RJ 45 Jack
Supply of IO Box with faceplate and RJ 45 Jack
Supply of ISO marked HDPE PIPE for laying OFC Cable
Supply of ISO marked HDPE PIPE for laying OFC Cable
Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable
Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable
Supply of ISO Marked 25 mm PVC Capping or Casing
Supply of ISO Marked 25 mm PVC Capping or Casing
Supply of GI Pipe for OFC Laying while road crossing
Supply of GI Pipe for OFC Laying while road crossing
Installation and Configuration of 24 port POE Switch
Installation and Configuration of 24 port POE Switch
Installation and Configuration of Distribution Switch
Installation and Configuration of Distribution Switch
Installation and configuration of Wifi Access Point
Installation and configuration of Wifi Access Point
Laying of CAT6 UTP Cable as per the site conditions
Laying of CAT6 UTP Cable as per the site conditions
Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable
Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable
Laying of OFC Cable with HDPE pipe as per site conditions
Laying of OFC Cable with HDPE pipe as per site conditions
Fixing or laying of HDPE Pipe as per the site conditions
Fixing or laying of HDPE Pipe as per the site conditions
Fixing of GI Pipe under the road as per the site conditions while crossing the Road
Fixing of GI Pipe under the road as per the site conditions while crossing the Road
Fixing of 24 port Copper Patch Panel and labelling the ports
Fixing of 24 port Copper Patch Panel and labelling the ports
Fixing of 12 core OFC Patch Panel and labeling the cable
Fixing of 12 core OFC Patch Panel and labeling the cable
Fixing of 15U Rack Wall Mounting or as per the site conditions
Fixing of 15U Rack Wall Mounting or as per the site conditions
Splicing of OFC Cores
Splicing of OFC Cores
ODTR test Reports for OFC
ODTR test Reports for OFC
Fluke Meter Test Report for all the data points
Fluke Meter Test Report for all the data points
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Supply of 24 port POE Manageable Switch | Supply of 24 port POE Manageable Switch | 10 | number | con_vogb_1 | 60 | |
| 2 | Supply of Distribution Switch | Supply of Distribution Switch | 1 | number | con_vogb_1 | 60 | |
| 3 | Supply of Independeent Wifi Access Point WAP | Supply of Independeent Wifi Access Point WAP | 9 | number | con_vogb_1 | 60 | |
| 4 | Supply of Cat6 UTP Cable | Supply of Cat6 UTP Cable | 4,920 | meters | con_vogb_1 | 60 | |
| 5 | Supply of 6Core Armoured OFC Cable | Supply of 6Core Armoured OFC Cable | 1,450 | meters | con_vogb_1 | 60 | |
| 6 | Supply of 24 port Copper Patch Panel | Supply of 24 port Copper Patch Panel | 10 | number | con_vogb_1 | 60 | |
| 7 | Supply of 12 core Fiber Patch Panel Fully Loaded | Supply of 12 core Fiber Patch Panel Fully Loaded | 11 | number | con_vogb_1 | 60 | |
| 8 | Supply of 10G SFP Transceiver for access and distribution switch | Supply of 10G SFP Transceiver for access and distribution switch | 24 | number | con_vogb_1 | 60 | |
| 9 | supply of 1meter OFC Patch Cord | supply of 1meter OFC Patch Cord | 24 | number | con_vogb_1 | 60 | |
| 10 | Supply of 3 meter UTP Patch Cord | Supply of 3 meter UTP Patch Cord | 82 | number | con_vogb_1 | 60 | |
| 11 | Supply of 1 meter UTP Patch Cord | Supply of 1 meter UTP Patch Cord | 82 | number | con_vogb_1 | 60 | |
| 12 | Supply of 15 U Rack for IT Hub Rooms | Supply of 15 U Rack for IT Hub Rooms | 9 | number | con_vogb_1 | 60 | |
| 13 | Supply of 32U Rack for IT Server Room | Supply of 32U Rack for IT Server Room | 1 | number | con_vogb_1 | 60 | |
| 14 | Supply of 1 KVA UPS for IT Hub Rooms | Supply of 1 KVA UPS for IT Hub Rooms | 9 | number | con_vogb_1 | 60 | |
| 15 | Supply of 3 KVA UPS for IT Server Room | Supply of 3 KVA UPS for IT Server Room | 1 | number | con_vogb_1 | 60 | |
| 16 | Supply of IO Box with faceplate and RJ 45 Jack | Supply of IO Box with faceplate and RJ 45 Jack | 82 | number | con_vogb_1 | 60 | |
| 17 | Supply of ISO marked HDPE PIPE for laying OFC Cable | Supply of ISO marked HDPE PIPE for laying OFC Cable | 725 | meters | con_vogb_1 | 60 | |
| 18 | Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable | Supply of ISO Marked 25mm PVC Conduit for laying UTP Cable | 1,312 | meters | con_vogb_1 | 60 | |
| 19 | Supply of ISO Marked 25 mm PVC Capping or Casing | Supply of ISO Marked 25 mm PVC Capping or Casing | 328 | meters | con_vogb_1 | 60 | |
| 20 | Supply of GI Pipe for OFC Laying while road crossing | Supply of GI Pipe for OFC Laying while road crossing | 20 | meters | con_vogb_1 | 60 | |
| 21 | Installation and Configuration of 24 port POE Switch | Installation and Configuration of 24 port POE Switch | 10 | number | con_vogb_1 | 60 | |
| 22 | Installation and Configuration of Distribution Switch | Installation and Configuration of Distribution Switch | 1 | number | con_vogb_1 | 60 | |
| 23 | Installation and configuration of Wifi Access Point | Installation and configuration of Wifi Access Point | 9 | number | con_vogb_1 | 60 | |
| 24 | Laying of CAT6 UTP Cable as per the site conditions | Laying of CAT6 UTP Cable as per the site conditions | 4,920 | meter | con_vogb_1 | 60 | |
| 25 | Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable | Fixing of PVC Conduit and Capping Casing for Laying CAT6 Cable | 1,640 | meter | con_vogb_1 | 60 | |
| 26 | Laying of OFC Cable with HDPE pipe as per site conditions | Laying of OFC Cable with HDPE pipe as per site conditions | 1,450 | meter | con_vogb_1 | 60 | |
| 27 | Fixing or laying of HDPE Pipe as per the site conditions | Fixing or laying of HDPE Pipe as per the site conditions | 725 | meter | con_vogb_1 | 60 | |
| 28 | Fixing of GI Pipe under the road as per the site conditions while crossing the Road | Fixing of GI Pipe under the road as per the site conditions while crossing the Road | 20 | meter | con_vogb_1 | 60 | |
| 29 | Fixing of 24 port Copper Patch Panel and labelling the ports | Fixing of 24 port Copper Patch Panel and labelling the ports | 10 | number | con_vogb_1 | 60 | |
| 30 | Fixing of 12 core OFC Patch Panel and labeling the cable | Fixing of 12 core OFC Patch Panel and labeling the cable | 11 | number | con_vogb_1 | 60 | |
| 31 | Fixing of 15U Rack Wall Mounting or as per the site conditions | Fixing of 15U Rack Wall Mounting or as per the site conditions | 9 | number | con_vogb_1 | 60 | |
| 32 | Splicing of OFC Cores | Splicing of OFC Cores | 144 | cores | con_vogb_1 | 60 | |
| 33 | ODTR test Reports for OFC | ODTR test Reports for OFC | 72 | cores | con_vogb_1 | 60 | |
| 34 | Fluke Meter Test Report for all the data points | Fluke Meter Test Report for all the data points | 82 | number | con_vogb_1 | 60 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Additional Doc 3 (Requested in ATC)
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer