TenderDekho Logo
Active GEM

State Bank of India SBI Procurement: 2.0-4.0 TR Inverter ACs, Stabilizers & Allied Installation Lucknow 2026

Bid Publish Date

05-Oct-2026, 12:07 pm

Bid End Date

15-Oct-2026, 1:00 pm

EMD

₹6,900

Progress

Issue05-Oct-2026, 12:07 pm
AwardPending

Key Highlights

  • • OEM authorization and OEM-certified installation mandatory
  • • GST compliance with supplier-provided GST rate and invoice alignment
  • • Delivery flexibility: quantity up to 25% more/less during contract
  • • Copper-wound stabilisers (4.0 KVA, 5.0 KVA) with 130-280V range

Tender Overview

The State Bank of India invites bids in Lucknow, Uttar Pradesh for the supply and installation of multiple air-conditioning solutions and electrical ancillaries. Key items include 2.0 TR cassette ACs, 1.0–2.0 TR hi-wall split ACs, 4.0 and 5.0 KVA stabilisers with copper windings (130–280V range), drain pumps with water tanks, copper refrigerant piping (0.7 mm min thickness), interconnecting wires, MS angle for outdoor units, and associated dismantling/reinstallation services at SBI Jankipuram Branch. The scope emphasizes OEM/authorized support, installation, testing, and commissioning. The estimated value is not disclosed; the EMD is ₹6,900. A flexible quantity clause allows up to 25% variation. Delivery aligns with the last date of the original order with extension rules. GST considerations are supplier-driven. Data sheets must match technical parameters. OEM authorization is mandatory for non-manufacturer bidders.

Technical Specifications & Requirements

  • Product categories: 2.0 TR cassette ACs, 2.0/1.5/1.0 TR hi-wall split ACs, 4.0 KVA & 5.0 KVA stabilisers with copper winding, drain pumps with water tanks; installation of piping (min 0.7 mm thickness) for various AC capacities; electrical interconnections; PVC drain pipes (25 mm) with insulation; MS angle for outdoor units; dismantling/reinstallation of existing SACs.
  • Standards/assurance: OEM/ OEM-certified installation, data sheet alignment, GST compliance, and post-installation testing. Warranty/AMC terms not explicitly stated; emphasis on data sheet match and authorized service.
  • Delivery/installation: at SBI Jankipuram Branch, Lucknow (226024).
  • Documentation: OEM authorization, GST invoices, and compliance certificates; data sheets uploaded with bid.
  • Risk/clauses: option for quantity changes up to 25% at contracted rates; data sheet mismatch can lead to rejection.

Terms, Conditions & Eligibility

  • EMD: ₹6,900; payment terms follow buyer terms with GST as per actuals; invoice to be in consignee name with GSTIN. Data sheet submission required; installation/commissioning by OEM-certified resources. Imported products require Indian registered after-sales support. Authorized distributor bids require OEM authorization.
  • Delivery: timeline linked to original delivery order; extended time rules apply per option clause. 25% quantity variation allowed during contract.
  • Documentation: GST registration, PAN, experience certificates, financial statements, EMD document, OEM authorization, data sheets. Invoicing via GeM portal with GST payment proof.
  • Compliance: data sheet match, OEM authorization, and service support from OEM or authorized reseller. Penalty/LD details not specified; terms emphasize verification and data integrity.

Key Specifications

  • 2.0 TR cassette AC

  • 2.0/1.5/1.0 TR hi-wall split AC

  • 4.0 KVA copper-winding stabiliser (130-280V)

  • 5.0 KVA copper-winding stabiliser (130-280V)

  • copper refrigerant pipes min thickness 0.7 mm

  • 25 mm PVC drain pipes with insulation

  • MS angle for outdoor units

  • interconnecting wires for 2.0 TR and 1.0–2.0 TR units

  • drain pump with water tank

  • dismantle/reinstall existing SACs; core cutting chiseling up to 75 mm

Terms & Conditions

  • Delivery window linked to original delivery order with extension rules

  • Up to 25% quantity variation allowed at contracted rates

  • Data sheet match and OEM authorization mandatory

Important Clauses

Payment Terms

GST as actuals; invoice in consignee name with GSTIN; GeM portal submission with GST payment proof

Delivery Schedule

Delivery/installation to SBI Jankipuram Branch, Lucknow; period governed by last date of original delivery order and extended period per option clause

Penalties/Liquidated Damages

Not specified in provided terms; emphasis on timely delivery within option-based extension framework

Bidder Eligibility

  • Organizational authorization from OEM or OEM-certified service provider

  • GST registration and PAN verification

  • Experience in supply/installation of 1.0–2.0 TR ACs and related electricals

Advertisement

Tender Data

Bid Details

Quantity

309

Category

Supply of Cassette AC, 2.0 TR BEE 5-Star Inverter AC

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

3

Past Performance

80 %

Experience Required

3 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply of Cassette AC, 2.0 TR BEE 5-Star Inverter AC , Supply of Hi-Wall Split AC, 2.0 TR BEE 5-Star Inverter AC , Supply of Hi-Wall Split AC, 1.5 TR BEE 5-Star Inverter AC , Supply of Hi-Wall Split AC, 1.0 TR BEE 5-Star Inverter AC , Supply and Installation of 4.0 KVA Stabliser having copper winding with voltage range of 130 - 280V , Supply and Installation of 5.0 KVA Stabliser having copper winding with voltage range of 130 - 280V , Supply and Installation of DRAIN PUMP having water tank , Installation of 2.0 TR Cassette AC , Installation of 2.0 or 1.5 TR Hi-Wall Split AC , Supply and Installation of copper refrigerent pipes with min thickness 0.7 mm or higher for 2.0 TR CACs , Supply and Installation of copper refrigerent pipes with min thickness 0.7 mm or higher for 1.0 or 1.5 or 2.0 TR SACs , Supply and Installation of interconnecting wires for 2.0 TR Cassette Acs , Supply and Installation of interconnecting wires for 1.0 or 1.5 or 2.0 TR Hi-wall Split Acs , Supply and Installation of 25 mm PVC drain Pipes with insulation , Supply and Installation of MS Angle for Outdoor units , Dismantle shifting and reinstallation of old existing 2.0 or 1.5 or 1.0 TR SACs , Core cutting chiseling upto 75 mm with and 50 mm depth

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

45

Delivery Locations

1

Delivery Cities

Lucknow

Delivery Pincodes

226001

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Rajeev Kumar226001,State Bank of India, Local Head Office, Moti Mahal Marg, HazratganjLucknowUttar Pradesh226001345-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9984662.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Lho Lucknow

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 17 Items Sign in for GEM prices

#1

Supply of Cassette AC, 2.0 TR BEE 5-Star Inverter AC

Supply of 2.0 Tr Cassette type AC BEE rated (2025-26 Model) 5-Star inverter technology split air conditioner with full function wireless remote and auto restart feature, with indoor/outdoor unit, gas charge, Copper condenser coils and Copper cooling coils company provided copper refrigerant pipe complete in all respects.

3 pieces Delivery: 45 days
#2

Supply of Hi-Wall Split AC, 2.0 TR BEE 5-Star Inverter AC

Supply of 2.0 Tr hi wall type BEE rated (2025-26 Model) 5-Star inverter technology split air conditioner with full function wireless remote and auto restart feature, with indoor/outdoor unit, gas charge, Copper condenser coils and Copper cooling coils company provided copper refrigerant pipe complete in all respects.

3 pieces Delivery: 45 days
#3

Supply of Hi-Wall Split AC, 1.5 TR BEE 5-Star Inverter AC

Supply of 1.5 Tr hi wall type BEE rated (2025-26 Model) 5-Star inverter technology split air conditioner with full function wireless remote and auto restart feature, with indoor/outdoor unit, gas charge, Copper condenser coils and Copper cooling coils company provided copper refrigerant pipe complete in all respects.

1 pieces Delivery: 45 days
#4

Supply of Hi-Wall Split AC, 1.0 TR BEE 5-Star Inverter AC

Supply of 1.0 Tr hi wall type BEE rated (2025-26 Model) 5-Star inverter technology split air conditioner with full function wireless remote and auto restart feature, with indoor/outdoor unit, gas charge, Copper condenser coils and Copper cooling coils company provided copper refrigerant pipe complete in all respects.

2 pieces Delivery: 45 days
#5

Supply and Installation of 4.0 KVA Stabliser having copper winding with voltage range of 130 - 280V

Supply & Installation of 4.0 KVA, wall mounted hi lo cut off stabiliser with TDR having copper winding with voltage range of 130 - 280V, complete in all respects.

3 pieces Delivery: 45 days
#6

Supply and Installation of 5.0 KVA Stabliser having copper winding with voltage range of 130 - 280V

Supply & Installation of 5.0 KVA, wall mounted hi lo cut off stabiliser with TDR having copper winding with voltage range of 130 - 280V, complete in all respects.

6 pieces Delivery: 45 days
#7

Supply and Installation of DRAIN PUMP having water tank

Supply and Installation of DRAIN PUMP having water tank

1 pieces Delivery: 45 days
#8

Installation of 2.0 TR Cassette AC

Installation, testing and commissioning of 2.0 TR Cassette air conditioner/ old AC dismantled from branch with wall cutting/ mounting, stabiliser and making good of damages complete in all respects.

3 pieces Delivery: 45 days
#9

Installation of 2.0 or 1.5 TR Hi-Wall Split AC

Installation, testing and commissioning of 2.0 or 1.5 TR Hi wall type split air conditioner/ old AC dismantled from branch with wall cutting/ mounting, stabiliser and making good of damages complete in all respects.

6 pieces Delivery: 45 days
#10

Supply and Installation of copper refrigerent pipes with min thickness 0.7 mm or higher for 2.0 TR CACs

Supply, installation, testing and commissioning of insulated copper refrigerant piping set (suction and discharge) duly insulated by nitrile rubber for SUITABLE FOR 2.0 TR Cassette AC.

40 meters Delivery: 45 days
#11

Supply and Installation of copper refrigerent pipes with min thickness 0.7 mm or higher for 1.0 or 1.5 or 2.0 TR SACs

Supply, installation, testing and commissioning of insulated copper refrigerant piping set (suction and discharge) duly insulated by nitrile rubber Suitable for 1.0 or 1.5 of 2.0 TR Split AC.

30 meters Delivery: 45 days
#12

Supply and Installation of interconnecting wires for 2.0 TR Cassette Acs

Supply, installation, testing and commissioning of inter connecting wiring/ cabling between indoor and outdoor of 2.0 TR Cassette AC.

50 meters Delivery: 45 days
#13

Supply and Installation of interconnecting wires for 1.0 or 1.5 or 2.0 TR Hi-wall Split Acs

Supply, installation, testing and commissioning of inter connecting wiring/ cabling between indoor and outdoor of 1.0 or 1.5 or 2.0 TR hi wall split AC.

40 meters Delivery: 45 days
#14

Supply and Installation of 25 mm PVC drain Pipes with insulation

Supply, installation, testing and commissioning of PVC 25 mm water pipe with accessories and taking care to prevent leakages, for water drainage in concealed manner either on wall or under floor including making good of damages.

70 meters Delivery: 45 days
#15

Supply and Installation of MS Angle for Outdoor units

Supply and installation of robust MS angle, MS flat fabricated floor/ wall mounting stand suitable for outdoor units of Cassette/Split ACs, painted with one coat of primer and two coats of synthetic enamel outdoor type paint including its grouting and making good of damages.

9 pieces Delivery: 45 days
#16

Dismantle shifting and reinstallation of old existing 2.0 or 1.5 or 1.0 TR SACs

Dismantle shifting and reinstallation of old existing 2.0 or 1.5 or 1.0 TR SACs

2 pieces Delivery: 45 days
#17

Core cutting chiseling upto 75 mm with and 50 mm depth

Core cutting chiseling upto 75 mm with and 50 mm depth for concealing the copper pipes

40 meters Delivery: 45 days

Categories 73

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar supply/installation

4

Financial statements (audited, if available)

5

EMD submission document (₹6,900 via DD or online)

6

Technical data sheets for offered ACs and stabilisers

7

OEM authorization / dealership certificate

8

Invoices and GST payment proof uploaded on GeM

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for SBI tender in Lucknow for ACs and stabilisers?

Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD ₹6,900, OEM authorization, data sheets, and GeM invoice proof. Ensure data sheets match product specs for 2.0 TR cassette and hi-wall units, and furnish installation capability with OEM-certified personnel.

What documents are required for SBI Lucknow AC procurement bid 2026?

Required documents include GST certificate, PAN, experience certificates for similar projects, audited financials, EMD submission, OEM authorization, and technical data sheets for offered units. Invoicing must be in consignee name with GSTIN; OEM warranty terms to be supported.

What are the technical specifications for 2.0 TR cassette AC in this SBI bid?

Bid must reflect a 2.0 TR cassette AC with data sheet alignment. Include copper refrigerant piping with minimum 0.7 mm thickness, interconnecting wires for 2.0 TR, and installation by OEM-certified personnel. Verify performance and ISI/IS standards if specified in data sheet.

When is the delivery deadline for SBI Lucknow HVAC equipment?

Delivery is governed by the last date of the original delivery order with option-based extensions. If quantity is increased, additional time is calculated as (Additional quantity / Original quantity) × Original delivery period, with a minimum of 30 days.

What are the payment terms for the SBI Lucknow supply contract?

GST will be reimbursed per actuals; invoice must be raised in consignee name with GSTIN; payment proof uploaded on GeM portal. The contract may allow staged payments per delivery milestones, subject to supplier’s GST compliance and data sheet verification.

What申请 OEM authorization is required for imported AC equipment?

Imported products require an OEM or Authorized Seller with a registered India office to provide after-sales service; submit the certificate proving Indian presence and service capability; ensure data sheet and warranty terms align with OEM standards.

What is the scope of installation services in SBI Jankipuram Lucknow bid?

Scope includes installation, commissioning, testing, and configuration by OEM-certified personnel; dismantling/reinstallation of existing SACs where needed; 25 mm PVC ducting with insulation and MS angle mounting for outdoor units; all wiring and piping must meet minimum thickness and safety standards.