TenderDekho Logo
Active GEM

Indian Army LV7 SCORPIO Spare Parts Tender Dhemaji Assam 2026 – ISI/OEM Data Sheet, GST, EMD

Bid Publish Date

19-Oct-2026, 5:44 pm

Bid End Date

30-Oct-2026, 9:00 am

Progress

Issue19-Oct-2026, 5:44 pm
AwardPending

Tender Overview

The Indian Army, Department Of Military Affairs, invites bids for a defined list of LV7 SCORPIO vehicle spare parts at Dhemaji, Assam (786110). The procurement scope covers multiple component SKUs including bearing assemblies, wheel bearings, sensor wheels, universal joint assemblies, filters, brake shoes, belts, oil filters, front brake pads, gear lever, and speedometer assemblies, intended to support fleet maintenance. The contract structure accommodates quantity variants up to a 25% increase/decrease at bid-to-contract stage and during the currency of the contract, with delivery timelines linked to the original order’s completion date. The opportunity targets qualified suppliers capable of supplying OEM-equivalent parts with verifiable data sheets and GST compliance.

Technical Specifications & Requirements

  • Product names: LV7 SCORPIO bearing assemblies, sensor wheels, universal joints, fuel filter, rear wheel/cylinders, brake shoes, alternator belt, water pump belt, oil filter, front pad assembly, universal joint front, gear lever shift control, speedometer assembly
  • Data Sheet: mandatory upload; ensure parameter-by-parameter match to offered products
  • Inspection: Nominated Inspection Agency to be designated by Buyer
  • Data integrity: ensure no mismatch between offered data sheets and actual product specifications
  • Compliance: parts must be compatible with LV7 SCORPIO variants and OEM-replacement standards
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate, NDA submission required
  • Data accuracy: non-disclosure and confidentiality obligations apply

Terms, Conditions & Eligibility

  • EMD: not specified in data; bidders must align with GeM-based security and bank deposit norms
  • Delivery: delivery period linked to original delivery order; option clause allows up to 25% quantity variation
  • GST: bidders responsible for applicable GST; reimbursement as per actuals or lower quoted rate
  • Eligibility: bidder not under liquidation or bankruptcy; must upload undertaking
  • Documentation: PAN, GSTIN, cancelled cheque, EFT mandate, NDA, OEM data sheet
  • Data Sheet verification: mismatches may lead to bid rejection
  • Payment & invoicing: GST invoice to be uploaded on GeM with GST payment confirmation

Key Specifications

    • Product scope includes: bearing double ball 3G 4WD, rear wheel bearing, front sensor wheel, rear sensor wheel, universal joint rear, fuel filter, rear wheel cylinder, brake shoe, belt alternator, belt water pump, oil filter, front brake pad assembly, universal joint front, gear lever shifting control, speedometer assembly for LV7 SCORPIO
    • Data Sheet requirement: upload with bid; must align with offered part specifications
    • Inspection: Nominated Inspection Agency designated by Buyer
    • Compliance: OEM/IS compatibility with LV7 SCORPIO variants; data-sheet verified
    • Documentation: mandatory NDA, GST/PAN/EFT documents, and bank details

Terms & Conditions

  • Key term: Quantity flex up to 25% at contract placement and during currency

  • Key term: Bidder must upload Data Sheet and NDA with bid

  • Key term: GST payable by bidder; reimbursement as actuals or lower rate

Important Clauses

Payment Terms

GST payable by bidder; reimbursement based on actuals or lower quoted rate; GST invoice must be uploaded on GeM with payment confirmation

Delivery Schedule

Delivery period linked to last date of original delivery order; option quantity adjustments permitted with defined calculation rule

Penalties/Liquidated Damages

Not explicitly stated in provided terms; implied adherence to delivery timelines and data-sheet accuracy

Bidder Eligibility

  • Not under liquidation, court receivership, or bankruptcy

  • Must provide PAN, GSTIN, cancelled cheque, EFT mandate

  • Must upload OEM data sheet and NDA; be able to supply OEM-equivalent LV7 SCORPIO parts

Advertisement

Tender Data

Bid Details

Quantity

20

Category

LV7 SCORPIO 0503CAA0108N BEARING DOUBLE BALL 3G 4WD

Bid Type

Two Packet Bid

Bid Validity

180 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

50% Lowest Priced Technically Qualified Bidders

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Warranty Period

1 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

LV7 SCORPIO 0503CAA0108N BEARING DOUBLE BALL 3G 4WD , LV7 SCORPIO 0502CAA01990N REAR WHEEL BEARING , LV7 SCORPIO 0609AAA00090N SENSOR WHEEL FRONT , LV7 SCORPIO 069AAA0020N SENSOR WHEEL REAR , LV7 SCORPIO 0502CAA00171N UNIVERSAL JOINT ASSY REAR , LV7 SCORPIO 1801DAA00561A FUEL FILTER , LV7 SCORPIO 0602BABAB05700N WHEEL CYL REAR , V7 SCORPIO 0602BAB06670N REAR BRAKE SHOE , LV7 SCORPIO 0306GBH00051N BELT ALTERNATOR , LV7 SCORPIO 0306GBH00021N BELT WATER PUMP , LV7 SCORPIO 0303BAM00350N OIL FILTER , LV7 SCORPIO 0603BAB0062KT FRONT PAD ASSY , LV7 SCORPIO 0501CAA00171N UNIVERSAL JOINT ASSY FRONT , LV7 MG 28101 83035 GEAR LEVER SHIFTING CONTROL , LV7 ARMY BUS 2751 5420 9907 SPEEDOMETER ASSY

Pre-Bid & Qualification

Pre-Bid Date

20-10-2026 17:00:00

Pre-Bid Venue

874 FD WKSP COY

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Dhemaji

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DhemajiDhemaji--215-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10057502.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Indian Army

Office Name

Not disclosed yet

Grievance Contact

[email protected]

Bill of Quantities (BOQ) 15 Items Sign in for GEM prices

#1

LV7 SCORPIO 0503CAA0108N BEARING DOUBLE BALL 3G 4WD

LV7 SCORPIO 0503CAA0108N BEARING DOUBLE BALL 3G 4WD

2 nos Delivery: 15 days
#2

LV7 SCORPIO 0502CAA01990N REAR WHEEL BEARING

LV7 SCORPIO 0502CAA01990N REAR WHEEL BEARING

2 nos Delivery: 15 days
#3

LV7 SCORPIO 0609AAA00090N SENSOR WHEEL FRONT

LV7 SCORPIO 0609AAA00090N SENSOR WHEEL FRONT

2 nos Delivery: 15 days
#4

LV7 SCORPIO 069AAA0020N SENSOR WHEEL REAR

LV7 SCORPIO 069AAA0020N SENSOR WHEEL REAR

2 nos Delivery: 15 days
#5

LV7 SCORPIO 0502CAA00171N UNIVERSAL JOINT ASSY REAR

LV7 SCORPIO 0502CAA00171N UNIVERSAL JOINT ASSY REAR

1 nos Delivery: 15 days
#6

LV7 SCORPIO 1801DAA00561A FUEL FILTER

LV7 SCORPIO 1801DAA00561A FUEL FILTER

1 nos Delivery: 15 days
#7

LV7 SCORPIO 0602BABAB05700N WHEEL CYL REAR

LV7 SCORPIO 0602BABAB05700N WHEEL CYL REAR

2 nos Delivery: 15 days
#8

V7 SCORPIO 0602BAB06670N REAR BRAKE SHOE

V7 SCORPIO 0602BAB06670N REAR BRAKE SHOE

1 nos Delivery: 15 days
#9

LV7 SCORPIO 0306GBH00051N BELT ALTERNATOR

LV7 SCORPIO 0306GBH00051N BELT ALTERNATOR

1 nos Delivery: 15 days
#10

LV7 SCORPIO 0306GBH00021N BELT WATER PUMP

LV7 SCORPIO 0306GBH00021N BELT WATER PUMP

1 nos Delivery: 15 days
#11

LV7 SCORPIO 0303BAM00350N OIL FILTER

LV7 SCORPIO 0303BAM00350N OIL FILTER

1 nos Delivery: 15 days
#12

LV7 SCORPIO 0603BAB0062KT FRONT PAD ASSY

LV7 SCORPIO 0603BAB0062KT FRONT PAD ASSY

1 nos Delivery: 15 days
#13

LV7 SCORPIO 0501CAA00171N UNIVERSAL JOINT ASSY FRONT

LV7 SCORPIO 0501CAA00171N UNIVERSAL JOINT ASSY FRONT

1 nos Delivery: 15 days
#14

LV7 MG 28101 83035 GEAR LEVER SHIFTING CONTROL

LV7 MG 28101 83035 GEAR LEVER SHIFTING CONTROL

1 nos Delivery: 15 days
#15

LV7 ARMY BUS 2751 5420 9907 SPEEDOMETER ASSY

LV7 ARMY BUS 2751 5420 9907 SPEEDOMETER ASSY

1 nos Delivery: 15 days
Advertisement

Categories 14

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Data Sheet of offered product(s)

6

NON DISCLOSURE DECLARATION CERTIFICATE

7

GST invoice scan and GST portal payment screenshot

Frequently Asked Questions

Key insights about ASSAM tender market

How to bid for LV7 Scorpio spare parts tender in Dhemaji Assam 2026

Bidders must submit PAN, GSTIN, cancelled cheque, EFT mandate, NDA, and Data Sheet for all offered LV7 SCORPIO components. Ensure data-sheet accuracy, comply with delivery terms, and include option-quantity variation details. GST payable at applicable rates, with GST invoice uploaded on GeM.

What documents are required for LV7 Scorpio parts procurement in Assam

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, NDA, OEM data sheets, and GST invoice scan. Data Sheet must match offered parts; non-disclosure forms must be on bidder letterhead; submission through GeM portal with bid.

What are the technical specifications for LV7 Scorpio components tender

Technical docs demand OEM-equivalent LV7 SCORPIO parts such as bearings, sensor wheels, universal joints, fuel filters, brake shoes, belts, oil filters, front pads, and speedometer assembly. Data Sheet must reflect exact part numbers, dimensions, and compatibility with LV7 variants.

When is the delivery deadline and quantity variation allowed for this tender

Delivery is tied to the original delivery order; quantity variation up to 25% is allowed at contract placement and during the currency of the contract, per option clause. If exercised, the extra time uses a defined formula with a minimum 30 days baseline.

What is the EMD and payment terms for LV7 Scorpio parts bid

EMD amount is not stated in provided data; bidders should align with GeM norms for security deposits. GST payment is on actuals or lower rate; GST invoice must be uploaded and payment confirmed on GeM.

What inspections are required for LV7 Scorpio parts procurement

Nominated Inspection Agency will be designated by the Buyer; products must pass inspection per the Data Sheet and LV7 Scorpio specifications; any mismatch may lead to bid rejection.

How to ensure data-sheet accuracy for LV7 Scorpio components

Upload a precise Data Sheet matching exact part numbers, dimensions, and OEM compatibility; buyers will verify parameters against the offered data. Any mismatch can render the bid non-compliant and rejected.

What are the eligibility criteria for bidders supplying LV7 Scorpio parts

Eligible bidders must show no liquidation or bankruptcy, provide PAN and GSTIN, furnish EFT mandate, NDA, and OEM data sheets, and demonstrate ability to supply OEM-equivalent LV7 Scorpio components with verified data.

Advertisement