Key Highlights

  • • Product scope includes 1.5 TR Split AC, 4.0 KVA stabiliser, and essential installation accessories
  • • OEM authorization required for non-OEM bids; include complete authorization details
  • • Delivery terms allow +25% quantity variation with corresponding time adjustments
  • • Non-obsolescence requirement: offered products must have at least 1 year residual market life

Tender Overview

State Bank Of India invites bids for the SITC of 1.5 Tr Split AC, 4.0 KVA wall mounted stabiliser, drain pipe, copper refrigerant piping set, wire, Robost MS angle, and related accessories at Varanasi, Uttar Pradesh 221001. Estimated value ₹236,050.00. Delivery and installation to SBI VIP Guest House, AO Varanasi Campus, Opposite Benaras Club, Katchehry Road, Harmautia, Varansi. The scope includes all essential accessories for successful installation and commissioning, compatibility with existing SBI inventory, and OEM authorization where applicable. An option clause allows ±25% quantity variation at contracted rates, with delivery time adjustments based on the extended quantity. Bidders must ensure products are not obsolete and have at least 1 year residual market life. GST handling is bidder’s responsibility with reimbursement as per actuals or applicable rates. Manufacturer authorization and GSTIN-compliant invoicing are required.

Technical Specifications & Requirements

  • Product categories: 1.5 TR Split AC, 4.0 KVA wall mounted stabiliser, SITC of split AC, drain pipe, copper refrigerant piping set, wire, Robost MS angle.
  • Estimated value: ₹236,050.00.
  • Delivery location: SBI VIP Guest House AO Varanasi Campus, Harmautia, Varanasi, Uttar Pradesh.
  • Key conditions: compatibility with existing SBI system, inclusion of all installation accessories, OEM authorization when required.
  • Standards/quality: not explicitly stated; emphasize non-obsolescence with minimum 1 year residual market life.
  • Documentation: Manufacturer Authorization where applicable; GST considerations managed by bidder; invoice in consignee GSTIN.
  • Timeline: delivery/installation to follow original delivery order terms with option-based extension rules.

Terms, Conditions & Eligibility

  • EMD: Not specified in the data (check terms).
  • Delivery terms: delivery and installation at SBI Varanasi address; extension per option clause (up to 25% quantity variation).
  • Obsolescence clause: equipment must have at least 1 year residual market life.
  • GST: bidder to account for GST; reimbursement governed by actuals or capped rates.
  • Authorization: OEM-authorized distributors must provide authorization certificate with contact details.
  • Invoicing: Invoice must be raised in the name of the consignee with the consignee GSTIN.
  • Compatibility: supplied items must integrate with existing SBI inventory without extra cost for compatibility.
  • Warranty/Support: not explicitly stated; ensure installation/commissioning coverage per scope.

Key Specifications

  • 1.5 TR Split AC unit

  • 4.0 KVA wall mounted stabiliser

  • Drain pipe and copper refrigerant piping set

  • Electrical wire and Robost MS angle

  • SITC of split AC and associated accessories

  • Delivery to SBI VIP Guest House Varansi Campus

  • Compatibility with existing SBI inventory and installation support

Terms & Conditions

  • Option clause permits ±25% quantity variation during contract and extended delivery

  • Delivery/installation address specified; GST handled by bidder; invoicing to consignee GSTIN

  • 1 year residual market life required; no obsolescence; OEM authorization where applicable

Important Clauses

Payment Terms

GST to be processed per actuals or applicable rate; bidder bears GST obligations; invoice must reflect consignee GSTIN

Delivery Schedule

Delivery/installation at SBI Varansi Campus; delivery period governs original delivery order; extension rules apply under option clause

Penalties/Liquidated Damages

Not explicitly stated; ensure compliance with option-based delivery and installation timelines to avoid potential LDs

Bidder Eligibility

  • Bidder must provide OEM authorization if bidding through authorized distributors

  • Product offerings must have at least 1 year residual market life and not be obsolescent

  • Bidder must comply with GST requirements and invoicing in consignee GSTIN

Advertisement

Authority & Contact

Office Name

Lho Lucknow

Grievance Contact

[email protected]

Technical Results

S.No Seller Item Date Status
1
Coolking Servicing   Under PMA
-01-10-2026 19:15:14
2
MARK MATRIX SECURITY SOLUTIONS   Under PMA
-02-10-2026 17:19:30
3
MARUTI CORPORATION   Under PMA
-03-10-2026 18:41:22
4
MISHRA ENTERPRISES   Under PMA
-03-10-2026 22:24:11
5
PROCZILLA   Under PMA
-01-10-2026 10:39:59
6
SAURABH COOLING CORPORATION   Under PMA
-02-10-2026 23:38:01
7
Shree Hari Krishna Enterprises   Under PMA
-03-10-2026 16:08:08
8
VS SOLANKI ENTERPRISES   Under PMA
-04-10-2026 22:42:56

Financial Results

Rank Seller Price Item
L1
SAURABH COOLING CORPORATION( MSE Social Category:General )    Under PMA
Item Categories : 1.5 Tr Split AC,4.0 KVA wall mounted stabiliser,SITC of Split AC,Drain Pipe,Drain Pipe,copper refri
L2
MARUTI CORPORATION( MSE Social Category:General )    Under PMA
Item Categories : 1.5 Tr Split AC,4.0 KVA wall mounted stabiliser,SITC of Split AC,Drain Pipe,Drain Pipe,copper refri
L3
PROCZILLA( MSE Social Category:OBC )    Under PMA
Item Categories : 1.5 Tr Split AC,4.0 KVA wall mounted stabiliser,SITC of Split AC,Drain Pipe,Drain Pipe,copper refri
L4
MARK MATRIX SECURITY SOLUTIONS( MSE Social Category:General )    Under PMA
Item Categories : 1.5 Tr Split AC,4.0 KVA wall mounted stabiliser,SITC of Split AC,Drain Pipe,Drain Pipe,copper refri
L5
VS SOLANKI ENTERPRISES( MSE Social Category:SC )    Under PMA
Item Categories : 1.5 Tr Split AC,4.0 KVA wall mounted stabiliser,SITC of Split AC,Drain Pipe,Drain Pipe,copper refri
L6
Coolking Servicing( MSE Social Category:General )    Under PMA
Item Categories : 1.5 Tr Split AC,4.0 KVA wall mounted stabiliser,SITC of Split AC,Drain Pipe,Drain Pipe,copper refri

Tender Data

Bid Details

Quantity

90

Category

1.5 Tr Split AC

Bid Type

Two Packet Bid

Bid Validity

30 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Past Performance

80 %

Warranty Period

3 years

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

1.5 Tr Split AC , 4.0 KVA wall mounted stabiliser , SITC of Split AC , Drain Pipe , copper refrigerant piping set , Wire , Robost MS Angle

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

12

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Varanasi

Delivery Pincodes

221002

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Sonu Singh221002,STATE BANK OF INDIA, ADMINISTRATIVE OFFICE, OPP. KACHAHARI ROADVaranasiUttar Pradesh221002515-

Authority Records

MINISTRY OF FINANCEFINANCIAL SERVICES DEPARTMENTSTATE BANK OF INDIA

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9945815.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Advertisement

Bill of Quantities (BOQ) 8 Items Sign in for GEM prices

#1

1.5 Tr Split AC

Supply of 1.5 TR hi wall type BEE rated (2025)5-Star inverter technology split air conditioner with full function wireless remote and auto restart feature, with indoor/outdoor unit, gas charge, Copper condenser coils and Copper cooling coils company provided copper refrigerant pipe complete in all respects.

5 nos Delivery: 15 days
#2

4.0 KVA wall mounted stabiliser

Supply & installation of 4.0 KVA (12 AMP), wall mounted stabiliser with TDR (1.5 Split ACs), having Copper winding with voltage range of 130-280V, complete in all respects.

5 nos Delivery: 15 days
#3

SITC of Split AC

Installation, testing and commissioning of 2.0 or 1.5 or 1.0 TR Hi wall type split air conditioner/ old AC dismantled from branch with wall cutting/ mounting, stabiliser and making good of damages complete in all respects.

5 nos Delivery: 15 days
#3

Drain Pipe

Supply, installation, testing and commissioning of PVC 25 mm water pipe with accessories and taking care to prevent leakages, for water drainage in concealed manner

30 meter Delivery: 15 days
#4

Drain Pipe

Supply, installation, testing and commissioning of PVC 30 mm water pipe with accessories and taking care to prevent leakages, for water drainage in concealed manner

5 meter Delivery: 15 days
#5

copper refrigerant piping set

Supply, installation, testing and commissioning of insulated copper refrigerant piping set (suction and discharge) duly insulated by nitrile rubber for Split AC.

15 meter Delivery: 15 days
#6

Wire

Supply, installation, testing and commissioning of inter connecting wiring/ cabling between indoor and outdoor of split AC

20 meter Delivery: 15 days
#7

Robost MS Angle

Supply and installation of robust MS angle, MS flat fabricated floor/ wall mounting stand suitable for outdoor units of Cassette/Split Acs

5 nos Delivery: 15 days

Categories 50

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates relevant to similar procurements

4

Financial statements showing turnover

5

EMD/Security deposit (if applicable as per tender terms)

6

Technical bid documents

7

OEM authorization / Manufacturer authorization certificate

8

Authorization form with OEM details (name, designation, address, email, phone)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for the SBI Varansi air conditioning tender 2026?

Bidders should submit GSTIN, PAN, experience certificates, financials, OEM authorization, and technical bid. Ensure the offered 1.5 TR split AC and 4.0 KVA stabiliser are not obsolete with at least 1 year residual market life, and provide installation accessories for SBI Varansi Campus delivery.

What documents are required for SBI Varansi split AC procurement?

Required documents include GST certificate, PAN card, experience certificates of similar work, financial statements, OEM authorization, technical bid, and consignee-specific GSTIN invoicing. Ensure the bid includes installation accessories and compatibility with existing SBI inventory.

What are the key technical specs for SBI Varansi air conditioning procurement 2026?

Items include 1.5 TR Split AC, 4.0 KVA stabiliser, drain pipe, copper piping, wiring, and Robost MS angle. Ensure installation accessories are included and equipment aligns with SBI’s existing system at the Varansi campus.

What is the delivery location for SBI Varansi procurement?

Delivery and installation must be at STATE BANK OF INDIA, VIP GUEST HOUSE AO VARANASI CAMPUS, OPPOSITE BENARAS CLUB, KATCHEHRY ROAD, HARMAUTIA, VARANASI 221001.

What are the GST requirements for SBI Varansi tender bidders?

Bidders must handle GST; reimbursement is as per actuals or applicable rates, whichever is lower, and the invoice must be raised in the consignee GSTIN.

What is the impact of the option clause on delivery for SBI Varansi tender?

The purchaser may increase/decrease quantity up to 25% at contract, with delivery time adjusted by (additional/ original quantity) × original delivery period, minimum 30 days.

What are OEM authorization requirements for SBI Varansi procurement?

When bidding via authorized distributors, provide an OEM authorization certificate detailing distributor name, address, email, phone, and designation to validate eligibility for the SBI Varansi tender.

When is installation and commissioning included for SBI Varansi goods?

Installation and commissioning are required as part of the scope at the SBI Varansi campus; bidder must supply all essential accessories and ensure compatibility with existing SBI inventory.