Progress
The Indian Air Force, Department Of Military Affairs, is tendering for a DOUBLE CYLINDER CO2 TROLLEY. The procurement includes a flexible quantity clause allowing a 25% up/down variation of the bid quantity during contract, with extended delivery time calculated as (increased quantity / original quantity) × original days, minimum 30 days. A mandatory Pre-Bid Meeting will be conducted at 52 SQN on the 6th day from tender publication. The supplier must provide 1-year warranty from final acceptance or after completion of installation/testing, and submit OEM warranty certificates at delivery. The vendor must demonstrate a capacious after-sales network with established installation, commissioning, training, troubleshooting, and maintenance services across India. A service-centre network location list near consignee destinations must be uploaded with the bid. The tender emphasizes compliance with installation requirements and documented scope acceptance, with the government reserving rights to modify quantity as per clause terms.
Double Cylinder CO2 Trolley: no specific quantitative specs provided
Warranty: 1 year from final acceptance or after installation/completion testing
Delivery: extended by option clause; minimum 30 days if applicable
After-sales: established service network in India; installation/training/troubleshooting
Pre-bid meeting: mandatory; venue 52 SQN, date as per tender publication
Delivery quantity may vary by up to 25% during contract
One-year OEM warranty required with certificates
Pre-bid meeting mandatory; submission with scope and government ID
Service centers to be located in India; installation/training mandated
Delivery periods may be adjusted by up to 25% of bid quantity; minimum 30 days extension if needed; calculated as (increased quantity ÷ original quantity) × original delivery period
1-year warranty from final acceptance or after installation/testing; OEM warranty certificates required at delivery; after-sales service network must be in India
Mandatory pre-bid meeting to explain scope; held at 52 SQN on the 6th day from tender publication; vendor must submit scope with rubber stamp
Must participate in mandatory pre-bid meeting and submit government ID
Demonstrate installation, commissioning, training, and maintenance capability in India
Provide OEM warranty certificates at the time of delivery
Quantity
12
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
Yes
Bid Splitting Applied
No
Min. Avg. Annual Turnover
325
Past Performance
50 %
Warranty Period
1 years
Experience Required
1 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
DOUBLE CYLINDER CO2 TROLLEY
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Pre-Bid Date
14-09-2026 11:00:00
Pre-Bid Venue
AT 52 SQN DSS COMPLEX (AFS BIDAR)
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Bidar
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Bidar | Bidar | - | - | 12 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
BIDDER SUBMISSION documents: scope of work signed with rubber stamp
GOVT Issued ID proof for pre-bid participation
OEM warranty certificates to be submitted at delivery
Proof of service center presence in India and near consignee locations
Documents confirming installation/commissioning capabilities
GST registration and PAN card
Any existing ISI/ISO certifications if applicable (not specified)
Key insights about KARNATAKA tender market
Bidders must attend the mandatory pre-bid meeting at 52 SQN, submit scope with rubber stamp, provide government ID, and include OEM warranty certificates. The bid also requires service-center details in India and documentation for installation and commissioning readiness.
Required documents include scope signed with rubber stamp, government ID, OEM warranty certificates, proof of service centers in India, GST registration, PAN card, and installation/maintenance capability proofs. Ensure submission aligns with the terms set by the buyer.
Delivery is governed by the option clause allowing up to 25% quantity variation; the extended delivery time is calculated as (increase/original) × original days, with a minimum extension of 30 days. The base delivery timeline starts after the original order date.
A 1-year warranty is required from final acceptance or after installation/completion testing. OEM warranty certificates must accompany the delivery, and the seller must guarantee rectification of any breakdown during the warranty period.
The bidder must have a well-established Installation, Commissioning, Training, Troubleshooting and Maintenance Service group in India, with service-center locations near consignee destinations, and provide details in the bid submission.
The pre-bid meeting is mandatory and will be conducted on the 6th day from the publishing date at 52 SQN. Attendees must bring government-issued ID and submit scope documentation with bid.
The purchaser reserves the right to increase or decrease the bid quantity by up to 25% at contract placement, and may extend the quantity during the contract at contracted rates, subject to delivery-time calculations.
The tender data does not specify particular standards; bidders should rely on OEM warranties and service capabilities within India, with documents demonstrating installation and maintenance readiness to support legal compliance and after-sales service.