Progress
Saran District Panchayats of the Department Of Panchayati Raj invites bids for a RO Plant with Genset and Trolley (Q3). The tender outlines an adaptable quantity clause allowing a +/-25% variation at contract award and during the currency at contracted rates. It emphasizes the need for a functional service center within the state for carry-in warranty or establishment within 30 days if not present, with payment linked to documentary evidence of service capability. This procurement targets robust water treatment equipment with on-site service considerations and flexible delivery timelines, reflecting state-level procurement norms.
Option Quantity up to 25% increase/decrease during contract
Functional Service Centre within the state or establish within 30 days
Delivery period linked to original and extended quantities with minimum 30 days
Payment release contingent on documentary evidence of a functional service centre or its successful establishment within 30 days of award.
Delivery timeline adjusts with quantity variations up to 25% at contract inception and during the contract period.
Not specified in provided terms; implied via delivery-time adjustments and service-center obligations.
Functional service capability within the state or ability to establish within 30 days
Experience in water treatment equipment supply or equivalent RO plant systems
Financial capability to handle potential 25% quantity variation
Quantity
2
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
No
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
RO Plant with Genset and Trolley (Q3)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Saran
Delivery Pincodes
841218
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Mukesh Kumar | 841218,koreyan | Saran | Bihar | 841218 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements
EMD/Security deposit
Technical bid documents
OEM authorizations (if applicable)
| Category | Specification | Requirement |
|---|---|---|
| Warranty/Services | Warranty on spare parts | 24 Or higher |
| Warranty/Services | Warranty on whole items supplied | 3, 4, 5 Or higher |
Key insights about BIHAR tender market
Bidders should ensure compliance with the option-quantity clause (+/-25%), establish or verify a functional service center within the state, and submit GST, PAN, and experience certificates along with technical bid documents. Ensure readiness to deliver within the contracted timeframe and provide documentary proof for service capability before payment release.
Required documents include GST registration, PAN card, experience certificates from similar RO plant projects, financial statements, EMD/security deposit, technical compliance certificates, and OEM authorizations if applicable. Ensure all documents are current and verifiable for bid evaluation.
Bids must demonstrate a functional service center within the consignee state or commit to establishing one within 30 days of award. Payment will be released upon documentary evidence of the service center’s status and readiness to provide carry-in warranty support as applicable.
The purchaser may increase or decrease the order by up to 25% at contract award and during the contract at contracted rates. Delivery timelines depend on the adjusted quantity, with calculations based on the original delivery period and a minimum 30-day extension when applicable.
Yes, a service center must be located within the state of the consignee or be approved by the buyer, with a maximum radius of 5 km from the delivery location, ensuring rapid maintenance and response times.
Eligibility requires evidence of service capability within the state or ability to establish within 30 days, relevant experience in water treatment equipment, and adequate financial capacity to handle potential quantity adjustments and warranty servicing.
Payment is contingent on documentary proof of service-center readiness and must align with the project’s terms. Ensure submission of service-center documentation along with the financial and technical bid to avoid delays.