Split AC Dismental,Split AC Wet Service,Split AC Installation,Copper Pipe Sleves,Split AC Outdoor S
Indian Army
MATHURA, UTTAR PRADESH
Progress
Quantity
133
Category
Carrying out Comprehensive annual maintenance of the One and Half Ton Split AC units 121 numbers spliyt AC Units
Bid Type
Two Packet Bid
Bharat Sanchar Nigam Limited Portal(bsnl) has released a public tender for Carrying out Comprehensive annual maintenance of the One and Half Ton Split AC units 121 numbers spliyt AC Units, Dual mode Power capacitor, Condensor fan motor capacitor, Starting Relay, Thermostat, Thermostat sensor, Fan blade for outdoor unit, Blower assembly for indoor unit, PCB repairs, Complete Gas Charging including vacumization and pressure testing etc, Topping up of gas, Indoor fan motor, Outdoor fan motor in BANGALORE, KARNATAKA. Quantity: 133. Submission Deadline: 25-08-2025 11: 00: 00. Download documents and apply online.
Main Document
BOQ
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
MATHURA, UTTAR PRADESH
Indian Army
NORTH 24 PARGANAS, WEST BENGAL
Indo Tibetan Border Police (itbp)
SOUTH DELHI, DELHI
Bharat Sanchar Nigam Limited Portal(bsnl)
JODHPUR, RAJASTHAN
Indian Army
JODHPUR, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Carrying out Comprehensive annual maintenance of the One and Half Ton Split AC units 121 numbers spliyt AC Units | Carrying out Comprehensive annual maintenance of the One and Half Ton Split AC units wiring ID unit to OD unit and internal wiring of AC units and support arrangement including all items in the refrigeration cycle viz compressor condenser coil condenser fan capillary tube Evaporator coil Blower and Indoor unit fan motor Thermostats and all interconnecting copper refrigerant piping etc as per the specifications or conditions of the contract and as per details given in relevant sections by deploying service staff when required including specialized man power and supplying and fixing required spares refrigerant gas tools and plants and other consumables viz compressor lubrication oil and brazing or pressure testing gases to keep the AC units and connected equipment operational upto the required standards as per the maintenance schedule detailed in the comprehensive maintenance document etc as required One and Half Ton Split AC units 121 numbers Split AC units | 24 | months | eeed1ss | 730 |
| 2 | Dual mode Power capacitor | Supplying of following spares for initial repairs of One and Half Ton SAC units including replacement of faulty spares suitable for operation on 230V 1Ph 50Hz AC supply etc the cost of fixing is included in the scope of CMC Dual mode Power capacitor | 25 | no | eeed1ss | 730 |
| 3 | Condensor fan motor capacitor | Condensor fan motor capacitor | 15 | no | eeed1ss | 730 |
| 4 | Starting Relay | Starting Relay | 15 | no | eeed1ss | 730 |
| 5 | Thermostat | Thermostat | 10 | no | eeed1ss | 730 |
| 6 | Thermostat sensor | Thermostat sensor | 10 | no | eeed1ss | 730 |
| 7 | Fan blade for outdoor unit | Fan blade for outdoor unit | 2 | no | eeed1ss | 730 |
| 8 | Blower assembly for indoor unit | Blower assembly for indoor unit | 2 | no | eeed1ss | 730 |
| 9 | PCB repairs | PCB repairs | 10 | no | eeed1ss | 730 |
| 10 | Complete Gas Charging including vacumization and pressure testing etc | Complete Gas Charging including vacumization and pressure testing etc | 6 | no | eeed1ss | 730 |
| 11 | Topping up of gas | Topping up of gas | 10 | kg | eeed1ss | 730 |
| 12 | Indoor fan motor | Indoor fan motor | 2 | no | eeed1ss | 730 |
| 13 | Outdoor fan motor | Outdoor fan motor | 2 | no | eeed1ss | 730 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC)
Additional Doc 2 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Extended Deadline
25-Aug-2025, 11:00 am
Opening Date
25-Aug-2025, 11:30 am
Sign up now to access all documents
Main Document
BOQ
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS