Open Tender for Cement Concrete cast in situ,CEMENT CONCRETE CAST IN SITU,ROOFING,ROOFING,ROOFING,FINISHING,FINISHI in KANPUR NAGAR, UTTAR PRADESH

Bid Publish Date

13-Feb-2026, 1:28 pm

Bid End Date

06-Mar-2026, 2:00 pm

EMD

₹10,000

Value

₹10,00,000

Progress

Issue13-Feb-2026, 1:28 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

2946

Category

WATER PROOFING

Bid Type

Single Packet Bid

Categories 50

Central Board Of Excise And Customs (cbec) invites bids for Cement Concrete cast in situ, CEMENT CONCRETE CAST IN SITU, ROOFING, FINISHING, DISMANTLING AND DEMOLISHING, WATER PROOFING in KANPUR NAGAR, UTTAR PRADESH. Quantity: 2946. Submission Deadline: 06-03-2026 14: 00: 00. Submit your proposal before the deadline.

Documents 4

GeM-Bidding-8977185.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Earth work,Providing and laying hand packed stone soling,Providing and laying cement concrete,Cente

Indian Council Of Agricultural Research (icar)

Posted: 4 November 2024
Closed: 26 November 2024
GEM

Concrete Work,Tile Work,Steel Poles for Boundary,Sign Board,Water Proofing Compound

Indian Army

UDHAMPUR, JAMMU & KASHMIR

Posted: 21 September 2025
Closed: 1 October 2025
GEM

Site Cleaning,Earth Work,Cement Concrete,RCC 1,RCC 2,Brick Work 1,Brick Work 2,Foundation Centering

Bharat Earth Movers Limited (beml)

SIDHI, MADHYA PRADESH

Posted: 14 June 2025
Closed: 24 June 2025
GEM

Earth Work for construction of Toilet Sets,Concrete Work for construction of Toilet Sets,Plum Concr

Indian Army

RAJAURI, JAMMU & KASHMIR

Posted: 15 December 2024
Closed: 6 January 2025
GEM

Indian Army Levelling and Construction Materials Tender DODA Jammu & Kashmir 2025 – 25% Option, EMD ₹22500

Indian Army

DODA, JAMMU & KASHMIR

Posted: 6 January 2026
Closed: 16 January 2026
GEM

Bill of Quantities (BOQ) 14 Items

Item # Title Description Quantity Unit Consignee Delivery (Days)
1 Cement Concrete cast in situ Providing and laying cement concrete in retaining walls, return walls, walls including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing. 2 cum ram.irs 15
2 CEMENT CONCRETE CAST IN SITU 1 ratio . 5 ratio 3 1 cement ration 1.5 coarse sand zone-III derived from natural sources ratio 3 graded stone aggregate 20 mm nominal size derived from natural sources. 2 cum ram.irs 15
3 ROOFING Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS 13592 Type A, including jointing with seal ring conforming to IS 5382, leaving 10 mm gap for thermal expansion, i Single socketed pipes. 110 mm diameter 90 metre ram.irs 15
4 ROOFING Providing and fixing on wall face unplasticised- PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS 13592 Type A, including jointing with seal ring conforming to IS 5382, leaving 10 mm gap for thermal expansion. Bend 87.5 degree-110 mm bend 6 each ram.irs 15
5 ROOFING Providing and fixing on wall face unplasticised- PVC moulded fittings/accessories for unplasticised Rigid PVC rain water pipes conforming to IS 13592 Type A, including jointing with seal ring conforming to IS 5382, leaving 10 mm gap for thermal expansion. Shoe Plain 6 each ram.irs 15
6 FINISHING 12 mm cement plaster of mix 1 6 , 1 cement ratio 6 coarse sand 120 sqm ram.irs 15
7 FINISHING Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade New work Two or more coats applied at the rate 1.43 ltr/10 sqm over and including priming coat of exterior primer applied at the rate 0.90 litre/10 sqm 120 sqm ram.irs 15
8 FINISHING Painting one or more coats on rain water, soil waste and vent pipes and fittings with black anticorrosive bitunnastic paint of approved brand and manufacture on old work 100 mm diameter pipes 90 metre ram.irs 15
9 DISMANTLING AND DEMOLISHING Demolishing brick tile covering in terracing including stacking of serviceable material and disposal of unserviceable material with 50 meters lead. 730 sqm ram.irs 15
10 DISMANTLING AND DEMOLISHING Demolishing mud phaska in terracing and disposal of material within 50 metres lead. 730 cum ram.irs 15
11 DISMANTLING AND DEMOLISHING Dismantling C.I. or asbestos rain water pipe with fittings and clamps including stacking the material with 50 metres lead 150 mm dia pipe 90 metre ram.irs 15
12 DISMANTLING AND DEMOLISHING Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. 120 sqm ram.irs 15
13 DISMANTLING AND DEMOLISHING Disposal of building rubbish/malba/similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved muncipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. With average thickness of 120 mm and minimum thickness at khurra as 65 mm. 110 cum ram.irs 15
14 WATER PROOFING Providing and laying integral cement based water proofing treatment including preparation of surface as required for treatment of roofs, balconies, terraces etc consisting of following operations, Applying a slurry coat of neat cement using 2.75 kg/sqm of cement admixed with water proofing compouned conforming to IS.2645 and approved by Engineer-incharge over the RCC slab including adjoining walls upto 300 mm height including cleaning the surface before treatment. b- Laying brick bats 25 mm to 115 mm size with 50 percent of cement mortar 1 ratio 5 , 1 cement ratio5 coarse sand admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge over 20 mm thick layer of cement mortar of mix 1 ratio 5 , 1 cement ratio 5 coarse sand admixed with water proofing compound conforming to IS 2645 anbd approved by Engineer-in Charge to required slope and treating similarly the adjoining walls upto 300 mm height including rounding of junctions of walls and slabs. c- After two days of proper curing applying a second coat of cement slurry using 2.75 kg/sqm of cement admixed with water proofing by Engineer-in-charge. d- Finishing the surface with 20 mm thick jointless cement mortar of mix 1 ratio 4 , 1 cemen ratio 4 coarse sand, admixed with water proofing compound conforming to IS 2645 and approved by Engineer-in-charge including laying glass fibre cloth of approved quality in top layer of plaster and finally finishing the surface with trowel with neat cement slurry and making pattern of 300x300 mm square 3 mm deep. e- The whole terrace so finished shall be flooded with water for a minimum period of two weeks for curing and for final test. All above operations to be done in order and as directed and specified by the Engineer-in-Charge. 730 sqm ram.irs 15

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

Additional Doc 1 (Requested in ATC)

6

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer