Loader bucket capacity: minimum required (as per BOQ/title) with corresponding payload
Loader bucket dump height: specified in meters
Loader payload: in kilograms
Tipping load: full turn in kilograms
Engine power: maximum kW at rated RPM
Engine cooling system and fuel type
Transmission type and number of forward/reverse gears
Cabin: FOPS and ROPS protection; air conditioning
Wheel drive type and loader bucket type
Cold start kit and operating weight in kilograms
EMD: ₹25,000
Quantity flexibility up to 25% with extended delivery
3 years govt/PSU supply experience required
OEM turnover justification required for both bidder and OEM
Payment terms are governed by government procurement norms; exact schedule not stated in the data, bidders should anticipate stage payments post delivery as per contract.
Delivery period commences from the date of original delivery order; option quantity extensions modify this period with a minimum extension of 30 days.
Not explicitly detailed in the data; bidders should assume standard LDs for late delivery per government tender norms and contract clauses.
3 years of government/PSU supply experience for similar wheel loader products
Average turnover as per last three financial years (documented by audited statements or CA certificate)
Non-liquidation and no bankruptcy filings; provide an undertaking
Quantity
1
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
No
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
13
OEM Avg. Turnover
50
Past Performance
50 %
Warranty Period
15 years
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Wheel Loaders (Q2)
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Vaishali
Delivery Pincodes
844122
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Virchandra Kumar | 844122,Nagar Parishad Mahua, Vaishali | Vaishali | Bihar | 844122 | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates showing 3 years of government/PSU supply
Audited financial statements or CA certificate for turnover (last 3 years)
OEM authorization (if bid through reseller)
Technical bid documents and bid security/EMD submission proof
Undertaking regarding non-liquidity and non-bankruptcy
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Loader Bucket Minimum Capacity (Cubic Meter) | 1.0 - 15.0 Or higher |
| Performance Parameters | Loader Bucket Dump Height (meter) | 2.0 - 10.0 Or higher |
| Performance Parameters | Loader Bucket Pay Load (kg) | 1650.0 - 10000.0 Or higher |
| Performance Parameters | Tipping Load full turn (kg) | 4500.0 - 22000.0 Or higher |
| Engine Parameters | Engine Maximum Power at Rated RPM (kW) | 55.0 - 600.0 Or higher |
| Engine Parameters | Engine Cooling System | Water Cooled / Liquid Cooled |
| Engine Parameters | Fuel Type | Diesel |
| Constructional Parameters | Type of Transmission | Fully Automatic Transmission, Power Shift Transmission, Manual Transmission Or higher |
| Constructional Parameters | Number of Forward speed Gears (Nos) | 4, 5 Or higher |
| Constructional Parameters | Number of Reverse speed Gears (Nos) | 4, 5 Or higher |
| Constructional Parameters | Cabin Protection System (FOPS and ROPS) | Yes |
| Constructional Parameters | Air Conditioning in Cabin | No |
| Constructional Parameters | Type of Wheel Drive | Two Wheel Drive, Four Wheel Drive Or higher |
| Constructional Parameters | Type of Loader Bucket | Bottom Dump Bucket |
| Constructional Parameters | Cold Start Kit | No |
| Dimensions | Operating Weight (in Kg) | 7620.0 - 110000.0 Or higher |
Key insights about BIHAR tender market
Bidders must submit GST, PAN, experience certificates showing 3 years of govt/PSU supply, and turnover proof for last 3 years. Provide EMD ₹25,000 and OEM authorizations if bidding through resellers. Ensure compliance with FOPS/ROPS and cabin AC requirements, and prepare performance parameter data for bucket capacity, power, and weight.
Submit GST certificate, PAN, audited turnover statements or CA certificate, 3-year govt/PSU supply experience letters, OEM authorization if applicable, EMD proof of ₹25,000, and technical bid documents showing compliance with specified performance and engine parameters, safety features, and transmission characteristics.
Key specs include loader bucket capacity, bucket dump height, payload (kg), tipping load, engine power (kW), engine cooling system, fuel type, transmission type, forward/reverse gears, FOPS/ROPS cabin, cabin AC, wheel drive type, bucket type, cold start kit, and operating weight (kg). Submit model data showing compliance.
EMD is ₹25,000. While exact payment terms are not detailed in the summary, bidders should expect government standard payment timelines post delivery per contract, with EMD submission required along with bid; ensure online or demand draft proof as applicable.
The purchaser may adjust quantity by up to 25% during contract; delivery period extends proportionally using a formula, with a minimum extension of 30 days. Extended time starts from the last date of the original or extended delivery period, as applicable.
OEM or its authorized reseller must have regularly manufactured and supplied the same or similar wheel loader products to Central/State Govt or PSU for 3 years prior to bid opening, with contract copies for each year.
Cabin must include FOPS and ROPS protection and be equipped with air conditioning. Ensure the loader model offers certified protection and meets ISO or equivalent safety standards for operator cabins as part of compliance.
Bid price must cover all cost components for the goods alone; no services are included. Ensure the BOM includes the loader, cabling, protection, and immediate deliverable components, with any OEM accessories clearly itemized to avoid pricing disputes later.