Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow, Uttar Pradesh. Procurement: Complete on-site detubing and re-tubing of the Main Air Ejector Condenser, including supply and installation of 902 C44300 Admiralty Brass tubes (19 mm OD, 17 mm ID, 2760 mm length). Estimated value: ₹2,302,416. EMD: ₹30,000. Location: Aligarh, Uttar Pradesh 202001. Scope covers tube preparation, controlled tube expansion, hydro and leak testing, and reassembly. The 25% quantity/duration variation clause may apply per contract terms. Unique aspect: high-precision brazed/press-fit work on large condenser components with on-site execution.
902 units of C44300 Admiralty Brass tubes
Tube dimensions: 19 mm OD, 17 mm ID, 2760 mm length
On-site detubing and retubing of Main Air Ejector Condenser
Hydrostatic/leak testing and reassembly included
Tube preparation with controlled expansion
EMD ₹30,000; BB/online submission required
Variation allowance up to 25% per contract terms
On-site execution with hydro/leak tests and reassembly
Not explicitly stated; bidders should confirm milestone-based or lump-sum payment terms with the client.
On-site detubing and retubing scope; no explicit deadline provided in the data; verify project timeline during bid submission.
Not specified; potential for performance-related penalties should be clarified with buyer at bid stage.
Experience in large-diameter condenser tubework and on-site mechanical refurbishment
Ability to supply C44300 Admiralty Brass tubes or demonstrate OEM-backed supply
Financial stability evidenced by recent financial statements
Quantity
1
Similar Category
Repair and Overhauling Service
Bid Type
Two Packet Bid
Bid Validity
120 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Tech Clarification Time
3 Days
EMD Required
Yes
MII Compliance
Yes
MSE Purchase Preference
No
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
8
Experience Required
5 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - Complete on site de tubing and re tubing of Main Air Ejector Condenser including supply of 902 Nos C44300 Admiralty Brass tubes19 mm OD 17 mm ID 2760 mm length tube preparation controlled tube exp, hydro/leak testing reassem..
Advisory Bank
State Bank of India
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Aligarh
Delivery Pincodes
202125
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Summit Chaurasia | 202125,Harduaganj Thermal Power Plant | Aligarh | Uttar Pradesh | 202125 | Project / Lumpsum Based | - | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Extended Deadline
17-Oct-2026, 1:30 pm
Opening Date
18-Oct-2026, 1:30 pm
Extended Deadline
12-Oct-2026, 1:30 pm
Opening Date
13-Oct-2026, 1:30 pm
Extended Deadline
08-Oct-2026, 1:30 pm
Opening Date
09-Oct-2026, 1:30 pm
Extended Deadline
03-Oct-2026, 1:30 pm
Opening Date
04-Oct-2026, 1:30 pm
Discover companies most likely to bid on this tender
GST Registration Certificate
Permanent Account Number (PAN) Card
Experience certificates for similar on-site condenser tubework
Financial statements/balance sheet (last 2-3 years)
EMD submission proof (DD/online payment receipt)
Technical bid documents detailing approach to detubing, retubing, testing
OEM authorization for C44300 Admiralty Brass tubes (if applicable)
Any prior project completion certificates related to large-diameter condenser work
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD ₹30,000, plus technical bid detailing detubing, retubing, hydro testing, and reassembly for the Main Air Ejector Condenser using 902 C44300 Admiralty Brass tubes (19 mm OD, 17 mm ID, 2760 mm). Ensure ATC compliance and OEM authorizations if available.
Submit GST certificate, PAN, experience certificates for condenser work, financial statements, EMD receipt, technical bid, and OEM authorization for C44300 tubes if applicable; also provide project references for similar on-site detubing/re-tubing projects.
Tubing specification includes C44300 Admiralty Brass, 19 mm OD, 17 mm ID, 2760 mm length. Tubes must be supplied on-site for detubing and retubing procedures, with controlled expansion and hydro-leak testing as part of final assembly.
EMD amount is fixed at ₹30,000; submit proof of online or DD payment with the bid; ensure submission aligns with the buyer’s ATC terms and tender opening schedule published in the ATC document.
The contract allows up to 25% variation in quantity or duration at the time of contract issue, with further scope expansion possible upon provider consent; bid should account for potential expansion in planning and pricing.
Required hydrostatic testing and leak testing post-reassembly; ensure test procedures align with on-site safety and quality controls; document test results in the final commissioning report.
Bidders should reference Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) in Lucknow, for work in Aligarh, Uttar Pradesh; align proposal with energy department standards and on-site utility maintenance practices.
Demonstrable experience in large condenser tubework, ability to supply 902 C44300 tubes, valid GST/PAN, financial health evidence, and demonstrated on-site detubing/re-tubing capability; ensure OEM authorizations if required by the buyer terms.