TenderDekho Logo
Active GEM

Bids are Invited For G1_1_BENCH TYPE DRILLING MACHINE,G1_2_BENCH GRINDING MACHINE,G1_3_BENCH VICE 150MM,G1_4_TURNING TOO in KOLKATA, WEST BENGAL

Bid Publish Date

17-Jul-2026, 1:42 pm

Bid End Date

07-Aug-2026, 2:00 pm

EMD

₹75,000

Location

KOLKATA , WEST BENGAL

Progress

Issue17-Jul-2026, 1:42 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

3073

Category

G1_1_BENCH TYPE DRILLING MACHINE

Bid Type

Two Packet Bid

Categories 43

A tender has been published for Garden Reach Ship Builders And Engineers Limited (grse) G1_1_BENCH TYPE DRILLING MACHINE, G1_2_BENCH GRINDING MACHINE, G1_3_BENCH VICE 150MM, G1_4_TURNING TOO in KOLKATA, WEST BENGAL. Quantity: 3073 by. Submission Deadline: 07-08-2026 14: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

18

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

30

Delivery Locations

1

Delivery Cities

Kolkata

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-KolkataKolkata--430-

Authority Records

MINISTRY OF DEFENCEDEFENCE PRODUCTION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 8

GeM-Bidding-9621681.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 85 Items Sign in for GEM prices

#1

G1_1_BENCH TYPE DRILLING MACHINE

BENCH TYPE DRILLING MACHINE

4 st Delivery: 30 days
#2

G1_2_BENCH GRINDING MACHINE

BENCH GRINDING MACHINE

8 st Delivery: 30 days
#3

G1_3_BENCH VICE 150MM

BENCH VICE 150MM

8 st Delivery: 30 days
#4

G1_4_TURNING TOOL _CARBIDE TIP HSS

TURNING TOOL (CARBIDE TIP HSS)

8 st Delivery: 30 days
#5

G1_5_FACING TOOL _CARBIDE TIP HSS

FACING TOOL (CARBIDE TIP HSS)

8 st Delivery: 30 days
#6

G1_6_KNURLING TOOL

KNURLING TOOL

8 st Delivery: 30 days
#7

G1_7_THREADING TOOL EXTERNAL

THREADING TOOL EXTERNAL

8 st Delivery: 30 days
#8

G1_8_PARTING TOOL _HIGH SPEED STEEL TOOLS

PARTING TOOL (HIGH SPEED STEEL TOOLS)

8 st Delivery: 30 days
#9

G1_9_DRILLING TOOL

DRILLING TOOL

8 st Delivery: 30 days
#10

G1_10_BORING TOOL

BORING TOOL

8 st Delivery: 30 days
#11

G1_11_REAMER _STRAIGHT, TUNGSTEN CARBIDE

REAMER (STRAIGHT, TUNGSTEN CARBIDE)

8 st Delivery: 30 days
#12

G1_12_THREADING TOOL INTERNAL

THREADING TOOL INTERNAL

8 st Delivery: 30 days
#13

G1_13_JOB CENTERING TOOL WITH MAGNETIC STAND

JOB CENTERING TOOL WITH MAGNETIC STAND

8 st Delivery: 30 days
#14

G1_14_MINIATURE CNC LATHE

MINIATURE CNC LATHE

4 st Delivery: 30 days
#15

G1_15_METAL CUTTING POWER SAW

METAL CUTTING POWER SAW

4 st Delivery: 30 days
#16

G1_16_JIGS AND FIXTURE FOR LATHE

JIGS AND FIXTURE FOR LATHE

4 st Delivery: 30 days
#17

G1_17_DRILL BIT FOR DRILLING MACHINE

DRILL BIT FOR DRILLING MACHINE

4 st Delivery: 30 days
#18

G1_18_DRILL CHUCK FOR DRILLING MACHINE

DRILL CHUCK FOR DRILLING MACHINE

4 st Delivery: 30 days
#19

G1_19_GRINDING WHEELS

GRINDING WHEELS

8 st Delivery: 30 days
#20

G1_20_SAW BLADE

SAW BLADE

4 ea Delivery: 30 days
#21

G2_21_TURNING TOOL CARBIDE TIP HSS

TURNING TOOL (CARBIDE TIP HSS)

8 st Delivery: 30 days
#22

G2_22_FACING TOOL CARBIDE TIP HSS

FACING TOOL (CARBIDE TIP HSS)

8 st Delivery: 30 days
#23

G2_23_KNURLING TOOL

KNURLING TOOL

8 st Delivery: 30 days
#24

G2_24_THREADING TOOL EXTERNAL

THREADING TOOL EXTERNAL

8 st Delivery: 30 days
#25

G2_25_PARTING TOOL HIGH SPEED STEEL TOOLS

PARTING TOOL (HIGH SPEED STEEL TOOLS)

8 st Delivery: 30 days
#26

G2_26_DRILLING TOOL

DRILLING TOOL

8 st Delivery: 30 days
#27

G2_27_BORING TOOL

BORING TOOL

8 st Delivery: 30 days
#28

G2_28_REAMER STRAIGHT, TUNGSTEN CARBIDE

REAMER (STRAIGHT, TUNGSTEN CARBIDE)

8 st Delivery: 30 days
#29

G2_29_THREADING TOOL INTERNAL

THREADING TOOL INTERNAL

8 st Delivery: 30 days
#30

G2_30_JOB CENTERING TOOL WITH MAGNETIC STAND

JOB CENTERING TOOL WITH MAGNETIC STAND

8 st Delivery: 30 days
#31

G2_31_JIGS AND FIXTURE FOR LATHE

JIGS AND FIXTURE FOR LATHE

4 st Delivery: 30 days
#32

G3_32_S.S PAD LOCK-5 LEVERS AND KEY

S.S PAD LOCK-5 LEVERS & KEY

1,800 ea Delivery: 30 days
#33

G3_33_3-8 INCHES BSP PR. GAUGE_DIAL 100MM_1 TO10 BAR

3/8 INCHES BSP PR. GAUGE_DIAL 100MM_1 TO10 BAR

6 ea Delivery: 30 days
#34

G3_34_3-8 INCHES BSP PR. GAUGE_DIAL 100MM_1 TO16 BAR

3/8 INCHES BSP PR. GAUGE_DIAL 100MM_1 TO16 BAR

3 kg Delivery: 30 days
#35

G3_35_BELLOW METLLIC - DIA 125 DIA

BELLOW METLLIC - DIA 125 DIA

3 ea Delivery: 30 days
#36

G3_36_HOSE ASSY GASOLINE ARMOURED 2 INCHES x 8.5 FEET

HOSE ASSY GASOLINE ARMOURED 2 INCHES x 8.5 FEET

3 ea Delivery: 30 days
#37

G3_37_TEFLON RODS_VARIOUS DIA_20MM,50MM,80 MM

TEFLON RODS_VARIOUS DIA(20MM,50MM,80 MM)

1 st Delivery: 30 days
#38

G3_38_Teflon tape

Teflon tape

67 ea Delivery: 30 days
#39

G3_39_THERMOMETER _RINGS 5DEG C- 95 DEG C

THERMOMETER (RINGS 5DEG C- 95 DEG C)

14 kg Delivery: 30 days
#40

G3_40_PLSTC STORGE BOTTLE_LUB OIL_OIL SAMPLING

PLSTC STORGE BOTTLE_LUB OIL_OIL SAMPLING

33 ea Delivery: 30 days
#41

G3_41_PLSTC STORGE BOTTLE_LUB OIL_FUEL SAMPLNG

PLSTC STORGE BOTTLE_LUB OIL_FUEL SAMPLNG

33 ea Delivery: 30 days
#42

G3_42_TINTED GLASS STORAGE BOTTLES _1LTRAVCAT

TINTED GLASS STORAGE BOTTLES (1LTR)AVCAT

17 ea Delivery: 30 days
#43

G3_43_GLASS STORAGE BOTTLE FOR LUB OIL

GLASS STORAGE BOTTLE FOR LUB OIL

17 ea Delivery: 30 days
#44

G3_44_BLANKS FOR FIREMAIN PUMPS 150TPH

BLANKS FOR FIREMAIN PUMPS 150TPH

2 ea Delivery: 30 days
#45

G3_45_BLANKS_SEA WATER COOLING PUMP 250TPH

BLANKS_SEA WATER COOLING PUMP 250TPH

1 ea Delivery: 30 days
#46

G3_46_BLANKS FOR AC SEA WATER PUMPS

BLANKS FOR AC SEA WATER PUMPS

1 ea Delivery: 30 days
#47

G3_47_BLANKS FOR AC CHILLED WATER PUMPS

BLANKS FOR AC CHILLED WATER PUMPS

1 ea Delivery: 30 days
#48

G3_48_BATTERY FOR TORCHES _BIG

BATTERY FOR TORCHES (BIG)

10 ea Delivery: 30 days
#49

G3_49_BATTERY FOR TORCHES _SMALL

BATTERY FOR TORCHES (SMALL)

20 ea Delivery: 30 days
#50

G3_50_SNAP ON FOR REPLCEMNT EAR PLUG_GLASS40-1

SNAP ON FOR REPLCEMNT EAR PLUG_GLASS40-1

66 ea Delivery: 30 days
#51

G3_51_STEEL PUTIY

STEEL PUTIY

2 ea Delivery: 30 days
#52

G3_52_VALVOLINE PREMIUM BLUE 7800 PLUS DE OIL

VALVOLINE PREMIUM BLUE 7800 PLUS DE OIL

66 l Delivery: 30 days
#53

G3_53_DYSON V11 ABSOLUTE PRO W- BATTERY AND ACCES.

DYSON V11 ABSOLUTE PRO W/ BATTERY&ACCES.

1 ea Delivery: 30 days
#54

G3_54_TARPAULIN COVER FOR GT,DA INTAKE AND EXHAUST

TARPAULIN COVER FOR GT,DA INTAKE&EXHAUST

2 st Delivery: 30 days
#55

G3_55_REFRIGERANT REMOVAL KIT

REFRIGERANT REMOVAL KIT

2 st Delivery: 30 days
#56

G3_56_100 NB Rubber Bellow

100 NB Rubber Bellow

6 ea Delivery: 30 days
#57

G3_57_125 NB Rubber Bellow

125 NB Rubber Bellow

8 ea Delivery: 30 days
#58

G3_58_STRAINR ELEMNT_200NB_90-10 CUNI,MESH 6MM

STRAINR ELEMNT_200NB_90/10 CUNI,MESH 6MM

1 ea Delivery: 30 days
#59

G3_59_STRAINR ELEMNT_150NB_90-10 CUNI,MESH 6MM

STRAINR ELEMNT_150NB_90/10 CUNI,MESH 6MM

1 ea Delivery: 30 days
#60

G3_60_STRAINR ELEMNT_100NB_90-10 CUNI,MESH 6MM

STRAINR ELEMNT_100NB_90/10 CUNI,MESH 6MM

1 ea Delivery: 30 days
#61

G3_61_STRAINER ELEMNT_80NB_90-10 CUNI,MESH 6MM

STRAINER ELEMNT_80NB_90/10 CUNI,MESH 6MM

1 ea Delivery: 30 days
#62

G3_62_STRAINER ELEMNT_50NB_90-10 CUNI,MESH 6MM

STRAINER ELEMNT_50NB_90/10 CUNI,MESH 6MM

1 ea Delivery: 30 days
#63

G3_63_STRAINER ELEMNT_40NB_90-10 CUNI,MESH 6MM

STRAINER ELEMNT_40NB_90/10 CUNI,MESH 6MM

1 ea Delivery: 30 days
#64

G3_64_STRAINR ELEMNT FOR 200NB_SS 316,MESH 100

STRAINR ELEMNT FOR 200NB_SS 316,MESH 100

1 ea Delivery: 30 days
#65

G3_65_STRAINER ELEMNT FOR 100NB_MONEL,MESH 100

STRAINER ELEMNT FOR 100NB_MONEL,MESH 100

1 ea Delivery: 30 days
#66

G3_66_STRAINER ELEMNT FOR 80NB_SS 316,MESH 200

STRAINER ELEMNT FOR 80NB_SS 316,MESH 200

1 ea Delivery: 30 days
#67

G3_67_STRAINER ELEMENT FOR 32NB_MONEL,MESH 200

STRAINER ELEMENT FOR 32NB_MONEL,MESH 200

1 ea Delivery: 30 days
#68

G3_68_STRAINER ELEMENT FOR 65NB_MONEL,MESH 200

STRAINER ELEMENT FOR 65NB_MONEL,MESH 200

1 ea Delivery: 30 days
#69

G3_69_STRAINER ELEMENT FOR 50NB_MONEL,MESH 100

STRAINER ELEMENT FOR 50NB_MONEL,MESH 100

1 ea Delivery: 30 days
#70

G3_70_STRAINER ELEMENT FOR 65NB_MONEL,MESH 100

STRAINER ELEMENT FOR 65NB_MONEL,MESH 100

1 ea Delivery: 30 days
#71

G3_71_STRAINER ELEMENT FOR 50 NB Y-TYPE_MONEL

STRAINER ELEMENT FOR 50 NB Y-TYPE_MONEL

1 ea Delivery: 30 days
#72

G3_72_STRAINER ELEMENT FOR 65NB_MONEL,MESH 100

STRAINER ELEMENT FOR 65NB_MONEL,MESH 100

1 ea Delivery: 30 days
#73

G3_73_200 NB Rubber Bellow

200 NB Rubber Bellow

18 ea Delivery: 30 days
#74

G3_74_65 NB Corrugated PVC Green Hose

65 NB Corrugated PVC Green Hose

19 ea Delivery: 30 days
#75

G3_75_10 NB Rubber Hose

10 NB Rubber Hose

20 ea Delivery: 30 days
#76

G3_76_Jubilee Clips of Size 150mm.

Jubilee Clips of Size 150mm.

100 ea Delivery: 30 days
#77

G3_77_Jubilee Clips of Size 200mm.

Jubilee Clips of Size 200mm.

50 ea Delivery: 30 days
#78

G3_78_Metallic Bellow, 65 dia, 400mm

Metallic Bellow, 65 dia, 400mm

6 ea Delivery: 30 days
#79

G3_79_Metallic Bellow, 32 dia, 350mm

Metallic Bellow, 32 dia, 350mm

2 ea Delivery: 30 days
#80

G3_80_Metallic Bellow, 40 dia, 350mm

Metallic Bellow, 40 dia, 350mm

4 ea Delivery: 30 days
#81

G3_81_STRAINR ELEMNT FOR 150NB_SS 316,MESH 200

STRAINR ELEMNT FOR 150NB_SS 316,MESH 200

1 ea Delivery: 30 days
#82

G3_82_BELLOW METLLIC - DIA 40 DIA

BELLOW METLLIC - DIA 40 DIA

12 st Delivery: 30 days
#83

G3_83_2000X1000X10 MM THK SERRATED RUBBER MATS

2000X1000X10 MM THK SERRATED RUBBER MATS

125 ea Delivery: 30 days
#84

G3_84_1000X1000X10 MM THK SERRATED RUBBER MATS

1000X1000X10 MM THK SERRATED RUBBER MATS

100 ea Delivery: 30 days
#85

G3_85_PVC DOOR MAT _COMMERCIAL

PVC DOOR MAT (COMMERCIAL)

200 ea Delivery: 30 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Certificate (Requested in ATC)

2

Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria

3

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer