TenderDekho Logo
Active GEM

Gail India Limited metering skid procurement Tender 2026 India - Ex works price incl GST for MR A.1/A.2 with 25% option, EMD ₹1,199,000

Bid Publish Date

22-Sep-2026, 4:28 pm

Bid End Date

21-Oct-2026, 3:00 pm

EMD

₹11,99,000

Generate Docs

Progress

Issue22-Sep-2026, 4:28 pm
Corrigendum13-Oct-2026
AwardPending

Tender Overview

Gail India Limited invites bids for the procurement of metering skid MR No. A.1 and A.2 with ex works price including charges, GST, inland transport, and supervision charges as per Clause K iii sections II of the tender. The procurement is structured with two MR numbers and includes ex works, transport, and supervision components. The estimated value is not disclosed; however, the tender specifies an EMD of ₹1,199,000. A key differentiator is the option clause enabling +/- 25% quantity adjustments at contracted rates, and delivery timing aligned to the last delivery order date. Unique aspects include charging and supervision breakdown by MR number and the presence of uploaded ATC and specification volumes. This tender targets suppliers capable of handling multi-component pricing and integration with Gail’s project framework. Tender in India procurement context relies on Volumes I & II and the “OPTION CLAUSE” guidance.

Technical Specifications & Requirements

  • No standalone technical specs in the data provided; references exist to BOQ Volumes I & II with ATC uploaded.
  • Pricing structure includes: Ex works price incl GST for MR No. A.1 and A.2, Inland transport charges, and Supervision charges as per Clause K iii.
  • Emphasis on compliance with tender documents uploaded under buyer terms; Section II Clause K iii outlines breakups by MR number.
  • Absent explicit SKUs, ensure alignment with Gail India Limited metering skid requirements and contractual pricing.
  • Ensure readiness for supplier's ATC/Specification documentation and OEM authorization if required.

Terms, Conditions & Eligibility

  • EMD: ₹1,199,000 (required as bid security).
  • Optional quantity: +25% or -25% adjustment at contract initiation or during currency.
  • Delivery period linked to the last date of original delivery order; time extension rules defined by option clause.
  • Must comply with uploaded ATC and complete VOL I & II tender documents; no generic statements.
  • The bidder must adhere to Section II terms and any amendments in the bidder-specified ATC document.
  • No tender ID or dates are to be included in communications beyond the official channels.

Key Specifications

    • No explicit technical specifications provided in the data; rely on BOQ VOL I & II and uploaded ATC
    • Pricing components: Ex works price incl GST for MR No. A.1 and A.2
    • Delivery scope: Inland transportation and Supervision charges as per Clause K iii
    • Quantity flexibility: up to 25% increase/decrease as per option clause
    • Documentation: compliance with uploaded ATC and tender volumes

Terms & Conditions

  • EMD of ₹1,199,000 required to participate

  • Quantity may be adjusted ±25% during contract at contracted rates

  • Delivery timeline calculated from the last date of the original delivery order

  • Ex works price includes GST, with separate inland transport and supervision charges

  • bidders must follow uploaded ATC and VOL I & II tender documents

Important Clauses

Payment Terms

Payment terms aligned with contract delivery milestones and ATC; no specific percentages provided in data

Delivery Schedule

Delivery period begins from the last date of original delivery order; extension rules governed by option clause

Penalties/Liquidated Damages

Not specified in the provided data; refer to uploaded ATC for LD terms

Bidder Eligibility

  • Experience in supplying metering skid components or related pressure/flow equipment

  • Financial capacity to mobilize ₹1,199,000 EMD and project-related costs

  • Compliance with ISI/ISO-like standards or Gail Group internal standards as per ATC

Advertisement

Tender Data

Bid Details

Quantity

44

Category

Ex works price incl charges as per Clause K iii a of Section II of tender incl. GST for metering skid MR No. A.1

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

Yes

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Ex works price incl charges as per Clause K iii a of Section II of tender incl. GST for metering skid MR No. A.1 , Inland transportation and other charges as per Clause K iii b of Section II of tender incl. GST for metering skid MR No. A.1 , Supervision charges as per Clause K iii c of Section II of tender incl. GST for metering skid MR No. A.1.1 , Ex works price incl charges as per Clause K iii a of Section II of tender incl. GST for metering skid MR No. A.2 , Inland transportation and other charges as per Clause K iii b of Section II of tender incl. GST for metering skid MR No. A.2 , Supervision charges as per Clause K iii c of Section II of tender incl. GST for metering skid MR No. A.2.1

Advisory Bank

State Bank of India

ePBG Percentage

5%

ePBG Duration (Months)

35

Payment Timelines

Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Pre-Bid & Qualification

Pre-Bid Date

29-09-2026 11:00:00

Pre-Bid Venue

Video call link: https://meet.google.com/cyq-svwc-twm

Delivery Details

Max Delivery Days

240

Delivery Locations

1

Delivery Cities

Gautam Buddha Nagar

Delivery Pincodes

201301

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Amit Raj201301,B - 35 & 36, Jubilee Tower, Gail (India) Limited, Sector - 1, NoidaGautam Buddha NagarUttar Pradesh2013011240-

Authority Records

MINISTRY OF PETROLEUM AND NATURAL GASGAIL INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9917079.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Organization

Gail India Limited

Office Name

Noida

Grievance Contact

[email protected]

Corrigendum Updates

2 Updates
#1

Update

13-Oct-2026
#2

Update

13-Oct-2026

Extended Deadline

21-Oct-2026, 9:30 am

Opening Date

22-Oct-2026, 9:30 am

Advertisement

Bill of Quantities (BOQ) 6 Items Sign in for GEM prices

#1

Ex works price incl charges as per Clause K iii a of Section II of tender incl. GST for metering skid MR No. A.1

Ex works price incl charges as per Clause K iii a of Section II of tender incl. GST for metering skid MR No. A.1

1 nos Delivery: 240 days
#2

Inland transportation and other charges as per Clause K iii b of Section II of tender incl. GST for metering skid MR No. A.1

Inland transportation and other charges as per Clause K iii b of Section II of tender incl. GST for metering skid MR No. A.1

1 nos Delivery: 240 days
#3

Supervision charges as per Clause K iii c of Section II of tender incl. GST for metering skid MR No. A.1.1

Supervision charges as per Clause K iii c of Section II of tender incl. GST for metering skid MR No. A.1.1

20 man days Delivery: 240 days
#4

Ex works price incl charges as per Clause K iii a of Section II of tender incl. GST for metering skid MR No. A.2

Ex works price incl charges as per Clause K iii a of Section II of tender incl. GST for metering skid MR No. A.2

1 nos Delivery: 240 days
#5

Inland transportation and other charges as per Clause K iii b of Section II of tender incl. GST for metering skid MR No. A.2

Inland transportation and other charges as per Clause K iii b of Section II of tender incl. GST for metering skid MR No. A.2

1 nos Delivery: 240 days
#6

Supervision charges as per Clause K iii c of Section II of tender incl. GST for metering skid MR No. A.2.1

Supervision charges as per Clause K iii c of Section II of tender incl. GST for metering skid MR No. A.2.1

20 man days Delivery: 240 days

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for similar metering skid projects

4

Financial statements (last 2-3 years)

5

EMD payment proof (₹1,199,000) via online or bank DD

6

Technical bid documents demonstrating compliance with ATC

7

OEM authorization / dealer authorization (if applicable)

8

Any previously executed contract copies for reference

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid for Gail India metering skid tender in India 2026?

Bidders must meet eligibility criteria including prior experience with metering skid components, provide GST registration and PAN, furnish financial statements, and submit EMD of ₹1,199,000. Ensure compliance with ATC and VOL I & II, and upload OEM authorizations if required. Follow the option clause for quantity adjustments up to 25%.

What documents are required for Gail metering skid procurement 2026?

Required documents include GST certificate, PAN card, experience certificates for similar projects, financial statements, EMD payment proof, technical bid documents demonstrating ATC compliance, and OEM authorization if applicable. Ensure submission aligns with tender ATC and VOL I & II instructions.

What are the payment terms for Gail skid supply contract 2026?

Payment terms are defined in the uploaded ATC; typically linked to delivery milestones. Bidders should review the ATC for exact terms, including any advance payment, milestone payments, and documentation required for progress payments after each delivery order.

What is the EMD amount for Gail metering skid tender 2026?

The EMD amount for participation is ₹1,199,000, payable as per the tender’s payment mode. Ensure the EMD is valid through the bid submission and is credited to the correct authority per the ATC instructions.

What is the scope of price components in this tender?

The scope includes ex works price incl GST for MR No. A.1 and A.2, plus Inland transport charges and supervision charges as per Clause K iii of Section II. The option clause allows +/- 25% quantity variation at the contracted rates.

What should bidders know about the option clause in this tender?

Bidders should plan for potential quantity changes up to ±25% at contract rates, with delivery extensions calculated from the last delivery order date. Ensure pricing is structured to accommodate additional or reduced orders without renegotiation.

Where can I find the ATC and specification documents for this tender?

ATC and specification documents are uploaded under the Tender’s Buyer Added terms and Volumes I & II. Bidders must review the ATC carefully and ensure all technical and contractual clauses are complied with before submission.

When is the delivery period for the Gail metering skid procurement?

Delivery period is tied to the last date of the original delivery order, with possible extensions under the option clause. Refer to the ATC for any fixed milestones or interim delivery dates and ensure capacity to meet them.

Advertisement