Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited wagon tippler maintenance tender Lucknow UP - ISMS/IS 550/AAA TRTL 2026
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
SONBHADRA, UTTAR PRADESH
Bid Publish Date
20-Feb-2026, 5:42 pm
Bid End Date
10-Mar-2026, 6:00 pm
EMD
₹34,000
Value
₹17,21,109
Location
Progress
Quantity
998
Category
Alignment of motors of wagon tippler
Bid Type
Two Packet Bid
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow, invites bids for comprehensive rail replacement and wagon tippler maintenance work at Sonbhadra, Uttar Pradesh (231205). The scope spans 66 BOQ items including replacement and alignment of rails, gears, gears assemblies, bushings, tanks, and related mechanical components for wagon tipplers, with an estimated contract value of ₹1,721,109.00 and an EMD of ₹34,000. Bidder qualifications are shaped by a flexible quantity clause allowing up to 25% variation, and the delivery schedule is tied to the last delivery order date, with extended time rules. The tender is distinguished by extensive on-site fabrication, alignment, and reconditioning of critical tippler assemblies, framed within the energy infrastructure maintenance context.
BOQ comprises 66 items focusing on rail replacement, gear assemblies, alignment, grouting, fabrication, and repair of wagon tippler components
Estimated value ₹1,721,109.00 indicates a mid-scale refurbishment and maintenance scope
EMD ₹34,000 denotes financial bid security for participation
Option clause allows +/-25% quantity change with proportionate delivery extension
EMD and estimated value clearly defined; participate with compliant security deposit
Flexible quantity clause enabling up to 25% variation during and after contract
Delivery period linked to last order date with calculable extension rules
Not disclosed in provided data; bidders should review ATC for payment schedule and milestones.
Delivery starts from the last date of the original delivery order; option clause may extend delivery period with calculated time based on quantity variation.
Not specified in the data; verify ATC for LD, penalties, and performance bonds in the final bid document.
Experience in heavy mechanical fabrication and rail maintenance projects
Financial capability to mobilize resources for an ₹1.72 million contract
Compliance with bidder documentation: GST, PAN, EMD submission, and technical bids
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repl of main rails and raising of rails , Tightening, repl. of all bolts, clits. , Repl,Re fixing of bushes , Repl of spur gear assembly , Repl of rack pinion , OH of reduction gear box , Replacement of sector gear , Alignment, grouting of tippling base rollers , Repl,repairing of hopper grill , Alignment of tipplers , Repl,repairing of Outboard Stool , Dismantling,repl of top pivot housing , Repl of Wooden block , Matching of teeth of sector gear , Re-fixing lock lever , Repl of top stop locking gears assly , Side beam fixing of tippler , Alignment of motors of wagon tippler , Servicing of spray line valve Size 4 Inch , Servicing of spray line valve size 3 Inch , Servicing of spray line valve Size 2 Inch , OH of overhead spray pumps , Servicing of spray nozzles , Lifting, proper fixing of VF tray , Changing, fixing of side packing , To provide the patches , Repl of plates of vf tray, chutes , Removal of foreign , Fillings oil in gear box , Servocoating,Tightening, repl of damaged bolts , Greasing of all the nipple point , Repl of break shoe liner , Repl of main Rail Beam of wagon Tippler , Provision of backup in main Rail Beam , Work on central platform , Repairing of main rail beam , Repairing of Rollers of coal spill plates , Fab, erection of back support of VF mouth chute , Fab., Installing of VF tray supports , Repl of coal spill plate , Repairing of pit platform of main rail beam , Repl of damaged beam of VF , Repairing of counter balance beam , Repairing of MDU base structure , Repairing of damaged split spur gear , Fab., of mouth piece of VF , Erection of new fabricated mouth piece of VF , OH of hoisting system , OH of hopper spray pump, line , Provision of hopper liners, in coal hopper of VF , Fab. erection of coal hopper partition stool , Raising and re-fixing of mouth piece of coal liner chute of VF , Repl of back,side plate of mouth piece , To attend the coal leakage from top mouth piece , Re-fixing,repositioning of side and back supports , Repairing,reposition of side guards of mouth piece , Repl of buffer block and buffer pads of counter balance beam , Repl of brake drum of thruster brake assly , Repl of input,output,intermediate pinion of gear box , Fab. and erection of counter balance beam , Repairing of wagon tippler plate form by cutting and welding , Removing the fallen loaded wagon in pit , Inserting the side beam pins in bracket , Dismantling,removing the broken shafts of Wagon Tippler , Installation of drive and adjacent intermediate shaft , Cutting, fabricated and installation of resting outer rail beam bottom plate
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
SONBHADRA, UTTAR PRADESH
Indian Army
MUMBAI, MAHARASHTRA
Indian Army
Indian Army
AMRITSAR, PUNJAB
Indian Army
AMRITSAR, PUNJAB
Tender Results
Loading results...
Repl of main rails and raising of rails
Replacement of main rails and raising of rails as and when required
Tightening, repl. of all bolts, clits.
Tightening of all bolts and replacement of clits of main rail.
Repl,Re fixing of bushes
Replacement/Re-fixing of bushes of Wagon Tippler
Repl of spur gear assembly
Replacement of spur gear assembly by new one/repaired one of Wagon Tippler
Repl of rack pinion
Replacement of rack pinion of wagon tippler/rigid coupling set of Wagon tippler/ shaft of Wagon Tippler
OH of reduction gear box
Overhauling of reduction gear box of tippler
Replacement of sector gear
Replacement of sector gear (rack segment) of wagon tippler
Alignment, grouting of tippling base rollers
Alignment, grouting of tippling base rollers after lifting the tippling table base plate of Wagon tippler
Repl,repairing of hopper grill
Replacement/repairing of hopper grill (one grill) of Wagon tippler
Alignment of tipplers
Alignment of tipplers
Repl,repairing of Outboard Stool
Replacement/repairing of Outboard Stool of Wagon tippler
Dismantling,repl of top pivot housing
Dismantling & replacement of top pivot housing of wagon tippler
Repl of Wooden block
Replacement of Wooden block of Wagon tippler
Matching of teeth of sector gear
Matching of teeth of sector gear & rack pinion at both end
Re-fixing lock lever
Re-fixing lock lever after repair/replacement of lock lever bush and pin of Wagon tippler table locking assembly
Repl of top stop locking gears assly
Replacement of top stop locking gears assembly by new one/repaired one
Side beam fixing of tippler
Side beam fixing of tippler
Alignment of motors of wagon tippler
Alignment of motors of wagon tippler along with replacement of their coupling bolts and rubber bushes etc
Servicing of spray line valve Size 4 Inch
Servicing of spray line valve Size 4 inch
Servicing of spray line valve size 3 Inch
Servicing of spray line valve size 3 inch
Servicing of spray line valve Size 2 Inch
Servicing of spray line valve Size 2 inch
OH of overhead spray pumps
Overhauling of overhead spray pumps
Servicing of spray nozzles
Servicing of spray nozzles of each lines of spray system of Wagon tippler
Lifting, proper fixing of VF tray
Lifting tray & proper fixing of vibrating feeder tray after adjusting/replacement of its rubber pads
Changing, fixing of side packing
Changing of side packing and proper fixing to avoid coal leakage
To provide the patches
To provide the patches on leakage points in different chutes of Wagon tippler
Repl of plates of vf tray, chutes
Replacement of liner plates, mother plate of different thickness of VF, Chutes
Removal of foreign
Removal of foreign M.S. Plate which struck into the chute of vibrating feeder & hopper after gas cutting or by utilizing cutting electrode
Fillings oil in gear box
Fillings oil in gear box of Wagon tippler
Servocoating,Tightening, repl of damaged bolts
Tightening & replacement of damaged bolts of all rack segment fitted rack, couplings & bush housing along with application of servo coat on spur gear rack and pinion
Greasing of all the nipple point
Greasing of all the nipple points of wagon tippler
Repl of break shoe liner
Replacement of break shoe liner of wagon tippler
Repl of main Rail Beam of wagon Tippler
Replacement of main Rail Beam of wagon Tippler by repaired Beam
Provision of backup in main Rail Beam
Provision of backup and seats in inner side of main Rail Beam of wagon Tippler
Work on central platform
Work on central platform of wagon tippler
Repairing of main rail beam
Repairing of main rail beam of wagon Tippler
Repairing of Rollers of coal spill plates
Repairing of Rollers of coal spill plates of wagon tippler
Fab, erection of back support of VF mouth chute
Fabrication & erection of back support of mouth chute of V.F.
Fab., Installing of VF tray supports
Fabricating & Installing of vibrating feeder tray supports (1A,1B,2A,2B)
Repl of coal spill plate
Replacement of coal spill plate of wagon Tippler
Repairing of pit platform of main rail beam
Repairing of pit platform of main rail beam of wagon tippler
Repl of damaged beam of VF
Replacement of damaged beam of vibrating feeder floor 1A,1B, 2A, 2B
Repairing of counter balance beam
Repairing of counter balance beam of wagon tippler
Repairing of MDU base structure
Repairing of base structure of main drive unit of wagon tippler
Repairing of damaged split spur gear
Repairing of damaged split spur gear
Fab., of mouth piece of VF
Fabrication of mouth piece of vibrating feeder 1A, 1B, 2A, 2B
Erection of new fabricated mouth piece of VF
Erection of new fabricated mouth piece of vibrating feeder 1A, 1B, 2A, 2B
OH of hoisting system
Overhauling of hoisting system of wagon tippler No. 1,2,3, & 4
OH of hopper spray pump, line
Overhauling of hopper spray pump & line
Provision of hopper liners, in coal hopper of VF
Provision of hopper liners in coal hopper of vibrating feeder 1A,1B, 2A,2B
Fab. erection of coal hopper partition stool
Fabrication, erection of coal hopper partition stool of wagon tippler by 12mm,10mm,8mm plate
Raising and re-fixing of mouth piece of coal liner chute of VF
Raising and re-fixing of mouth piece of coal liner chute of vibrating feeder
Repl of back,side plate of mouth piece
Replacement of back/side plate of mouth piece
To attend the coal leakage from top mouth piece
To attend the coal leakage from top mouth piece
Re-fixing,repositioning of side and back supports
Re-fixing/repositioning of side and back supports
Repairing,reposition of side guards of mouth piece
Repairing/reposition of side guards of mouth piece
Repl of buffer block and buffer pads of counter balance beam
Replacement of buffer block and buffer pads of counter balance beam of wagon tippler
Repl of brake drum of thruster brake assly
Replacement of brake drum of thruster brake assembly
Repl of input,output,intermediate pinion of gear box
Replacement of input/output/intermediate pinion of gear box of wagon tippler
Fab. and erection of counter balance beam
Fabrication and erection of counter balance beam of wagon tippler
Repairing of wagon tippler plate form by cutting and welding
Repairing of wagon tippler plate form by cutting and welding
Removing the fallen loaded wagon in pit
Removing the fallen loaded wagon in pit of Wagon Tippler
Inserting the side beam pins in bracket
Inserting the side beam pins in bracket of Wagon Tippler
Dismantling,removing the broken shafts of Wagon Tippler
Dismantling, removing the broken intermediate,drive,non drive end shafts of Wagon Tippler
Installation of drive and adjacent intermediate shaft
Installation of drive and adjacent intermediate shaft
Cutting, fabricated and installation of resting outer rail beam bottom plate
Cutting the damage plate, fabricated and installation of resting outer rail beam bottom plate
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 10 | Repl of main rails and raising of rails | Replacement of main rails and raising of rails as and when required | 125 | meter | ee_chd2_btps_obra | 182 | |
| 20 | Tightening, repl. of all bolts, clits. | Tightening of all bolts and replacement of clits of main rail. | 400 | meter | ee_chd2_btps_obra | 182 | |
| 30 | Repl,Re fixing of bushes | Replacement/Re-fixing of bushes of Wagon Tippler | 20 | job | ee_chd2_btps_obra | 182 | |
| 40 | Repl of spur gear assembly | Replacement of spur gear assembly by new one/repaired one of Wagon Tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 50 | Repl of rack pinion | Replacement of rack pinion of wagon tippler/rigid coupling set of Wagon tippler/ shaft of Wagon Tippler | 1 | no | ee_chd2_btps_obra | 182 | |
| 60 | OH of reduction gear box | Overhauling of reduction gear box of tippler | 3 | job | ee_chd2_btps_obra | 182 | |
| 70 | Replacement of sector gear | Replacement of sector gear (rack segment) of wagon tippler | 4 | job | ee_chd2_btps_obra | 182 | |
| 80 | Alignment, grouting of tippling base rollers | Alignment, grouting of tippling base rollers after lifting the tippling table base plate of Wagon tippler | 8 | job | ee_chd2_btps_obra | 182 | |
| 90 | Repl,repairing of hopper grill | Replacement/repairing of hopper grill (one grill) of Wagon tippler | 13 | nos | ee_chd2_btps_obra | 182 | |
| 100 | Alignment of tipplers | Alignment of tipplers | 1 | job | ee_chd2_btps_obra | 182 | |
| 110 | Repl,repairing of Outboard Stool | Replacement/repairing of Outboard Stool of Wagon tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 120 | Dismantling,repl of top pivot housing | Dismantling & replacement of top pivot housing of wagon tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 130 | Repl of Wooden block | Replacement of Wooden block of Wagon tippler | 33 | nos | ee_chd2_btps_obra | 182 | |
| 140 | Matching of teeth of sector gear | Matching of teeth of sector gear & rack pinion at both end | 10 | job | ee_chd2_btps_obra | 182 | |
| 150 | Re-fixing lock lever | Re-fixing lock lever after repair/replacement of lock lever bush and pin of Wagon tippler table locking assembly | 1 | job | ee_chd2_btps_obra | 182 | |
| 160 | Repl of top stop locking gears assly | Replacement of top stop locking gears assembly by new one/repaired one | 1 | job | ee_chd2_btps_obra | 182 | |
| 170 | Side beam fixing of tippler | Side beam fixing of tippler | 3 | job | ee_chd2_btps_obra | 182 | |
| 180 | Alignment of motors of wagon tippler | Alignment of motors of wagon tippler along with replacement of their coupling bolts and rubber bushes etc | 8 | job | ee_chd2_btps_obra | 182 | |
| 190 | Servicing of spray line valve Size 4 Inch | Servicing of spray line valve Size 4 inch | 8 | job | ee_chd2_btps_obra | 182 | |
| 200 | Servicing of spray line valve size 3 Inch | Servicing of spray line valve size 3 inch | 5 | job | ee_chd2_btps_obra | 182 | |
| 210 | Servicing of spray line valve Size 2 Inch | Servicing of spray line valve Size 2 inch | 3 | job | ee_chd2_btps_obra | 182 | |
| 220 | OH of overhead spray pumps | Overhauling of overhead spray pumps | 3 | job | ee_chd2_btps_obra | 182 | |
| 230 | Servicing of spray nozzles | Servicing of spray nozzles of each lines of spray system of Wagon tippler | 8 | job | ee_chd2_btps_obra | 182 | |
| 240 | Lifting, proper fixing of VF tray | Lifting tray & proper fixing of vibrating feeder tray after adjusting/replacement of its rubber pads | 8 | job | ee_chd2_btps_obra | 182 | |
| 250 | Changing, fixing of side packing | Changing of side packing and proper fixing to avoid coal leakage | 5 | job | ee_chd2_btps_obra | 182 | |
| 260 | To provide the patches | To provide the patches on leakage points in different chutes of Wagon tippler | 63 | job | ee_chd2_btps_obra | 182 | |
| 270 | Repl of plates of vf tray, chutes | Replacement of liner plates, mother plate of different thickness of VF, Chutes | 1 | mt | ee_chd2_btps_obra | 182 | |
| 280 | Removal of foreign | Removal of foreign M.S. Plate which struck into the chute of vibrating feeder & hopper after gas cutting or by utilizing cutting electrode | 8 | job | ee_chd2_btps_obra | 182 | |
| 290 | Fillings oil in gear box | Fillings oil in gear box of Wagon tippler | 14 | job | ee_chd2_btps_obra | 182 | |
| 300 | Servocoating,Tightening, repl of damaged bolts | Tightening & replacement of damaged bolts of all rack segment fitted rack, couplings & bush housing along with application of servo coat on spur gear rack and pinion | 50 | job | ee_chd2_btps_obra | 182 | |
| 310 | Greasing of all the nipple point | Greasing of all the nipple points of wagon tippler | 50 | job | ee_chd2_btps_obra | 182 | |
| 320 | Repl of break shoe liner | Replacement of break shoe liner of wagon tippler | 10 | job | ee_chd2_btps_obra | 182 | |
| 330 | Repl of main Rail Beam of wagon Tippler | Replacement of main Rail Beam of wagon Tippler by repaired Beam | 1 | job | ee_chd2_btps_obra | 182 | |
| 340 | Provision of backup in main Rail Beam | Provision of backup and seats in inner side of main Rail Beam of wagon Tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 350 | Work on central platform | Work on central platform of wagon tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 360 | Repairing of main rail beam | Repairing of main rail beam of wagon Tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 370 | Repairing of Rollers of coal spill plates | Repairing of Rollers of coal spill plates of wagon tippler | 3 | job | ee_chd2_btps_obra | 182 | |
| 380 | Fab, erection of back support of VF mouth chute | Fabrication & erection of back support of mouth chute of V.F. | 2 | job | ee_chd2_btps_obra | 182 | |
| 390 | Fab., Installing of VF tray supports | Fabricating & Installing of vibrating feeder tray supports (1A,1B,2A,2B) | 2 | job | ee_chd2_btps_obra | 182 | |
| 400 | Repl of coal spill plate | Replacement of coal spill plate of wagon Tippler | 2 | job | ee_chd2_btps_obra | 182 | |
| 410 | Repairing of pit platform of main rail beam | Repairing of pit platform of main rail beam of wagon tippler | 2 | job | ee_chd2_btps_obra | 182 | |
| 420 | Repl of damaged beam of VF | Replacement of damaged beam of vibrating feeder floor 1A,1B, 2A, 2B | 2 | job | ee_chd2_btps_obra | 182 | |
| 430 | Repairing of counter balance beam | Repairing of counter balance beam of wagon tippler | 2 | job | ee_chd2_btps_obra | 182 | |
| 440 | Repairing of MDU base structure | Repairing of base structure of main drive unit of wagon tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 450 | Repairing of damaged split spur gear | Repairing of damaged split spur gear | 2 | job | ee_chd2_btps_obra | 182 | |
| 460 | Fab., of mouth piece of VF | Fabrication of mouth piece of vibrating feeder 1A, 1B, 2A, 2B | 2 | job | ee_chd2_btps_obra | 182 | |
| 470 | Erection of new fabricated mouth piece of VF | Erection of new fabricated mouth piece of vibrating feeder 1A, 1B, 2A, 2B | 2 | job | ee_chd2_btps_obra | 182 | |
| 480 | OH of hoisting system | Overhauling of hoisting system of wagon tippler No. 1,2,3, & 4 | 2 | job | ee_chd2_btps_obra | 182 | |
| 490 | OH of hopper spray pump, line | Overhauling of hopper spray pump & line | 1 | job | ee_chd2_btps_obra | 182 | |
| 500 | Provision of hopper liners, in coal hopper of VF | Provision of hopper liners in coal hopper of vibrating feeder 1A,1B, 2A,2B | 3 | mt | ee_chd2_btps_obra | 182 | |
| 510 | Fab. erection of coal hopper partition stool | Fabrication, erection of coal hopper partition stool of wagon tippler by 12mm,10mm,8mm plate | 2 | job | ee_chd2_btps_obra | 182 | |
| 520 | Raising and re-fixing of mouth piece of coal liner chute of VF | Raising and re-fixing of mouth piece of coal liner chute of vibrating feeder | 13 | job | ee_chd2_btps_obra | 182 | |
| 530 | Repl of back,side plate of mouth piece | Replacement of back/side plate of mouth piece | 4 | job | ee_chd2_btps_obra | 182 | |
| 540 | To attend the coal leakage from top mouth piece | To attend the coal leakage from top mouth piece | 20 | job | ee_chd2_btps_obra | 182 | |
| 550 | Re-fixing,repositioning of side and back supports | Re-fixing/repositioning of side and back supports | 13 | job | ee_chd2_btps_obra | 182 | |
| 560 | Repairing,reposition of side guards of mouth piece | Repairing/reposition of side guards of mouth piece | 10 | job | ee_chd2_btps_obra | 182 | |
| 570 | Repl of buffer block and buffer pads of counter balance beam | Replacement of buffer block and buffer pads of counter balance beam of wagon tippler | 5 | job | ee_chd2_btps_obra | 182 | |
| 580 | Repl of brake drum of thruster brake assly | Replacement of brake drum of thruster brake assembly | 5 | job | ee_chd2_btps_obra | 182 | |
| 590 | Repl of input,output,intermediate pinion of gear box | Replacement of input/output/intermediate pinion of gear box of wagon tippler | 2 | job | ee_chd2_btps_obra | 182 | |
| 600 | Fab. and erection of counter balance beam | Fabrication and erection of counter balance beam of wagon tippler | 1 | mt | ee_chd2_btps_obra | 182 | |
| 610 | Repairing of wagon tippler plate form by cutting and welding | Repairing of wagon tippler plate form by cutting and welding | 15 | running meter | ee_chd2_btps_obra | 182 | |
| 620 | Removing the fallen loaded wagon in pit | Removing the fallen loaded wagon in pit of Wagon Tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 630 | Inserting the side beam pins in bracket | Inserting the side beam pins in bracket of Wagon Tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 640 | Dismantling,removing the broken shafts of Wagon Tippler | Dismantling, removing the broken intermediate,drive,non drive end shafts of Wagon Tippler | 1 | job | ee_chd2_btps_obra | 182 | |
| 650 | Installation of drive and adjacent intermediate shaft | Installation of drive and adjacent intermediate shaft | 1 | job | ee_chd2_btps_obra | 182 | |
| 660 | Cutting, fabricated and installation of resting outer rail beam bottom plate | Cutting the damage plate, fabricated and installation of resting outer rail beam bottom plate | 2 | job | ee_chd2_btps_obra | 182 |
Discover companies most likely to bid on this tender
GST registration certificate (if applicable to bidder)
PAN card details
Experience certificates for similar rail maintenance or heavy mechanical fabrication projects
Financial statements or turnover evidence for the last financial year
EMD submission document (instrument and payment details)
Technical bid documents and any OEM authorizations if required by ATC
ATC/Buyer uploaded documents (ATC file referenced in tender terms)
Extended Deadline
10-Mar-2026, 6:00 pm
Opening Date
10-Mar-2026, 6:30 pm
Key insights about UTTAR PRADESH tender market
To bid, submit the EMD of ₹34,000 and the financial bid along with the technical bid, experience certificates, GST and PAN, plus any OEM authorizations as required by the ATC. Ensure compliance with the 25% quantity variation clause and accurate interpretation of the 66-item BOQ.
Eligibility centers on financial readiness to execute a ₹1,721,109 project, prior experience in heavy mechanical fabrication or rail maintenance, submission of GST/PAN, and compliance with ATC documents such as the OEM authorization and technical bid files.
Submit GST registration, PAN card, experience certificates for similar work, financial statements, EMD submission receipt, technical bid documents, and any OEM authorizations per ATC. Also provide the Buyer uploaded ATC document reference for additional requirements.
The estimated contract value is ₹1,721,109.00 and the EMD amount is ₹34,000. Bidders should ensure payment security and include the EMD document when submitting the bid package.
Delivery begins from the last date of the original delivery order. If the option clause is exercised to increase quantity, the extended delivery time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.
The option clause permits ±25% quantity variation with corresponding delivery extensions. Delivery time extension is calculated per rule, starting from the last delivery date, ensuring a minimum 30-day extension when applicable; ensure compliance in the bid to avoid penalties.
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Border Security Force (bsf)
📍 RAJAURI, JAMMU & KASHMIR
Border Security Force (bsf)
📍 KACHCHH, GUJARAT
Border Security Force (bsf)
📍 JAISALMER, RAJASTHAN
Indian Army
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS