Bid Publish Date
16-Sep-2026, 4:33 pm
Bid End Date
26-Sep-2026, 5:00 pm
Location
Progress
Punjab National Bank seeks procurement of Split Air Conditioner, Wall Mount Type with ISI Marked to IS 1391 (Part 2) (Q2) compliance. The tender lacks listed location, start/end dates, or estimated value, and reports no BOQ items. An option clause allows a quantity variation up to 25% of bid quantity at contract award and during the currency of the contract at contracted rates. Delivery timelines hinge on the last date of the original delivery order, with a minimum extension period of 30 days when calculating additional time. Bidders must align with ATC terms disclosed by the buyer. The absence of BOQ items indicates a possibly framework or selective scope. This procurement focuses on standard-compliant, wall-mounted AC units suitable for banking sector applications and consistent with ISI guidelines.
-
EMD/ security deposit amount not disclosed in the data
Delivery terms governed by the option clause with 25% quantity variation
Compliance with Buyer Added ATC terms is mandatory
Not specified in available data; refer to ATC document uploaded by buyer
Delivery starts from the last date of original delivery order; extension possible with minimum 30 days
Not specified in provided terms; standard tender penalties may apply per ATC
Experience in supplying ISI marked split air conditioners (wall mount) to financial institutions
Demonstrated ability to meet IS 1391 (Part 2) compliance
GST registration and financial stability documentation
Quantity
18
Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2)
Bid Type
Two Packet Bid
Bid Validity
30 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
4
OEM Avg. Turnover
37
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Split Air Conditioner, Wall Mount Type (V3) ISI Marked to IS 1391 (Part 2) (Q2)
Pre-Bid Date
18-09-2026 16:00:00
Pre-Bid Venue
Punjab National Bank, Circle office Guwahati, Nilgiri Mansion, G S Road, Bhangagarh, Guwahati , Assam, Pin 781005
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Kamrup Metro
Delivery Pincodes
781005
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Prasanjit Das | 781005,Punjab National Bank Circle office. Nilgiri Mansion, Bhangagarh, Guwahati | Kamrup Metro | Assam | 781005 | 4 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
GST registration document
Permanent Account Number (PAN) card
Experience certificates for similar split AC wall mount projects
Financial statements showing turnover and stability
EMD/Security deposit documentation (as specified in ATC or tender terms)
Technical bid/compliance certificates for ISI Marked to IS 1391 (Part 2)
OEM authorizations or dealership certificates (if applicable)
Bidders should submit GST, PAN, experience certificates, financial statements, and EMD as per ATC. Ensure ISI Marked to IS 1391 (Part 2) compliance, and prepare OEM authorizations if required. Follow the 25% quantity variation clause and delivery extension formula in the ATC.
Required documents include GST certificate, PAN, experience certificates for similar projects, financial statements, EMD documentation, technical compliance certificates for ISI IS 1391 (Part 2), and OEM authorizations if applicable. Ensure ATC terms are acknowledged and signed.
Delivery begins from the last date of the original delivery order. If quantity is increased, the extension is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum additional time of 30 days. The buyer may extend up to the original delivery period.
Bidders must provide products ISI marked to IS 1391 (Part 2), Q2, and comply with the ATC terms uploaded by the buyer. Ensure wall-mount split AC units meet the ISI certification and installation standards specified.
The buyer reserves the right to increase or decrease the quantity up to 25% of the bid quantity at contract placement and during the contract currency at contracted rates, with delivery time adjustments as defined by the formula.
Verify product labeling, ISI certification marks, and supplier test reports showing conformity to IS 1391 (Part 2). Confirm through OEM certificates or authorized dealer letters, ensuring wall mount split AC units meet the standard before submission.