BHEL Medak Expansion Joint Tender 2026 Telangana - Inlet/Expansion Joint FR6B ISI/AAA TRTL Standards

Bid Publish Date

10-Oct-2026, 3:16 pm

Bid End Date

22-Oct-2026, 6:00 pm

Generate Docs

Progress

Issue10-Oct-2026, 3:16 pm
Corrigendum15-Oct-2026
AwardPending

Key Highlights

  • • Expansion joint variants: OE9713562143, OE9713562160, OE9713563247, OE9713563255, OE9713563263, OE9713563468, OE9713563662
  • • Delivery extension clause: up to 25% quantity change during contract and currency at contracted rates
  • • Delivery time calculation: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • • Inspection regime: Pre-dispatch by Nominated External Agency or Buyer; post-receipt by BHEL at consignee site

Tender Overview

Bharat Heavy Electricals Limited (BHEL) invites bids from qualified suppliers for the supply of expansion joints including models OE9713562143, OE9713562160, OE9713563247, OE9713563255, OE9713563263, OE9713563468, OE9713563662 (Inlet Expansion Joint FR6B/EJ-6B variants) at MEDAK, TELANGANA 502304. The procurement scope is limited to GOODS supply with an estimated value undisclosed and no BOQ items listed. The tender emphasizes a flexible quantity clause permitting up to 25% increase in order quantity during contract execution at contracted rates. Unique delivery timing will be calculated from the last delivery order date, with a minimum extension of 30 days. ABL/ATC terms govern acceptance, while inspection can be pre-dispatch by a Nominated External Agency or post-receipt at the consignee site by BHEL. The tender requires readiness for pre-dispatch inspection and alignment with supplier readiness timelines.

Technical Specifications & Requirements

  • Product category: Expansion joints (Inlet Expansion Joint FR6B, EJ-6B series, and EJ6-2A/2B/2C variants) as per BOQ listings
  • Inspection framework: Pre-dispatch inspection at seller premises or post-receipt inspection at consignee site; Nominated External Inspection Agency/Buyer; costs borne by Buyer for external testing; in-house testing facilities provided by seller
  • Delivery terms: Quotation covers GOODS supply only; delivery period linked to last delivery order; option quantity extension formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
  • Inspection agency: BHEL/TPIA for pre-dispatch and BHEL at consignee site for post-receipt
  • Delivery readiness: Seller to notify Buyer of readiness and provide authorized inspection agency details
  • Compliance: Align with contract specifications and acceptance criteria as per ATC and GTC terms

Terms, Conditions & Eligibility

  • EMD and financial prerequisites: Not specified in data; bidders should prepare standard EMD as per GTE terms
  • Scope: Scope of supply includes GOODS only; no installation or service components
  • Delivery: Extension of delivery period based on option clause; minimum extension 30 days
  • Payment terms: Not specified in data; typical government tender payments follow milestones post-inspection
  • Documents: GST, PAN, experience certificates, financial statements often required; OEM authorizations may be needed
  • Inspection: Pre-dispatch and post-receipt inspection with designated agencies; cost allocation as per clause
  • Compliance: Bidders must comply with option clause, delivery calculations, and acceptance procedures as stated
  • Eligibility: Suppliers with capability to supply expansion joints and participate in procurement through BHEL

Key Specifications

  • Product: Expansion joints (Inlet Expansion Joint FR6B, EJ-6B, EJ6-2A/2B/2C variants)

  • Quantity: Not disclosed; 25% optional increase during contract

  • Delivery: Minimum 30 days extension if option is exercised

  • Inspection: Pre-dispatch by external agency or buyer; post-receipt by BHEL

  • Standards: Not specified in data; ensure OEM compliance and contract adherence

Terms & Conditions

  • Option quantity clause allowing up to 25% increase at contracted rates

  • Delivery period linked to last delivery order date with minimum 30 days extension

  • Inspection regime includes pre-dispatch and post-receipt inspections by specified agencies

Important Clauses

Payment Terms

Not specified in data; bidders should align with standard government terms and post-inspection payment practices

Delivery Schedule

Delivery period calculated from last date of original delivery order; minimum 30 days extension when exercising option clause

Penalties/Liquidated Damages

Not specified in data; expect standard GD/LD terms as per GTC

Bidder Eligibility

  • Experience in supplying expansion joints or related mechanical fabrications

  • Ability to comply with option quantity clause and delivery extensions

  • Compliance with pre-dispatch and post-receipt inspection requirements

Advertisement

Tender Data

Bid Details

Quantity

32

Category

OE9713562143-INLET EXPANSION JOINT-FR6B

Bid Type

Two Packet Bid

Bid Validity

90 (Days)

Bid Type

Service

Evaluation

Group wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Min. Avg. Annual Turnover

55

OEM Avg. Turnover

55

Experience Required

1 Year (s)

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

OE9713562143-INLET EXPANSION JOINT-FR6B , OE9713562160-INLET EXPANSION JOINT FR-6B,EJ-IN-V , OE9713563247-EXPANSION JOINT, EJ6-2A , OE9713563255- EXPANSION JOINT, EJ6-2B , OE9713563263-EXPANSION JOINT, EJ6-2C , OE9713563468-EXPANSION JOINT, EJ6B-1 , OE9713563662-EXPANSION JOINT EJ6B-3

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

180

Delivery Locations

1

Delivery Cities

Sangareddy

Delivery Pincodes

502032

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
MANIK KUMAR MURMU502032,BHEL , HPEP , RamachandrapuramSangareddyTelangana5020328180-

Authority Records

MINISTRY OF HEAVY INDUSTRIESHEAVY INDUSTRY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-10016179.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Corrigendum Updates

1 Update
#1

Update

15-Oct-2026

Extended Deadline

22-Oct-2026, 12:30 pm

Opening Date

23-Oct-2026, 12:30 pm

Advertisement

Categories 4

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates demonstrating prior expansion joint supply

4

Financial statements (audited) for the last 2-3 years

5

EMD/Security deposit as per GTE terms (if applicable)

6

Technical bid documents and specifications compliance

7

OEM authorizations or dealership certificates (if required)

Frequently Asked Questions

Key insights about TELANGANA tender market

How to bid for expansion joint tender in Medak Telangana 2026?

Bidders must submit GST, PAN, experience certificates, and financial statements, along with OEM authorizations if required. Ensure compliance with the option clause, pre-dispatch inspection by a nominated agency, and post-receipt inspection by BHEL. Prepare GOODS-only bid and confirm delivery lead times per last order date with a minimum 30 days extension.

What documents are required for expansion joint tender in Medak?

Required documents typically include GST registration, PAN, prior project experience certificates for expansion joints, audited financial statements, and EMD. Also provide technical bid and OEM authorizations if mandated by BHEL terms. Ensure readiness for pre-dispatch and post-receipt inspections as per ATC.

What are the inspection requirements for BHEL tender in Telangana?

Pre-dispatch inspection may be conducted at the seller premises by a nominated external agency or BHEL; post-receipt inspection occurs at the consignee site. All inspection charges for external labs are borne by the Buyer, with in-house testing facilities provided by the seller.

What is the delivery extension clause for this expansion joint tender?

The option clause allows up to 25% increase in quantity during contract and currency at contracted rates. Additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.

What products are included in this BHEL expansion joint tender 2026?

The tender covers expansion joints including Inlet Expansion Joint FR6B, EJ-6B series variants (OE9713562143, OE9713562160, OE9713563247, OE9713563255, OE9713563263, OE9713563468, OE9713563662) intended for supply, with no BOQ items listed.

What are the key eligibility criteria for supply of expansion joints in India?

Eligibility typically requires demonstrated experience supplying expansion joints, financial stability with audited statements, GST and PAN, and the ability to comply with inspection and delivery terms, including option quantity adjustments and post-acceptance checks by BHEL.

What are the payment terms for BHEL Telangana procurement of expansion joints?

Payment terms are not specified in the data; bidders should expect standard post-inspection payments. Align bids with GTC and ATC requirements, provisional acceptance criteria, and any milestone-based payments after successful pre/post inspections.

How to ensure compliance with pre-dispatch inspection for this tender?

Coordinate with the nominated external inspection agency or BHEL for pre-dispatch readiness. Notify the buyer with approval for inspection, provide access to facilities, and ensure external lab tests are arranged at the bidder's cost as per tender terms.

Advertisement