Bid Publish Date
21-Aug-2026, 11:00 am
Bid End Date
11-Sep-2026, 11:00 am
EMD
₹26,900
Value
₹13,41,028
Progress
Public procurement opportunity for Bharat Sanchar Nigam Limited Portal(bsnl) Optical Time Domain Reflectometer (OTDR) (Q3). Quantity: 11 issued by. Submission Deadline: 11-09-2026 11: 00: 00. View full details and respond.
Quantity
11
Bid Type
Two Packet Bid
Bid Validity
90 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
6
OEM Avg. Turnover
50
Past Performance
80 %
Experience Required
2 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Optical Time Domain Reflectometer (OTDR) (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
38
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Ntr
Delivery Pincodes
520004
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Pullela Srinivas | 520004,DGM MM & IT ,O/o CGMT, 3rd Floor, BSNL Bhavan, Eluru Road, Chuttugunta | Ntr | Andhra Pradesh | 520004 | 11 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
| Category | Specification | Requirement |
|---|---|---|
| PERFORMANCE | Fiber Compatibility | Single Mode |
| PERFORMANCE | Central Wavelength (nm) | 1310 & 1550 for Single Mode; |
| PERFORMANCE | Wavelength Tolerance (±) | 25.0 Or lower |
| PERFORMANCE | Dynamic range@ Max Wavelength | 17 - 50 |
| PERFORMANCE | Event dead zone - Maximum | 1.0 Or lower |
| PERFORMANCE | Attenuation dead zone - Maximum | Up to 8 |
| PERFORMANCE | Distance Measurement Accuracy (±) | 1.0 Or lower |
| PERFORMANCE | Sampling points | 256000.0 - 256000.0 Or higher |
| DISPLAY / STORAGE | Display | TFT, Touch Screen |
| DISPLAY / STORAGE | Display Size | 5.7 - 12.0 Or higher |
| DISPLAY / STORAGE | Internal Storage OTDR traces | 1000 - 50000 |
| DISPLAY / STORAGE | External Storage / Memory Stick Slot provided | SD, Mini SD, Micro SD, USB |
| DISPLAY / STORAGE | External Storage Capacity inclusive in the scope of supply | 32 Or higher |
| VISUAL FAULT LOCATOR (VFL) / VISUAL LIGHT SOURCE (VLS) FOR OTDR | Built-in Visual Fault Locator (VFL) / Visual Light Source (VSL) | Yes |
| POWER METER FOR OTDR | Built-in Power Meter | Yes, No |
| POWER METER FOR OTDR | Power Meter input port | On OTDR Port, Dedicated Port on OTDR, NA |
| POWER METER FOR OTDR | Wavelength Range | 850 nm to 1650 nm, 1200 nm to 1700 nm, NA |
| POWER METER FOR OTDR | Minimum Power measurement range (dBm) | -70 - 0 |
| POWER METER FOR OTDR | Accuracy (Power Meter) (±) | 0 - 10 |
| GENERIC | Connector Tip | PC/UPC, APC |
| GENERIC | Connector / Adapter End | SC, FC, LC |
| ACCESSORIES | Aceesories inclusive in the Scope of Supply (Select included Accessories Only) | Suitable Fiber Inspection Probe, Suitable LAN Cable, DC vehicle battery-charging adaptor (12 V), Suitable VFL/VSL adapter, Carry Case, NA |
| OPERATING CONDITIONS | Minimum Operating Temperature | Up to 0 |
| OPERATING CONDITIONS | Maximum Operating Temperature | Above 50 |
| OPERATING CONDITIONS | Maximum Operating Humidity | Up to 95 |
| WARRANTY | WARRANTY | 1, 2, 3, 5 Or higher |
| CERTIFICATION | Availability of Test Reports from Central Govt/ NABL/ ILAC acredited lab to prove confirmity to the Specifications | Yes, No |