Progress
Organization: Indian Army (Department Of Military Affairs) seeks procurement of multiple items including Cement Bags, PBS 20m by 1m, LDFC Sheets 30m by 4m, Caping Casing 1 inch, Wire 2mm flexible copper, Tube light 2 feet, Cable 2 Core 10 Sqmm, MCB Box, Switch Board, CGI Sheets 8ft, Primer, Paint OG, Suction Pump Assembly, Rubber/Cable/Fittings, and related components. Estimated value is not disclosed; EMD is ₹35,000. Delivery address is in Arunachal Pradesh (LGG, Brown Hill and S’gum). The tender includes 18 items in BOQ with unspecified quantities. A flexible quantity clause allows up to 50% increment/decrement during contract execution at contracted rates. This procurement is targeted at government supply chain for defense logistics and maintenance.
EMD amount: ₹35,000
Delivery location: LGG, Brown Hill and S’gum, Arunachal Pradesh
Quantity variation: up to 50% of bid quantity during/within contract
Minimum additional delivery time: 30 days when adjusting quantity
Submission prerequisites: PAN, GSTIN, Cancelled Cheque, EFT Mandate
Quantity variation up to 50% with contracted rates
Delivery to Arunachal Pradesh address specified by buyer
Mandatory submission of PAN, GSTIN, cancelled cheque, and EFT mandate
Not explicitly stated; ensure payment terms align with standard govt norms and ATC
Delivery begins post order; extended delivery time proportionate to quantity change with minimum 30 days
Not specified in data; verify in tender ATC for LD or performance bonds
Must have PAN, GSTIN
Must provide EFT Mandate certified by bank
Compliance with ATC terms and 18-item BOQ scope
Quantity
1307
Category
Cement Bag
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
RA Qualification Rule
50% Lowest Priced Technically Qualified Bidders
Tech Clarification Time
2 Days
EMD Required
Yes
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
Yes
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Min. Avg. Annual Turnover
3
OEM Avg. Turnover
28
Past Performance
50 %
Experience Required
3 Year (s)
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Cement Bag , PBS 20m by 1m , LDFC Sheets 30m by 4m , Caping Casing 1 inch , Wire 2mm flixible copper , Tube light 2 feet , Cable 2 Core 10 Sqmm , MCB Box , Switch Board , CGI Sheets 8ft , Primer , Paint OG , Suction Pump Assy , Rubber Coupling , Metal Coupling , Pully Assy , Fuel Assy , Injector
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Max Delivery Days
60
Delivery Locations
1
Delivery Cities
Sonitpur
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Sonitpur | Sonitpur | - | - | 135 | 60 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Cement Bag
Cement Bag
PBS 20m by 1m
PBS 20m by 1m
LDFC Sheets 30m by 4m
LDFC Sheets 30m by 4m
Caping Casing 1 inch
Caping Casing 1 inch
Wire 2mm flixible copper
Wire 2mm flixible copper
Tube light 2 feet
Tube light 2 feet
Cable 2 Core 10 Sqmm
Cable 2 Core 10 Sqmm
MCB Box
MCB Box
Switch Board
Switch Board
CGI Sheets 8ft
CGI Sheets 8ft
Primer
Primer
Paint OG
Paint OG
Suction Pump Assy
Suction Pump Assy
Rubber Coupling
Rubber Coupling
Metal Coupling
Metal Coupling
Pully Assy
Pully Assy
Fuel Assy
Fuel Assy
Injector
Injector
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Cement Bag | Cement Bag | 135 | bag | epocell@112 | 60 | |
| 2 | PBS 20m by 1m | PBS 20m by 1m | 31 | nos | epocell@112 | 60 | |
| 3 | LDFC Sheets 30m by 4m | LDFC Sheets 30m by 4m | 7 | nos | epocell@112 | 60 | |
| 4 | Caping Casing 1 inch | Caping Casing 1 inch | 180 | mtr | epocell@112 | 60 | |
| 5 | Wire 2mm flixible copper | Wire 2mm flixible copper | 380 | mtr | epocell@112 | 60 | |
| 6 | Tube light 2 feet | Tube light 2 feet | 52 | nos | epocell@112 | 60 | |
| 7 | Cable 2 Core 10 Sqmm | Cable 2 Core 10 Sqmm | 250 | mtr | epocell@112 | 60 | |
| 8 | MCB Box | MCB Box | 4 | nos | epocell@112 | 60 | |
| 9 | Switch Board | Switch Board | 12 | nos | epocell@112 | 60 | |
| 10 | CGI Sheets 8ft | CGI Sheets 8ft | 100 | nos | epocell@112 | 60 | |
| 11 | Primer | Primer | 50 | ltr | epocell@112 | 60 | |
| 12 | Paint OG | Paint OG | 100 | ltr | epocell@112 | 60 | |
| 13 | Suction Pump Assy | Suction Pump Assy | 1 | nos | epocell@112 | 60 | |
| 14 | Rubber Coupling | Rubber Coupling | 1 | nos | epocell@112 | 60 | |
| 15 | Metal Coupling | Metal Coupling | 1 | nos | epocell@112 | 60 | |
| 16 | Pully Assy | Pully Assy | 1 | nos | epocell@112 | 60 | |
| 17 | Fuel Assy | Fuel Assy | 1 | nos | epocell@112 | 60 | |
| 18 | Injector | Injector | 1 | nos | epocell@112 | 60 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by Bank
Any OEM authorization if applicable (not explicitly stated)
Technical bid documents (as per ATC)
Bidder code creation documents (as per buyer terms)
Key insights about ASSAM tender market
Bidders must submit PAN, GSTIN, cancelled cheque, and bank-certified EFT mandate along with bid. Ensure compliance with ATC provisions, and prepare for quantity variation up to 50%. Deliver to LGG, Brown Hill and S’gum, Arunachal Pradesh as specified in the tender, with readiness for potential 18-item BOQ scope.
Required documents include PAN Card, GSTIN, Cancelled Cheque, and EFT Mandate certified by the bank. Additional bid documents per ATC and any OEM authorizations should be prepared in advance to support the 18-item BOQ scope.
Delivery must occur at LGG, Brown Hill and S’gum, Arunachal Pradesh. Ensure local logistics planning accounts for remote regional access and potential weather-induced delays within the minimum 30-day extension rule.
Yes, quantity can be increased or decreased up to 50% of the bid quantity at contract rates. Additional delivery time is calculated by (increased quantity ÷ original quantity) × original delivery period, with a minimum of 30 days.
Bid security includes an EMD of ₹35,000. Ensure funds availability for security deposit and that payment terms follow ATC; EFT mandate must be bank-certified to facilitate payments.
BOQ lists 18 items including cement bags and multiple hardware components; however, exact quantities are not disclosed in the data provided. Bidder should anticipate comprehensive technical bid and be ready to supply multiple classes of items.
Tender data does not specify ISI/ISO standards; bidders should await ATC for any specific certification requirements and be prepared to demonstrate capability for defense logistics supply.
Penalties/LD terms are not detailed in the provided data. Bidders must review the ATC for LD provisions or performance bonds; ensure adherence to delivery timelines and quality expectations once clarified.