TenderDekho Logo
Active GEM

Rashtriya Ispat Nigam Limited UPS Tender Vizag – 2x60 KVA DSP IGBT PWM 415V 2026

Bid Publish Date

29-Aug-2026, 7:51 pm

Bid End Date

16-Sep-2026, 7:00 pm

Progress

Issue29-Aug-2026, 7:51 pm
AwardPending

Key Highlights

  • Explicit Make/Model disclosure required; catalogues to be uploaded
  • UPS configuration: 2x60 KVA, parallel redundant, DSP control, IGBT PWM inverter
  • Output rating: 415 VAC, 3-phase; erection, testing & commissioning supervision included
  • Delivery flexibility: increase/decrease quantity up to 25% and extended delivery time rules

Tender Overview

Rashtriya Ispat Nigam Limited (RINL) in Visakhapatnam, Andhra Pradesh, invites bids for a 2x60 KVA UPS system with parallel redundancy, DSP control, and IGBT-based PWM inverter. The scope includes erection, testing, and commissioning supervision, with performance guarantees for the output supply system integrated with supplied panels. The tender specifies Make/Model disclosure and submission of technical catalogues. An option clause allows quantity variation up to 25% during contract and extended delivery terms, subject to minimum 30 days. bidders must provide compliance with offered specifications and clear communication channels via the designated email.

  • Organization: Rashtriya Ispat Nigam Limited
  • Location: Visakhapatnam (Vizag), Andhra Pradesh
  • Product category: UPS system with 2x60 KVA parallel redundant configuration and 415 VAC 3-phase supply
  • Unique aspects: Erection, testing, commissioning supervision; performance guarantee requirement; explicit Make/Model and published technical catalogues; bid evaluation tied to offered technical parameters.

Technical Specifications & Requirements

  • UPS type: 2x 60 KVA parallel redundant, DSP control and IGBT-based PWM inverter technology
  • Output: 415 VAC, 3-phase, latest generation UPS
  • Scope: Erection, testing & commissioning supervision; performance guarantee for the output supply system with panels
  • Documentation: Specify Make/Model; upload technical catalogues/brochures; supply as offered
  • Evaluation: Agreement on parameters during technical clarifications; rejection of non-conforming alternatives
  • Delivery terms: Option to increase quantity up to 25%; delivery time calculated with minimum 30 days; delivery period linked to original delivery order

Terms, Conditions & Eligibility

  • Email contact for bid communication: [email protected]
  • Make/Model disclosure mandatory; catalogues to be uploaded; deviations may be rejected
  • IP-address screening: bids from common IPs may be rejected
  • Inspection/Acceptance: as per offered parameters and technical clarifications
  • Bidder eligibility: adherence to ATC, with no blocking from Vizag Steel Plant sub-groups; read bid document carefully
  • Option clause: quantity flex up to 25%; delivery period adjustments per policy; minimum 30 days rule

Key Specifications

  • Product/service: UPS system, 2x60 KVA, parallel redundant

  • Capacities: 60 KVA per unit; parallel redundant configuration

  • Technology: DSP control, IGBT-based PWM inverter

  • Output: 415 VAC, 3-phase

  • Delivery/installation: Erection, testing & commissioning supervision

Terms & Conditions

  • Option to increase/decrease quantity by up to 25% during contract

  • Delivery period linked to the last date of original delivery order, minimum 30 days

  • Make/Model disclosure and catalogues mandatory

  • Inspection & acceptance aligned with bid parameters and technical clarifications

Important Clauses

Payment Terms

Not specified in data

Delivery Schedule

Delivery period commences from the last date of original delivery order; extended time rules apply with minimum 30 days

Penalties/Liquidated Damages

Not specified in data

Bidder Eligibility

  • No hold status in material sub-group 20012 or centrally blocked with VSP

  • Make/Model specific bid with catalogues; no contradictions during evaluation

  • Compliance with bid document terms and technical clarifications

Tender Data

Bid Details

Quantity

1

Bid Type

Two Packet Bid

Bid Validity

120 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

RA Qualification Rule

H1-Highest Priced Bid Elimination

Tech Clarification Time

3 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

Yes

MII Preference Band

L1+20%

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

PSU, UPS, 415Vac, 415 Vac, Eqt 60 KVA, 60kVA

Payment Timelines

Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

90

Delivery Locations

1

Delivery Cities

Visakhapatanam

Delivery Pincodes

530031

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Adisekhar Munga530031,CENTRAL STORES BUILDING VISAKHAPATNAM STEEL PLANTVisakhapatanamAndhra Pradesh530031190-

Authority Records

MINISTRY OF STEELRASHTRIYA ISPAT NIGAM LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9607518.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Authority & Contact

Office Name

Visakhapatnam Steel Plant

Grievance Contact

[email protected]

Categories 2

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for similar UPS installations

4

Financial statements (last 3 years preferred)

5

EMD document (if applicable per tender terms)

6

Technical bid documents and compliance matrix

7

OEM authorization or Make/Model catalogues

8

Technical brochures or catalogues for the offered UPS

9

Any prior inspection/test reports related to similar UPS systems

Frequently Asked Questions

Key insights about ANDHRA PRADESH tender market

How to bid for the UPS tender in Vizag by RINL 2026?

Bidders must submit Make/Model details with technical catalogues, comply with DSP IGBT PWM specifications for a 2x60 KVA UPS, and provide erection/commissioning plans. Include GST/PAN, experience in similar UPS projects, and any OEM authorizations. Ensure no IP address conflicts and communicate via the provided Vizag Steel contact email.

What documents are required for Vizag UPS procurement by RINL?

Submit GST certificate, PAN card, 3-year financial statements, experience certificates for similar UPS installs, OEM authorization, technical bid with compliance matrix, and UPS catalogues. Include EMD document if applicable, and product brochures for the offered Make/Model.

What are the technical specifications for the 2x60 KVA UPS?

The system must be parallel redundant with 2x60 KVA capacity, DSP control, IGBT PWM inverter, and deliver 415 VAC 3-phase output. Erection, testing, and commissioning supervision are required, with performance guarantees for the output supply system integrated with supplied panels.

When is delivery expected after the order in Vizag tender?

Delivery period begins after the last date of the original delivery order, with a minimum extension rule of 30 days. The option clause allows up to 25% quantity variation during contract and potential extended delivery terms as per policy.

What is the acceptance criteria for UPS systems in this tender?

Acceptance will adhere to the offered parameters and technical clarifications, requiring Make/Model conformity, catalogues, and alignment with DSP IGBT PWM specs. Any deviations during evaluation may lead to rejection; ensure documents match the bid offer precisely.

What is required for the erection and commissioning in Vizag?

Bidders must provide supervision for erection, testing, and commissioning of the UPS system, along with a demonstrated performance guarantee for the output supply system when integrated with supplied panels. Provide a detailed erection plan and commissioning schedule.

What is the bidder eligibility for Vizag UPS bid 2026?

Eligible bidders must not be under hold in sub-group 20012 or Centrally blocked with VSP, must supply the specified Make/Model with catalogues, and comply with all bid terms, including inspection acceptance per technical clarifications.

What are the brand/model requirements for bidding?

Bid must specify the exact Make/Model and upload technical catalogues; supply of other than the offered make/model will be rejected. Ensure consistency between offer documents, catalogues, and the technical evaluation.