TenderDekho Logo
Closed GEM

Open Tender for Gas Check-up Pressure Testing,Gas Check-up Pressure Testing,Gas Check-up Pressure Testing,Gas Check in INDORE, MADHYA PRADESH

Bid Publish Date

13-Apr-2026, 5:13 pm

Bid End Date

11-May-2026, 6:00 pm

Generate Docs

Progress

Issue13-Apr-2026, 5:13 pm
Technical05-Nov-2026, 1:24 pm
Financial
Award22-May-2026, 4:02 am
Explore all 4 tabs to view complete tender details

Quantity

65

Category

Lite Ac Service

Bid Type

Two Packet Bid

Categories 64

A tender has been published for Indian Council Of Agricultural Research (icar) Gas Check-up Pressure Testing, Full Gas Charging, Nitrogen Pressure Testing, Internal Leakage Repair, Water Leakage Repair, Drain Pipe Replacement, Insulation Refixing, Copper Condenser Coil Split, Copper Condenser Coil Window, Copper Cooling Coil Split, Cooling Coil Repair, New Compressor, Replacement Compressor OLD, PCB Repair Inverter, PCB Repair Non-Inverter, PCB Replacement Universal with Remote, Capacitor, Contactor, Sensor Transfomer Fuse Replacement, Fan Motor, Blower Motor, Motor Bearing Chenge Noise adustment, Swing flap Motor Blade replacement, New AC Installation, AC Uninstallation, Outdoor Indoor Reinstallation, Copper Piping with insulation and wire, Foam Jet Deep AC Service, Lite Ac Service, Anti-rust Spray External Cleaning, Visiting or Inspection Charge in INDORE, MADHYA PRADESH. Quantity: 65 by. Submission Deadline: 11-05-2026 18: 00: 00. Check eligibility and apply.

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Gas Check-up Pressure Testing , Full Gas Charging , Nitrogen Pressure Testing , Internal Leakage Repair , Water Leakage Repair , Drain Pipe Replacement , Insulation Refixing , Copper Condenser Coil Split , Copper Condenser Coil Window , Copper Cooling Coil Split , Cooling Coil Repair , New Compressor , Replacement Compressor OLD , PCB Repair Inverter , PCB Repair Non-Inverter , PCB Replacement Universal with Remote , Capacitor , Contactor , Sensor Transfomer Fuse Replacement , Fan Motor , Blower Motor , Motor Bearing Chenge Noise adustment , Swing flap Motor Blade replacement , New AC Installation , AC Uninstallation , Outdoor Indoor Reinstallation , Copper Piping with insulation and wire , Foam Jet Deep AC Service , Lite Ac Service , Anti-rust Spray External Cleaning , Visiting or Inspection Charge

Authority Records

MINISTRY OF AGRICULTURE AND FARMERS WELFAREAGRICULTURAL RESEARCH AND EDUCATION DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9215784.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Bill of Quantities (BOQ) 65 Items Sign in for GEM prices

#1

Gas Check-up Pressure Testing

1 Ton As per Specification Document

1 job Delivery: 30 days
#2

Gas Check-up Pressure Testing

1.5 Ton As per Specification Document

1 job Delivery: 30 days
#3

Gas Check-up Pressure Testing

2 Ton As per Specification Document

1 job Delivery: 30 days
#4

Gas Check-up Pressure Testing

3 Ton As per Specification Document

1 job Delivery: 30 days
#5

Full Gas Charging

1 Ton As per Specification Document

1 job Delivery: 30 days
#6

Full Gas Charging

1.5 Ton As per Specification Document

1 job Delivery: 30 days
#7

Full Gas Charging

2 Ton As per Specification Document

1 job Delivery: 30 days
#8

Full Gas Charging

3 Ton As per Specification Document

1 job Delivery: 30 days
#9

Nitrogen Pressure Testing

1 Ton As per Specification Document

1 job Delivery: 30 days
#10

Nitrogen Pressure Testing

1.5 Ton As per Specification Document

1 job Delivery: 30 days
#11

Nitrogen Pressure Testing

2 Ton As per Specification Document

1 job Delivery: 30 days
#12

Nitrogen Pressure Testing

3 Ton As per Specification Document

1 job Delivery: 30 days
#13

Internal Leakage Repair

Per Joint As per Specification Document

1 job Delivery: 30 days
#14

Water Leakage Repair

Split AC As per Specification Document

1 job Delivery: 30 days
#15

Water Leakage Repair

Window AC As per Specification Document

1 job Delivery: 30 days
#16

Drain Pipe Replacement

Per Meter As per Specification Document

1 meter Delivery: 30 days
#17

Insulation Refixing

Per Unit As per Specification Document

1 job Delivery: 30 days
#18

Copper Condenser Coil Split

1 Ton As per Specification Document

1 nos Delivery: 30 days
#19

Copper Condenser Coil Split

1.5 Ton As per Specification Document

1 nos Delivery: 30 days
#20

Copper Condenser Coil Split

2 Ton As per Specification Document

1 nos Delivery: 30 days
#21

Copper Condenser Coil Split

3 Ton As per Specification Document

1 nos Delivery: 30 days
#22

Copper Condenser Coil Window

1 Ton As per Specification Document

1 nos Delivery: 30 days
#23

Copper Condenser Coil Window

1.5 Ton As per Specification Document

1 nos Delivery: 30 days
#24

Copper Condenser Coil Window

2 Ton As per Specification Document

1 nos Delivery: 30 days
#25

Copper Condenser Coil Window

3 Ton As per Specification Document

1 nos Delivery: 30 days
#26

Copper Cooling Coil Split

1 Ton As per Specification Document

1 nos Delivery: 30 days
#27

Copper Cooling Coil Split

1.5 Ton As per Specification Document

1 nos Delivery: 30 days
#28

Copper Cooling Coil Split

2 Ton As per Specification Document

1 nos Delivery: 30 days
#29

Copper Cooling Coil Split

3 Ton As per Specification Document

1 nos Delivery: 30 days
#30

Cooling Coil Repair

Per Unit As per Specification Document

1 job Delivery: 30 days
#31

New Compressor

1 Ton As per Specification Document

1 nos Delivery: 30 days
#32

New Compressor

1.5 Ton As per Specification Document

1 nos Delivery: 30 days
#33

New Compressor

2 Ton As per Specification Document

1 nos Delivery: 30 days
#34

New Compressor

3 Ton As per Specification Document

1 nos Delivery: 30 days
#35

Replacement Compressor OLD

1 Ton As per Specification Document

1 nos Delivery: 30 days
#36

Replacement Compressor OLD

1.5 Ton As per Specification Document

1 nos Delivery: 30 days
#37

Replacement Compressor OLD

2 Ton As per Specification Document

1 nos Delivery: 30 days
#38

Replacement Compressor OLD

3 Ton As per Specification Document

1 nos Delivery: 30 days
#39

PCB Repair Inverter

Per Unit As per Specification Document

1 job Delivery: 30 days
#40

PCB Repair Non-Inverter

Per Unit As per Specification Document

1 job Delivery: 30 days
#41

PCB Replacement Universal with Remote

Per Unit As per Specification Document

1 nos Delivery: 30 days
#42

Capacitor

Per Piece As per Specification Document

1 nos Delivery: 30 days
#43

Contactor

Per Piece As per Specification Document

1 nos Delivery: 30 days
#44

Sensor Transfomer Fuse Replacement

Per Piece As per Specification Document

1 nos Delivery: 30 days
#45

Fan Motor

1 Ton As per Specification Document

1 nos Delivery: 30 days
#46

Fan Motor

1.5 Ton As per Specification Document

1 nos Delivery: 30 days
#47

Fan Motor

2 Ton As per Specification Document

1 nos Delivery: 30 days
#48

Fan Motor

3 Ton As per Specification Document

1 nos Delivery: 30 days
#49

Blower Motor

Per Piece As per Specification Document

1 nos Delivery: 30 days
#50

Motor Bearing Chenge Noise adustment

Per Unit As per Specification Document

1 job Delivery: 30 days
#51

Swing flap Motor Blade replacement

Per Piece As per Specification Document

1 nos Delivery: 30 days
#52

New AC Installation

1 Ton As per Specification Document

1 job Delivery: 30 days
#53

New AC Installation

1.5 Ton As per Specification Document

1 job Delivery: 30 days
#54

New AC Installation

2 Ton As per Specification Document

1 job Delivery: 30 days
#55

New AC Installation

3 Ton As per Specification Document

1 job Delivery: 30 days
#56

AC Uninstallation

1 Ton As per Specification Document

1 job Delivery: 30 days
#57

AC Uninstallation

1.5 Ton As per Specification Document

1 job Delivery: 30 days
#58

AC Uninstallation

2 Ton As per Specification Document

1 job Delivery: 30 days
#59

AC Uninstallation

3 Ton As per Specification Document

1 job Delivery: 30 days
#60

Outdoor Indoor Reinstallation

Per Unit As per Specification Document

1 job Delivery: 30 days
#61

Copper Piping with insulation and wire

Per Foot As per Specification Document

1 feet Delivery: 30 days
#62

Foam Jet Deep AC Service

Per Unit As per Specification Document

1 job Delivery: 30 days
#63

Lite Ac Service

Per Unit As per Specification Document

1 job Delivery: 30 days
#64

Anti-rust Spray External Cleaning

Per Unit As per Specification Document

1 job Delivery: 30 days
#65

Visiting or Inspection Charge

Charges for technician visit to inspect, diagnose faults, and provide repair estimate for AC units, applicable per visit

1 per visit Delivery: 30 days

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover

7

Additional Doc 1 (Requested in ATC)

8

Additional Doc 2 (Requested in ATC)

9

Additional Doc 3 (Requested in ATC)

10

Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria

11

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Corrigendum Updates

1 Update
#1

Update

04-May-2026

Extended Deadline

11-May-2026, 6:00 pm

Opening Date

11-May-2026, 6:30 pm

Technical Results

S.No Seller Item Date Status
1
SUDHIR AIR CONDITIONER'S   Under PMA
-11-05-2026 13:24:31
2
SUPER COOL AIRCON   Under PMA
-25-04-2026 23:00:43

Financial Results

Rank Seller Price Item
L1
SUDHIR AIR CONDITIONER'S   Under PMA
Item Categories : Gas Check-up Pressure Testing,Gas Check-up Pressure Testing,Gas Check-up Pressure Testing,Gas Check
L2
SUPER COOL AIRCON( MSE Social Category:OBC )    Under PMA
Item Categories : Gas Check-up Pressure Testing,Gas Check-up Pressure Testing,Gas Check-up Pressure Testing,Gas Check

Contract / Result Documents 1

Please sign in or create an account to view contract details and download result documents.