Progress
Goa Shipyard Limited invites bids for the procurement of an Antenna Tuning Unit (ATU) for MF/HF system located in South Goa, Goa. The tender references the exclusive condition that only M/S.MARITRONICS INDIA PVT. LTD., CHENNAI may be considered as a bidder. The clause permits quantity adjustments up to 50% of bid quantity during contract execution, with delivery commencing within 7 days of PO placement at Yard 1271. The absence of BOQ items indicates a focused, single-item ATU requirement, with a likely emphasis on compatibility with defense MF/HF configurations and rapid delivery under contract terms. A notable delivery constraint is the strict 07-day requirement post-PO, underscoring urgent supply expectations. The procurement is governed by buyer-added terms that emphasize delivery windows, quantity flexibility, and supplier exclusivity, shaping a high-speed, low-variance supply contract. The emphasis on a single vetted supplier highlights risk management and adherence to security considerations.
Antenna Tuning Unit (ATU) for MF/HF system
Delivery to Yard 1271 within 7 days of PO
Exclusive bidder: MARITRONICS INDIA PVT. LTD., Chennai
Option clause allowing up to 50% quantity variation at contracted rates
No BOQ items; requirement focuses on ATU performance and compatibility with MF/HF bands
Delivery within 7 days from PO; Yard 1271
Exclusive bidder eligibility; MARITRONICS INDIA PVT. LTD. only
Quantity variation up to 50% with proportional delivery time
Yard 1271 delivery within 7 days of PO; extended delivery time calculated for increased quantity with minimum 30 days
Only MARITRONICS INDIA PVT. LTD. (Chennai) eligible; other bidders will be rejected
Purchaser may increase quantity up to 50% during contract at contracted rates; delivery extension rules apply
Only MARITRONICS INDIA PVT. LTD., CHENNAI is eligible
ATU MF/HF system experience preferred
Standard defense procurement documentation required
Quantity
1
Bid Type
Single Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
No
Tech Clarification Time
2 Days
EMD Required
No
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Antenna Tuning Unit (ATU) of MF/HF System
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
SOUTH GOA
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | SOUTH GOA | SOUTH GOA | - | - | 1 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
TECHNICAL
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
GST registration certificate
PAN card
Experience certificates in MF/HF ATU or antenna tuning systems
Financial statements (last 2-3 years)
EMD/Security deposit documentation (as per seller's policy)
Technical bid documents demonstrating ATU compatibility
OEM authorization for MARITRONICS INDIA PVT. LTD. (if applicable)
Any certification or compliance certificates relevant to defense procurement
Key insights about GOA tender market
Bidders must be compliant with the exclusive supplier clause (MARITRONICS INDIA PVT. LTD., Chennai) and submit standard defense procurement documents. Ensure delivery capability within 7 days of PO and align with 50% quantity variation options and associated delivery calculations.
Submit GST and PAN, two to three years of financial statements, experience certificates in MF/HF ATU or antenna tuning systems, OEM authorizations, and technical compliance certificates. Include EMD/Security deposit as per organization policy and defense procurement norms.
Delivery must be completed within 7 days from PO placement to Yard 1271. If quantity increases by up to 50%, delivery time extends proportionally with a minimum 30-day cap; ensure schedule and transport arrangements meet this constraint.
While explicit standards aren’t listed, bidders should demonstrate MF/HF ATU compatibility, reliability, and secure supply chain; verify any defense-standard certifications and OEM authorizations as part of technical compliance documentation.
Only MARITRONICS INDIA PVT. LTD., CHENNAI is eligible as per buyer-added ATC; other bidders will be summarily rejected regardless of qualifications or past performance.
The purchaser may increase quantity up to 50% at contracted rates; delivery time adjusts using a formula ((Increased quantity ÷ Original quantity) × Original delivery period) with a minimum 30 days.
No BOQ items are listed; the procurement is itemized as a single ATU requirement with delivery and exclusivity terms guiding supplier selection and compliance.
The terms do not specify payment terms or warranty; bidders should confirm post-award payment schedules and warranty/AMC expectations during final negotiations with Goa Shipyard Limited.