Progress
Armoured Vehicles Nigam Limited invites bids for procurement under the Department of Defence Production, in Medak, Telangana. The scope references turret electric wires to DRG. NO. 675-97 cb5, without cable assemblies. EMD: ₹4,22,058. Key conditions include a 50% quantity option clause and staggered delivery as per the technical compliance sheet. Inspection is conducted by the CGM or authorised personnel post-receipt, with pre-dispatch inspection at seller premises not universally applicable. This TE is restricted to established suppliers; bidders must align with LTE basis terms. The tender emphasizes vendor code creation and financial/documents submission to participate. The BOQ shows zero listed items, indicating a structured, file-based evaluation. The opportunity targets suppliers capable of meeting strict defence procurement norms and staged delivery timelines. Unique aspects include option-driven quantity adjustments up to 50% and extended delivery time calculations, ensuring flexible supply commitments.
-
-
-
EMD amount and form of payment
Quantity variation up to 50% with linked delivery calculation
Inspection regime and LTE-based eligibility
Bid security of ₹4,22,058 as EMD; EFT Mandate required with bank certification
Staggered delivery; delivery time extended using (increased quantity/original quantity) × original period, minimum 30 days
Not specified in data provided
TE floated as LTE; only established suppliers eligible for technical evaluation
Must have valid PAN and GST registrations
EFT mandate and vendor code submission mandatory
Quantity
138
Bid Type
Two Packet Bid
Bid Validity
180 (Days)
Bid Type
Service
Evaluation
Total value wise evaluation
Inspection Required
Yes
Tech Clarification Time
2 Days
EMD Required
Yes
MII Purchase Preference
Yes
MII Preference Band
L1+20%
MSE Purchase Preference
Yes
MSE Preference Band
L1+15%
MSE Exemption/Relaxation
No
Startup Exemption/Relaxation
No
Bid Splitting Applied
No
Arbitration Clause
No
Mediation Clause
No
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
TURRET ELECTRIC WIRES TO DRG. NO. 675-97 cb5, WITHOUT CABLE ASSY-1, CABLE ASSY-2, CABLE ASSY-3 AND CABL
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
14
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
480
Delivery Locations
1
Delivery Cities
Medak
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Medak | Medak | - | - | 138 | 480 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate certified by bank
Vendor code creation documents
Key insights about TELANGANA tender market
Bidders must submit PAN, GSTIN, Cancelled cheque, and EFT Mandate alongside bid documents for vendor code creation. Ensure TE is eligible as LTE and provide post-receipt inspection readiness; delivery will be staggered with up to 50% quantity variation.
Required documents include PAN card, GST certificate, Cancelled cheque, EFT Mandate certified by bank, and vendor code creation details. Additional supplier qualifications may apply for LTE eligibility; ensure bank certification aligns with EFT mandate.
Delivery is staggered per the technical compliance sheet; quantity may increase/decrease up to 50% during contract. The extended delivery period uses a formula based on quantity ratio, with a minimum of 30 days, applied from the last original delivery date.
EMD amount is ₹4,22,058. Payment terms specify bid security requirements via EFT; ensure the EFT Mandate is bank-certified and submitted with the bid alongside PAN and GST.
Post-receipt inspection is conducted by CGM or authorised personnel; pre-dispatch inspection is only if ATC specifies. The TE is LTE-based and limited to established suppliers for technical evaluation.
Confirm LTE eligibility, provide PAN, GST, EFT Mandate, and vendor code creation. Vendors must be established suppliers; ensure delivery capability for staggered schedules and compliance with inspection regimes.
Key risks include strict LTE eligibility, 50% quantity variation, staggered delivery obligations, and CGM/authorised inspection requirements. Ensure robust EFT compliance and timely submission of vendor documents to avoid disqualification.