Tender Overview

The Power Grid Corporation Of India Limited invites bids for the supply and installation of a WTI—Winding Temperature Indicator—at the Sriperumbudur Substation in KANCHIPURAM, TAMIL NADU. The BoQ specifies one unit of WTI with inbuilt RTD, CCU and Remote Indicator, plus one Manday for installation by a service engineer. Scope includes packing, forwarding, transportation, installation and ensuring compatibility with existing equipment. The package requires firm, all-inclusive pricing with no price variation, and a 60-day completion period from contract zero date. Unique terms allow quantity adjustments up to 25% during or after contract award, at contracted rates. The project emphasizes technical compatibility and high-quality spares. This tender targets suppliers capable of turnkey supply and installation with attention to integration with Sriperumbudur substation systems.

Technical Specifications & Requirements

  • Product: WTI (Winding Temperature Indicator) with inbuilt RTD, CCU & Remote Indicator; Quantity: 1 EA; Scope includes packing, forwarding, transportation, and field installation by a Service Engineer. The WTI must be compatible with existing SRIPERUMBUDUR substation equipment and conform to the site’s operational standards. Delivery period: 60 days from contract zero date; Price basis: Firm & inclusive of all taxes, F&I, P&F charges with no price variation. The BoQ requires that all spares be superior quality and fully compatible with current systems.

Terms, Conditions & Eligibility

  • Delivery/Completion: 60 days from contract zero date; Variation clause allows up to 25% quantity increase/decrease; Extended delivery periods calculated as specified and may extend to achieve original delivery window. - Price: Firm & inclusive; No price variation allowed. - Inspection/Drawings: Dispatch clearance issued by the OIC; Materials must meet contract requirements; No separate inspection noted. - Scope: Packing, forwarding, transportation, supply, and installation at Sriperumbudur Substation; All spares to conform to product specifications.

Key Specifications

  • Product name: WTI (Winding Temperature Indicator) with inbuilt RTD, CCU & Remote Indicator

  • Quantity: 1 EA

  • Delivery period: 60 days from contract zero date

  • Price basis: Firm & Inclusive of all taxes, F&I, P&F charges

  • Compatibility: Must match existing Sriperumbudur substation equipment

  • Scope: Packing, Forwarding, Transportation, Supply and Installation

  • QA/Quality: Spares to conform to product specifications and superior quality

Terms & Conditions

  • 25% quantity variation allowed during/after award at contracted rates

  • 60-day completion period from zero date

  • Firm price with no price variation

  • Dispatch clearance required from Officer In-Charge

  • SRIPERUMBUDUR Substation installation

Important Clauses

Delivery Terms

Delivery must commence from the last date of the original delivery order; additional time formula given; minimum 30 days; possible extension to original delivery period.

Payment Terms

Price is firm and inclusive of all taxes; no explicit advance or milestone terms published in provided data.

Penalties/Liquidated Damages

Not specified in available terms; inference: standard procurement practice may apply LDs for delay beyond 60 days.

Bidder Eligibility

  • Experience in supply and installation of WTI or similar substation instrumentation

  • Financial stability evidenced by last 2-3 years of financial statements

  • Capability to provide on-site installation services by a service engineer

Advertisement

Authority & Contact

Office Name

Corporate Office Gurgaon

Grievance Contact

[email protected]

Tender Data

Bid Details

Quantity

1

Bid Type

Single Packet Bid

Bid Validity

60 (Days)

Bid Type

Service

Evaluation

Total value wise evaluation

Inspection Required

No

Tech Clarification Time

2 Days

Preference & Exemptions

EMD Required

No

MII Purchase Preference

No

MSE Purchase Preference

Yes

MSE Preference Band

L1+15%

MSE Exemption/Relaxation

No

Startup Exemption/Relaxation

No

Bid Splitting Applied

No

Requirements

Arbitration Clause

No

Mediation Clause

No

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Supply and installation of WTI (Winding Temperature Indicator)

Payment Timelines

Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Kanchipuram

Delivery Pincodes

602105

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
Santhosh K John602105,POWERGRID CORPORATION OF INDIA LIMITED, 400KV SUBSTATION, PENNALUR, SRIPERUMBUDUR, Kancheepuram Dist, TAMILNADU-602105KanchipuramTamil Nadu602105115-

Authority Records

MINISTRY OF POWERPOWER GRID CORPORATION OF INDIA LIMITED

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 5

GeM-Bidding-9977034.pdf

Main Document

Other Documents

OTHER

Technical Specification/Buyer Specification Document

TECHNICAL

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Categories 4

Required Documents

1

GST Registration Certificate

2

Permanent Account Number (PAN) Card

3

Experience Certificates for similar WTI supply/installation projects

4

Financial Statements for the last 2-3 years

5

EMD/Security Deposit documents (if applicable)

6

Technical Bid Documents and Compliance Certificates

7

OEM Authorization/Dealer Certification (if applicable)

Frequently Asked Questions

Key insights about TAMIL NADU tender market

How to bid for WTI supply tender in Tamil Nadu 2026

Bidders must register with Gem portal, submit GST, PAN, and experience certificates, provide OEM authorizations if required, and attach the BoQ-compliant technical bid. The contract is firm-priced with 60-day delivery and a 25% quantity option. Ensure compatibility with Sriperumbudur substation equipment and include installation service charges.

What documents are required for WTI procurement in Kanchipuram

Required documents include GST registration, PAN, 2-3 years financial statements, experience certificates for similar WTI projects, OEM authorizations if applicable, and technical bid with compliance statements. Include EMD documentation if specified by the procuring authority and dispatch clearance readiness.

What are the technical specifications for the WTI in this tender

The WTI must be suitable for existing Sriperumbudur substation equipment, include inbuilt RTD, CCU and Remote Indicator, and ensure complete compatibility with current system. All spares must be superior quality and conform to contract requirements and product specifications.

When is the delivery deadline for WTI supply at Sriperumbudur

Delivery must be completed within 60 days from the contract zero date; the zero date is the date of award communication. The clause allows potential quantity adjustments but delivery remains anchored to the original timeline, with extended time as per option clause.

What is the price basis for the WTI installation package

The price is firm & inclusive of all taxes, F&I, P&F charges; no price variation is applicable during the contract. The BoQ item 1 covers WTI supply and item 2 covers installation manday charges, both to be priced inclusively.

What eligibility criteria apply to vendors for this tender

Eligible bidders should have prior experience in supplying/ Installing similar WTI or substation instrumentation, demonstrate financial stability via recent statements, and provide installation capability through a service engineer for Sriperumbudur substation integration.

What are the bulk quantity adjustment terms for this tender

The purchaser may increase or decrease quantity up to 25% of bid/contract quantity either at award or during the contract currency at contracted rates. Additional time allocation follows the specified formula, with a minimum extension of 30 days.

What warranties or post-installation support are expected

From available data, warranties or AMC terms are not explicitly stated; bidders should seek clarification on post-installation support, spares availability, and warranty coverage during contract discussions, ensuring the WTI and related components meet SRIPERUMBUDUR substation standards.

Advertisement